Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z--Justification for Other than Full and Open Competition

Active
P14PS01337Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The National Park Service (NPS), Northeast Region, seeks to modify its existing contract with Frontier Services, Inc. to perform additional excavation and hazardous waste remediation work at Valley Forge National Historical Park in Pennsylvania. This contract modification is required to address newly identified areas of soil contamination containing hazardous substances such as asbestos, arsenic, lead, mercury, and polycyclic aromatic hydrocarbons, as part of an ongoing site cleanup conducted under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The original contract was competitively awarded and has been modified multiple times, totaling nearly $8.8 million in value. The current modification adds $722,000, raising the total contract to approximately $9.5 million. The work is urgent and critical due to the discovery that contaminated soils remain just beyond the initially excavated zones; this additional excavation is prerequisite for continuing remediation downstream and to prevent recontamination. Due to the project's time-sensitive and technical nature, Frontier Services, Inc., the incumbent contractor, is uniquely qualified and presently mobilized on-site, making it impractical and cost-prohibitive to engage a different contractor. The modification is authorized under federal acquisition regulations allowing for other than full and open competition in cases of unusual and compelling urgency. Market research was not conducted for these added services because immediate action is necessary to avoid delays that could generate significant daily costs and risk environmental setbacks. The contracting officer has determined the contractor’s pricing to be fair and reasonable, consistent with prior evaluations, and appropriate measures are in place to ensure future procurements will be conducted competitively once this phase is completed.

General Info

NPS modifies contract with Frontier Services for urgent hazardous waste excavation at Valley Forge.

NAICS

238910 - Site Preparation Contractors

Place of Performance

CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
UNITED STATES DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION AND WAIVER OF PUBLICATION REQUIREMENTS FOR VALLEY FORGE NATIONAL HISTORICAL PARK JUSTIFICATION AND APPROVAL (J&A) 1. Identification of the agency and the contracting activity. This document constitutes justification and approval for other than full and open competition for the acquisition described herein and it is executed on behalf of the National Park Service (NPS), Northeast Region (NER), Philadelphia, PA. 2. Nature and/or description of the action being approved. The National Park Service, Northeast Region (NPS NER), proposes to modify the existing contract P12PC20530 with Frontier Services, Inc. to perform additional work by way of excavation expansions for Hazardous Waste and Site Restoration at Valley Forge National Historical Park, King of Prussia, PA. 3. A description of the supplies or services required to meet the agencys needs (including the estimated value). The proposed modification will allow the contractor to provide all necessary labor, material, equipment, and supervision to complete additional work required to successfully excavate and restore areas of soil contaminated by toxic/hazardous materials such as asbestos, arsenic, lead, and mercury, along with several other chemical pollutants. NPS Denver Service Center (DSC) devised the statement of work (SOW) and originally set these operations up as unpriced options. The original contract was awarded competitively utilizing Source Selection procedures. A total of 12 modifications have been issued thus far for this particular contract in the amount of $2,481,947.89 primarily from exercising pre-priced options resulting in a contract total of $8,763,583.34. The Valley Forge Asbestos Release Site (Site) cleanup is being conducted under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The remedy chosen to clean up the Site was detailed in the Record of Decision (ROD) published by NPS in 1997. In the spring of 2010, the Commonwealth of Pennsylvania and the federal government reached a cost-sharing agreement and dedicated funds for the remediation of the Site. The Commonwealth of PA concurred with the remedy detailed in the ROD. NPS has been delegated lead agency status under CERCLA and is therefore responsible for ensuring the remediation is conducted in accordance with the ROD. The ROD identified shallow excavation and off-site disposal of contaminated soils as the selected remedy for the Site. This involves excavation of contaminated soils located within 2 feet of the ground surface, off-site disposal of excavated contaminated soils, reclaiming completed excavations with clean soils to restore pre-existing conditions, and implementing institutional controls (ICs) to manage certain areas where subsurface contamination (below 2 ft.) will remain on the Site. The ROD also identified the chemicals of concern (COCs) for the Site which are asbestos, metals (arsenic, lead and mercury) and several polycyclic aromatic hydrocarbons. The ROD established Remediation Goals (RGs) for each COC. RGs are numerical values above which unacceptable human health or ecological risks are present. Soil concentrations greater than the RGs indicate the soil poses unacceptable risks and requires removal and off-site disposal. Soil concentrations less than the RGs indicate the soil does not need to be removed. Finally, the ROD requires that verification tests be performed to ensure all contaminated soil located within 2 feet of the ground surface are removed from the Site. In 2012, NPS prepared a Remedial Design Report (RD Report). The RD Report was part of the contract documents provided to all contractors during the solicitation of this contract. The objective of the RD Report was to translate the ROD into specific technical requirements for the selected remediation contractor to follow to ensure the remedy outlined in the ROD will be achieved. Initial Site investigations identified 11 areas of concern (AOCs) within the Site. The RD Report presented excavation boundaries within the 11 AOCs that were based on extent of soil known to be contaminated with COCs above the established RGs. The initial excavation boundaries were developed based on analytical results available from previous site investigations. In accordance with the ROD, the RD Report also provides specific steps to be taken after each excavation is completed to the initial design dimensions (as presented in the RD Report). One of these steps is the collection of verification samples to be collected at specific intervals from the excavation floor and excavation sidewalls and analyzed for the COCs to determine if all contaminated soil present within 2 feet of the ground surface has been removed. If the verification samples indicate concentrations of any of the COCs are above the RGs NPS collects additional soil samples to delineate boundaries for the extent of additional contaminated soil present within the AOC. NPS prepares a new excavation boundary design based on the results of the verification and new boundary samples. The contractor has performed the necessary excavations and removed the contaminated soil as indicated in the initial design presented in the RD Report for this AOC (WCRN Reach 1 and 2). Analysis of verification samples indicate that contaminated soil remains along the excavation boundaries. NPS collected new boundary samples to delineate the extent of contaminated soil that remains within the WCRN Reach 1 and 2 AOCs. NPS has prepared revised excavation boundaries for this AOC based on the analytical results. The contractor will now need to perform additional remediation services in the area immediately beyond the initial excavation area established in the original design. The contaminated soil is located along upstream portions of a surface water body located within the AOC. This new work is on the critical path because the contractor cannot proceed with remediating areas located adjacent to the downstream portion of the surface water body (WCRN Reach 3) that is in the scope of the original contract until the additional contaminated soil located upstream is removed. NPS was made aware of this on June 27, 2014. This current modification will increase the total contract price in the amount of $722,000.00 from $8,763,583.34 to $9,485,583.34. 4. Identification of the statutory authority permitting other than full and open completion. Federal Law 41 U.S.C. 253, as implemented by Federal Acquisition Regulation (FAR) 6.302-2, authorizes under certain conditions, including unusual and compelling urgency, contracting without providing for full and open competition. 5. Demonstration that the proposed contractors unique qualifications or the nature of the acquisition requires use of the authority cited. Frontier Services is highly familiar with the excavation process since they have performed these services in the past. Furthermore, the contractor is currently mobilized on the site, and if the services of another contractor were to be procured, the government would incur additional costs associated with mobilization/demobilization of their equipment, staff, and site possibly at the cost of several hundreds of thousands of dollars to the government. Additionally, the area that now requires further excavation is on a critical path, as it lies upstream of the AOC identified as WCRN Reach 3. Remediation of downstream areas cannot be completed until upstream areas have been completed (otherwise the potential exists for contaminated soil located upstream to be transported and re-contaminating cleaned-up areas downstream). Therefore, the contractor is currently at a stand-still and is incurring costs as a result of the delay. These costs will ultimately be transferred back to the government. The COR estimates that the projected cost of this delay is $7,700 per calendar day. Upon execution of the modification and once the additional excavation commences, the total projected time for project completion at this particular stage will last from 4-6 weeks taking into consideration the possibility for any inclement weather. 6. A description of the efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies. Frontier Services Inc., has performed the work in the proposed modification many times already. The newly discovered area is on the critical path and it needs immediate attention. It has been determined that the urgently needed services described in paragraphs three and five above can only be furnished in the required time frame by the incumbent contractor, Frontier Services, Inc. who is currently mobilized and performing the work at the Valley Forge. 7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable. At the time of award, the Contract Specialist met with the Project Manager of Valley Forge Site, and determined that their proposal was 7.5% below the government estimate. The negotiation team performed a price comparison and determined that the price set forth was considered to be fair and reasonable in accordance with FAR 15.404-1(B)(2)(v) The rates that utilized for the proposal regarding the new excavation will not change from the rates utilized at the time of contract award. 8. A description of the market survey conducted and the results or a statement of the reasons a market survey was not conducted. It has been determined that Frontier Service, Inc., as set forth in paragraphs 5 & 6 above, who is currently mobilized and performing the excavation services at the site in Valley Forge is the only firm capable of performing the required excavations in the required time frame. Therefore, market research was not conducted for these additional excavations and analyses to preclude any potential lapse in site care and maintain the continuity of operations. The mission of the National Park Service to ensure that Valley Forge National Historical Park be remediated and successfully rid of all potentially harmful and hazardous chemical which lie beneath its soil for the safety and well-being of not only the tourists but also those individuals in the surrounding areas. 9. Any other facts supporting the use of other than full and open competition. Time constraints associated with synopsis would seriously delay this contract action. 10. A listing of sources, if any, that have expressed, in writing, an interest in the acquisition. It is impracticable to solicit sources other than Frontier Services, Inc. due to the time constraints and the critical nature of the required services. Frontier Services has been performing satisfactorily. 11. A statement of actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for supplies or services required. Due to its unusual and compelling urgency this procurement is a one-time exception to the practice of procuring services through full and open completion. Adequate controls are in place to ensure that subsequent acquisition of services is through full and open competition. APPROVAL Based on the above and in accordance with FAR 6.302-2 (b) (2), this justification and approval is accurate and complete to the best of my knowledge. Submitted by: Neil Gilligan, CONTRACTING OFFICER Date Patrick Breen Date WASO Bureau Competition Advocate

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 20 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS