Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on August 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Industry Day Invitation, Hurricane Ridge Water System, Olympic NP

Closed
140P8324R0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 12 hours ago

DEADLINE

in 19 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

WA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

event

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr Olym MABO(83000)
Contacts1 person available
OfficePORT ANGELES, WA, 98362, USA
Office AddressPORT ANGELES, WA, 98362, USA

Full Description

Show more
Industry Day, Olympic National Park, Hurricane Ridge Water System Rehabilitation Site Visit & Discussion The National Park Service, CON OPS West, Olympic Major Acquisition Buying Office, seeks to clarify and refine the government's requirements for an upcoming procurement to rehabilitate the Hurricane Ridge water system. Work for this procurement consists of providing all labor, materials, tools, and other equipment necessary replace all original (1950s & 1960s) galvanized steel and asbestos cement water line and appurtenances with upsized fusion-welded high-density polyethylene water line for the entire Hurricane Ridge area, including water line extension to the Hurricane Hill picnic area comfort stations. Water line shall be replaced within the same trench as the existing alignment due to archaeologically significant areas. The 100,000-gallon in-ground reinforced concrete reservoir shall be rehabilitated by media blasting the interior surfaces followed by coating, curing, pressure testing, and disinfection. Meadow vegetation above the tank shall be salvaged, soil stockpiled, and the concrete reservoir cleaned and prepped to at least 6 below the roof-to-wall seam to seal and protect the reservoir from infiltration from above. Reservoir piping shall be reconfigured to facilitate unidirectional flushing. New hardwired telemetry, alarms, and pump control between the well/treatment building, storage reservoir, and temporary utility building shall be installed to allow source meter and reservoir level to be monitored from both the treatment building and the temporary utility building. Obsolete components of the original surface water treatment facility shall be demolished. Topics for discussion include the following: Archaeological monitoring will be required, and portions of trenching will require screening of all material for artifacts. Native subalpine meadow vegetation shall be salvaged to the extent possible, for replacement after trenches are backfilled. Equipment and approach to work shall minimize impacts to vegetation. Peak visitation to Hurricane Ridge directly correlates with the construction window during favorable summer weather conditions, and a construction zone will need to be established for safety. Pedestrian and vehicle traffic control may be required for portions of the work. Temporary restroom and potable water filling services will need to be retained for employees and visitors during water line replacement and reservoir rehabilitation. SITE VISIT: A site visit will be held at Hurricane Ridge on Thursday, September 12, 2024 at 10:30 am. Hurricane Ridge is located 17 miles south of Port Angeles, WA near the end of Hurricane Ridge Road, accessed off Mount Angeles Road. The Olympic National Park entrance station is located five miles from Mount Angeles Road; all attendees who RSVP will be included on a list to have the park entrance fee waived for this site visit only. Attendees should park at the far (west) end of the main Hurricane Ridge parking lot (located ~12 miles past the entrance station) and meet up with NPS representatives at the temporary utility building located near the southwest corner of the main parking lot. Offerors are highly encouraged to attend the scheduled site visit to inspect the site and to ensure they fully understand the requirement and conditions that may affect the cost of the project, specifications, and performance. RSVP To: Kerri Cook, Kerri_Cook@nps.gov by C.O.B. Tuesday, September 10, 2024. RSVP should include both company name and individual attendee name(s).

More opportunities from Department Of The Interior → Pwr Olym MABO(83000)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS