This Pre-Solicitation opportunity from Department Of Defense was posted on June 13, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Maintenance Dredging, 34-Foot Project, Key West Harbor, Florida

Awarded
W912EP-06-B-0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 13 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project involves maintenance dredging of the Main Ship Channel and Cut-A in Key West Harbor, Florida, to achieve a depth of 36 feet MLLW with a 1-foot allowable depth. The contractor will remove approximately 0.2 to 0.3 million cubic yards of silt, sand, and gravel, transporting the material to an ocean disposal area 13 miles south of Key West. Due to the high environmental sensitivity of the area, the contractor must adhere to strict regulations regarding turbidity, anchor placement, and access restrictions, while maintaining close coordination with environmental agencies. All vessels used must be Coast Guard certified. The contract is an unrestricted acquisition with a construction magnitude between 1 million and 5 million dollars, offering a price preference for certified HUBZone small business concerns. Bidders must choose from three alternate bid schedules based on funding and buffer requirements, with performance periods ranging from 55 to 65 days. Eligible bidders must be registered in the Central Contractor Registration and the Online Representations and Certifications Application. The solicitation is issued under NAICS code 237990 with a size standard of 18.5 million dollars.

General Info

Contract Value

$2,521,877.53

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

US Army Engineer District, Jacksonville P.O. Box 4970, Jacksonville FL 32232-0019, FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
This project work consists of dredging portions of Key West Harbor, including the Main Ship Channel and Cut-A (including Cut-A Widener). The required depth of dredging will be 36 feet MLLW with an allowable depth of 1 foot. The estimated total amou nt of material to be dredged is approximately 0.2 to 0.3 million cubic yards. The general types of material expected to be encountered are silt, sand and Gravel. All dredged material will be placed in the ocean disposal area located 13 miles south of Key West. The Contractor should expect that close coordination with environmental agencies will be required. In general, the contractor should expect that a high degree of environmental sensitivity will be required of him by the contract. The same level of sensitivity will be expected by the environmental community, which will be diligently watching the contractors operations, especially with regard to turbidity. In particular, the contractor should expect to work with restrictions such as areas of no acc ess, no anchor placement beyond the limits of the channel bottom, and special requirements regarding the use of anchor cables, swing cables, mooring lines, etc. The project is advertised with three alternate bid schedules in accordance with funding dollars . Alternate Bid A with a construction time of 55 days consist of a buffer of 20 feet, Alternate Bid B, with a construction time of 60 Days consists of a buffer of 10 feet, and Alternate Bid C, with a construction time of 65 days consists of a buffer of 3 feet. Performance period is based on awarded alternate bid. Coast Guard Certification of all vessels will be required. Magnitude of construction is between $1,000,000.00 and $5,000,000.00. Solicitation will be issued on or about 27 June 2006 and open on or about 27 July. THIS IS AN UNRESTRICTED ACQUISITION. There will be a price preference for certified HUBZone small business concerns that comply with the requirements in the solicitation as stipulated in FAR 19.1307. ALL RESPONSIBLE BIDDERS ARE ENCOUR AGED TO PARTICIPATE. Solicitation will be issued using the FeDTedS system. Interested bidders must register with FedTEDS. Registration instructions can be found on the FedTEDS website, https://www.fedteds.gov. A bidders mailing list will be maintained a t USACE Jacksonville at https://ebs1.saj.usace.army.mil/ebs/AdvertisedSolicitations.asp. All interested bidders must be registered electronically. If you are not registered, the Government is not responsible for providing you with notifications of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Please call +1 (555) 000-0000 for more information. Also, you must be registered in the Online Representations and Certifications Application (ORCA) in order to be eligible to receive an aw ard from any Government solicitation. For more information, visit the ORCA website at http://orca.bpn.gov/. The NAICS Code is 237990 and the size standard is $18.5 Million Dollars.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS