Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on December 21, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Herbert Hoover Dike Rehabilitation Project, Culvert 7, Culvert 9, and Taylor Creek Culvert Abandonment, Okeechobee County, Florida

Awarded
W912EP-13-R-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Herbert Hoover Dike Rehabilitation Project involves construction work at Culvert 7, Culvert 9, and Taylor Creek Culvert in Okeechobee County, Florida. The scope of work includes installing a cutoff wall through abandoned culverts, creating a drainage blanket, re-paving the dike crown, and performing incidental tasks. Specific requirements for the Taylor Creek Culvert include the removal of grouted riprap and the construction of a new embankment section, with overall project requirements including turbidity and environmental monitoring. This small business set-aside acquisition has an estimated construction magnitude between 1 million and 5 million dollars. The performance period is approximately 305 days following the notice to proceed, with an additional 90 days allocated for sodding. Contract awards are based on best value, evaluating technical merit, past performance, and price. Eligible offerors must be registered in the System for Award Management and adhere to specific limitations on subcontracting.

General Info

Contract Value

$905,007.12

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Jacksonville P.O. Box 4970, Jacksonville FL 32232-0019 US, FL, USA

Set-Aside

NONE

Award Issued Date

Documents

8

Amendment 0001 to Solicitation W912EP-13-R-0001

DOC, High priority: read this first2 pages · amendment
High

HHD Rehabilitation Project - Culvert 7, 9 and Taylor Creek Culvert Abandonment

PDF, High priority: read this firstspecifications
High

HHD Rehabilitation Project - Section 01 30 00 Administrative Procedures

PDF, High priority: read this firstspecifications
High

W912EP-13-R-0001 Herbert Hoover Dike Rehabilitation Project

PDF, High priority: read this first183 pages · ifb
High

7/9 TCC Site Visit Sign-in Sheet

PDF, Low prioritysite-visit-log
Low

HHD_-_C-07_Abandonment_10.15.12.pdf

PDF

HHD_-_C-09_Abandonment_10.15.12.pdf

PDF

HHD_-_TCC_Abandonment_10.15.12.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts1 person available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
Robert MeekieContract Specialist

Full Description

Show more
DESCRIPTION OF WORK: Work at Culvert 7, Culvert 9 and Taylor Creek Culvert includes construction of a cutoff wall through abandoned culverts, a drainage blanket, re-pavement of the dike crown and incidental related work. Additional work at Taylor Creek Culvert includes removal of grouted riprap and construction of a new embankment section. Work also includes environmental monitoring and turbidity monitoring. PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government. Proposals will be evaluated on Technical Merit, Past Performance and Price. The performance period is approximately 305 days after receipt of NTP and 90 days for sodding. Magnitude of construction is between $1,000,000.00 and $5,000,000.00. THIS IS A SMALL BUSINESS SET-ASIDE ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. THE OFFEROR MUST ADHERE TO THE LIMITATIONS ON SUBCONTRACTING CLAUSE FAR 52.219-14 IN THE SOLICITATION/CONTRACT. The solicitation will be issued on or about 18 October 2012 with bids due on or about 20 November 2012. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. you must be registered in the system for award management (SAM), per FAR clause: (52.204-99 - system for award management registration (deviation 2012-o0015)(August 2012),in order to receive an award from this solicitation. The SAM website is located at http://www.sam.gov. NAICS Code 237990, size standard $33.5 million.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS