Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z--Flood Damage Reduction Project, Reach 1, Mississippi River, Davenport,Scott County, Iowa

Active
W912EK-10-R-0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves extensive construction and infrastructure work as part of a flood damage reduction project located in Davenport, Iowa, along the Mississippi River. The scope encompasses a wide range of activities including tree removal, clearing, grubbing, cutting sod, and removal of various existing structures such as metal bollards, sidewalks, sewers, water mains, and aggregate bases. Work also includes milling and salvaging asphalt pavement, relocating fiber optic and electric power lines, excavation, grading, and installation of steel H-pile and sheet pile foundations. Additional tasks cover the construction of colored and textured concrete floodwalls, concrete cutoff walls, earthen embankments, gatewells, precast concrete storm sewers and manholes, as well as fabrication and installation of metal closure gates and panels for railroads and vehicles. Further construction elements include encasement and sealing of utilities, placement of aggregate and salvaged asphalt base courses, construction of concrete access roads, sidewalks, miscellaneous pavements, and installation of metal grating, handrails, ladders, pedestrian gates, and new lighting fixtures. Miscellaneous mechanical and electrical work, topsoil placement, landscaping, tree planting, and seeding are also part of the project scope. The contract duration is set for 510 calendar days following the Notice to Proceed, with an estimated cost range between $1 million and $5 million. The contract is categorized under NAICS code 237990 and is open to businesses within a size standard of $33.5 million. Solicitation documents were planned for release around late August 2010, and site inspections can be coordinated through the U.S. Army Corps of Engineers local office in Davenport.

General Info

Flood damage reduction in Davenport, Iowa; construction, utilities, landscaping; 510 days; $1-5 million.

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Rock Island P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT Rock Island IL 61204-2004 US

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhasePresolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 15, 2010 to Jun 1, 2010. The notice description changed.

Notice updated

The response deadline was removed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
The work required by this contract includes, but is not limited to, tree removal; clearing and grubbing; cutting sod; removal of metal bollards, concrete sidewalks, storm and sanitary sewers, water mains, and aggregate bases; milling and salvaging asphalt pavement; removal and relocation of fiber optic and electric power lines; excavation and grading; installation of steel H-pile and sheet pile; construction of colored and textured concrete I and L floodwalls; construction of concrete cutoff walls; masonry work; construction of earthen embankment; construction of gatewells for storm and sanitary sewer lines; installation of precast concrete storm sewers and manholes; fabrication and installation of railroad and vehicular metal closure gates; fabrication of metal closure panels; encasement and sealing of various utilities (fiber optic, water, electric, and sewer); placement of salvaged asphalt base course; placement of aggregate base course; construction of concrete access road, sidewalk, and miscellaneous pavement; fabrication and installation of metal grating, handrails, ladders, and ornamental pedestrian gate; installation of new lighting fixtures; miscellaneous mechanical and electrical work; placement of topsoil; and tree planting, landscaping, and seeding work. Place of Performance Davenport, IA Completion: 510 Calendar after Notice to Proceed The estimated price range of the project is $1,000,000.00 to $5,000,000.00. The NAICS Code for this project is 237310 with a Small Business Size Standard of $33.5 MILLION. The solicitation documents will be posted to www.fbo.gov on or about August 31, 2010. Arrangements for inspecting the site may be made with: Mr. Paul C. Holcomb, Area Engineer, Central Area Office U.S. Army Corps of Engineers 5235 Grand Avenue Davenport, Iowa 52807-1014 Telephone Number: +1 (555) 000-0000, ext. 6701 (Collect calls not accepted.)

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS