Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--INSTALL BURIED FILTERED WATER TANK IAW CONSTRUCTIO

Closed
140P8225B0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 14 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The National Park Service, ConOps West, is seeking bids for the installation of a buried filtered water tank at Haleakalā National Park in Maui, Hawaii. The project includes the installation of the tank per detailed construction specifications, removal and disposal of an existing 4-inch water line, and site work including grading and drainage adjustments. Additionally, there are three contract options: Option A involves installing a vehicle turnout with a compacted gravel surface and associated concrete walls and metal railings; Option B pertains to constructing a similar turnout with a hardened asphalt surface; and Option C covers the application of exterior tank coatings. The contract is a firm-fixed-price award anticipated to fall between $1 million and $5 million, and the entire acquisition is set aside exclusively for small businesses under NAICS code 237110, with a $45 million size standard. The solicitation will be issued as an Invitation for Bid (IFB) in accordance with FAR Subparts 14 and 36 and will only be available electronically through SAM.gov, with no hardcopy distributions. Prospective offerors must hold an active registration in SAM.gov with a Unique Entity Identifier (UEI) and submit their representations and certifications online prior to solicitation close. The work site is solely at Haleakalā National Park, where continuous operation of the existing water system must be maintained throughout construction, requiring careful coordination and adherence to sequencing constraints. Performance requirements include structural compliance with referenced technical standards such as ACI 318, geotechnical recommendations, and detailed construction drawings prepared by Kaula AE, LLC. Inspection and acceptance activities will be conducted on-site, with the contractor responsible for verifying utility locations, protecting existing infrastructure, managing quality control, and final site restoration. The contracting officer, Michael Davidson, is the primary point of contact for this opportunity.

General Info

Install buried filtered water tank at Haleakalā NP with grading, removal, turnouts, coatings; small businesses only.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

HI

Set-Aside

NONE

Documents

16

Geotechnical Recommendations - Install Buried Filtered Water Tank - Haleakalā

PDF, High priority: read this first42 pages · specifications
High

HALE 259822 Basis of Design - 50,000 Gallon Filtered Water Tank

PDF, High priority: read this firstspecifications
High

Haleakala National Park - Buried Filtered Water Tank Structural Calculations

PDF, High priority: read this first84 pages · specifications
High

Haleakala National Park - Headquarters Area Water Collection System Drawings

PDF, High priority: read this first28 pages · specifications
High

Haleakala National Park - Install Buried Filtered Water Tank & Appurtenances Specifications

PDF, High priority: read this firstspecifications
High

Haleakala National Park - Install Buried Filtered Water Tank Product Information

PDF, High priority: read this firstspecifications
High

Hawaii General Decision Number HI20250001 Wage Determination

PDF, High priority: read this first19 pages · wage-determination
High

RFI 001 - Haleakala National Park Buried Filtered Water Tank

PDF, High priority: read this first5 pages · q-and-a
High

Solicitation 140P8225B0003 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

Solicitation 140P8225B0003 Amendment 0002

PDF, High priority: read this first1 page · amendment
High

Solicitation 140P8225B0003 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

Solicitation 140P8225B0003 - Contract Bid Schedule

DOCX, High priority: read this first1 page · bid-schedule
High

Solicitation 140P8225B0003 - Install Buried Water Tank at Haleakala National Park

PDF, High priority: read this first40 pages · ifb
High

Standard Form 25A - Payment Bond

PDF, Low priority3 pages · payment-bond
Low

Standard Form 25 Performance Bond

PDF, Low priority4 pages · performance-bond
Low

B08_Attach_7_APE_Map_for_Rock_Disposal___Fencing.JPG

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jul 15, 2025 to Jul 22, 2025. The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from Jul 22, 2025 to Jul 25, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr Hono MABO(82000)
Contacts1 person available
OfficeHONOLULU, HI, 96850, USA
Office AddressHONOLULU, HI, 96850, USA
Contacts

Full Description

Show more
HALE INSTALL BURIED FILTERED WATER TANK IAW CONSTRUCTION SPECIFICATIONS

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS