Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Z -- Hermit Lake Water System, Phase 1

Active
NEAT-03-099Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of a new water well system at Hermit Lake in the White Mountain National Forest, New Hampshire, under NAICS code 237110. The scope of work includes labor, equipment, materials, mobilization, drilling, casing, water sampling, and testing. Given the remote location at an elevation of 3,875 feet, the contractor is expected to stage materials at an elevation of 2,000 feet before airlifting them to the job site. The project timeline is 30 calendar days, with a targeted start date around May 1, 2003, and the contract value is estimated between $25,000 and $100,000. This contract is a total small business set-aside issued by the Allegheny National Forest office under the Department of Agriculture. The solicitation number for reference is NEAT-03-099, and the point of contact is Contract Specialist William L Clark. The nature of the work emphasizes the challenges posed by the remote, high-elevation location, requiring specialized logistics and careful planning to ensure timely and effective well installation.

General Info

Installation of water well system at Hermit Lake, NH, remote location, 30-day timeline, small business set-aside.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

White Mountain NF, Saco Ranger District, Conway, NH 03818, PA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Office AddressWARREN, PA, 16365, USA
Contacts
William L ClarkContract Specialist

Full Description

Show more
Hermit Lake Water System, Phase 1 - Well Installation, White Mountain National Forest, NH. NAICS - 237110. Work includes, but is not limited to: labor, equipment, materials, mobilization, drilling, casing, water sampling and testing, for a new well installation, at a remote area, on the White Mountain NF, NH. Job site is at the Hermit Lake Area, elevation 3,875 feet. Contractor will likely stage materials at 2000 feet, then airlift equipment and materials to the job site. Contract time - 30 calendar days. Start on/around May 1, 2003. Cost Range: $25,000 - $100,000.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS