Z--Friant Dam Compressor System Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The solicitation for the Friant Dam Compressor System Replacement, identified by number 140R2026B0002, is a sealed bid procurement issued by the U.S. Department of the Interior’s Bureau of Reclamation, Mid-Pacific Region, with a total small business set-aside under FAR 19.5. The contract focuses on replacing the dam’s compressor system, including the installation of a new Electronic Processing Unit Control Cabinet, a communication card for the Central Valley Automated Control System, gate position inclinometers, and a draw-wire encoder for the existing float system. All work must comply with Division 01 General Requirements and adhere to strict specifications covering material delivery, equipment handling, hazardous waste packaging, and environmental controls. Materials must be delivered in original, unopened containers not exceeding five gallons, properly labeled with manufacturer details, batch numbers, and dates, while piping and equipment must be protected from contamination and damage during shipment and storage. Hazardous materials, including PCB-contaminated oil and used oil, must be stored in DOT-approved, weatherproof steel containers in compliance with 22 CCR and 49 CFR regulations. The performance period is 670 calendar days following notice to proceed, with a mandatory seven-day start window, and work is constrained by a limited service interruption window from September 1 through December 31, requiring any interruption exceeding four hours to be documented in the construction schedule. The Government will evaluate bids solely on price reasonableness and unbalanced pricing under FAR 14.408-2(a) and 14.404-2(b), awarding to the lowest responsive and responsible bidder. All bids must cover every line item in the price schedule, including mobilization, commissioning, and miscellaneous metalwork, and must include a 60-day acceptance period. Contractors must be registered in SAM with a valid UEI and banking information, and compliance with federal labor wage determinations under General Decision CA20260018 is required. Insurance mandates include $10 million in general liability, $2 million in automobile coverage, and up to $5 million for pollution, aviation, and watercraft liabilities where applicable. Performance oversight will be conducted through CPM schedules and CPARS, while all invoices must be submitted electronically via the Treasury’s IPP system with supporting documentation, and no personally identifiable information may be included. Final acceptance occurs only at the jobsite after installation and testing, with Government quality assurance testing overriding
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Mp-Regional Office
Same awarding agency
