Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of The Interior was posted on July 2, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--KDK AK AVGAS TANK(S) REMOVE & REPLACE - AMEND 001

Awarded
140F0720Q0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key deliverables include the provision of a Certified Industrial Hygienist, a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and a one-year workmanship guarantee. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of specific insurance coverages, including automobile liability and workers compensation. Performance must begin within 14 days of the Notice to Proceed, and the contractor must adhere to Davis Bacon Act wage determinations. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$18,980.61

NAICS

562910 - Remediation Services

Place of Performance

AK

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 13, 2020 to Jul 20, 2020. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Fws Alaska Regional Office
Contacts1 person available
OfficeANCHORAGE, AK, 99503, USA
Office AddressANCHORAGE, AK, 99503, USA
Contacts

Full Description

Show more
Amendment 001 to Solicitation 140F0720Q0022 Kodiak AK Remove and Replace Legacy Tank System Vendor Questions/Answers Solicitation Extended / Quotes due: 7/20/2020, 1700 ET 1. Are payment or performance bonds required for this contract? No 2. Has the existing heating oil tank had the fuel removed and has it been cleaned? If not, how much product is in the tank? The household heating oil tank is still in use and is currently on auto-fill. Once this contract is awarded the unit will be taken off auto-fill to somewhat deplete the tank. The compromised portion of the tank is in the secondary containment and has a temporary patch. The tank is in use; therefore, it has not been cleaned. 3. Can we perform an inspection of the existing heating oil tank? If so, who is the contact to do so? Note: We have USCG base security access credentials if required. Yes, tank inspection can be accomplished. Several days-notice would be needed. Our personnel will need to accompany bidders or contractors to the site on airport property. Contact the contracting officer to make arrangements. 4. Is the new AvGas tank to be filled with fuel as required for the heating oil tank option? No aviation gas purchase is required. We want the tank mostly empty because it will be slung by helicopter to a remote site. 5. Will the new tanks be located on federal land or are there any permits and/or fire marshal inspections required? Siphon valve available? The new tanks will not require permits/inspections as they will be placed on our administrative site. There is no siphon valve available; vendor shall provide if required. 6. Are concrete foundations required for the new tanks? Yes 7. Are the new tanks required to be anchored in their new locations? No 8. Has the existing 1,000 gallon AvGAS tank had the fuel removed and has it been cleaned? If not, how much product is in the tank? We have not removed any fuel nor had the tank cleaned. We don't know the contents of the AvGas tank. We believe it is empty or near empty, but we cannot check it without damaging the fittings and exposing the tank to additional water from precipitation. 9. Section 2.2.2 Appurtenances - RFP states to - Provide one (1) each anti siphon valve. Is line size and desired head pressure rating for anti-siphon valve available? We don't know for sure; probably an OPV 199ASV maybe - inch. 10. Section 2.2.2 Section 4 Ladder - Is a stair assembly acceptable in lieu of specified ladder? Tank diameter may be more or well suited for stair assembly? We usually have a ladder for space savings; however, a stair assembly is acceptable. Vendor shall provide either an integrated unit (stairs or ladder) that is attached to the tank and frame. 11. Section 2.2.2 Section Anti siphon Valve - Can desired head range be provided or lowest expected elevation of supply (suction) piping relative to grade where tank assembly will be installed? This is only a guess; I would guess that the elevation change is under 5 feet. The boiler would be above the tank pick up. Lines to the tank will be in place and relatively new as they are scheduled to be replaced this summer. 12. Section 3.2.3 Appurtenances Section D. Ladder - Is a stair assembly acceptable in lieu of specified ladder? Tank diameter may be more or well suited for stair assembly. We usually have a ladder for space savings; however, a stair assembly is acceptable. Vendor shall provide either an integrated unit (stairs or ladder) that is attached to the tank and frame. 13. Section 3.2.3 Appurtenances Section O. Fuel Equipment Cabinet - Can unit be field wired by a journeyman electrician as opposed to prewired? Yes. As long as the finished product is "turn-key" and complete when the contractor leaves. 14. Section 3.2.3 Appurtenances Section O. Fuel Equipment Cabinet - What is the phase and voltage of existing power? The contractor should see Section 2.2.3 L. N. "Generator power Connection" as well as the paragraph in Section 2.2.3 L. N. Section 2.2.3 L. N L. O. Section - Aviation Fuel Pump. This is all the information we have.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS