Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on January 21, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Maintenance Dredging, 44 & 46-Foot Project, Kings Bay Inner Channel, U.S. Navy Submarine Base, Kings Bay, Camden County, GA

Awarded
W912EP10B0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This project involves maintenance dredging of approximately 957,000 cubic yards of shoal material at the Kings Bay U.S. Navy Submarine Base Inner Channel. Dredged material will be placed in three upland Dredged Material Management Areas, and the scope includes water quality monitoring and bird monitoring from April 1 through August 31. The contract is structured with a base requirement for 700,000 cubic yards of dredging to depths of 44 and 46 feet, including 170 field cut weir riser boards, and four optional dredging tasks covering the Explosives Handling Wharves, Site Six Operating Area, Refit Wharves Areas, and the ARDM Yolk area. The estimated construction value is between 1 million and 5 million dollars. This procurement is a HUBZone small business set-aside under NAICS code 237990. To qualify as a small business for this contract, the firm must perform at least 40 percent of the dredging volume using its own equipment or equipment owned by another small dredging concern. Eligible contractors must be registered in the Central Contractor Registration and the Online Representations and Certifications Application.

General Info

Contract Value

$2,913,904.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The project work consists of maintenance dredging of shoal material at Kings Bay U.S. Navy Submarine Base Inner Channel. The total quantity of material to be dredged will be approximately 957,000 Cubic Yards (CY) with placement of dredged material in Disposal Area 1, Disposal Area 2 and Mainside Disposal Area, which are upland Dredged Material Management Areas (DMMA). The project work also includes bird monitoring between 1 April through 31 August and water quality monitoring. The contract will be broken up into a base and option items as follows: The Base consists of approximately 700,000 CY of dredged material from the Inner Channel to a 44-foot and 46-foot required depth with 2-foot allowable overdepth. Additionally, (170) field cut weir riser boards will be included in the Base. Option A work consists of maintenance dredging approximately 28,000 CY from the Explosives Handling Wharves to a 47-foot required depth with 2-foot allowable overdepth. Option B consists of maintenance dredging approximately 145,000 CY from Site Six Operating Area. Site Six Operating Area has a north area dredged to 39-foot required depth with 2-foot allowable overdepth and south area dredged to 44-foot required depth with 2-foot allowable overdepth. Option C consists of maintenance dredging approximately 78,000 CY from the Refit Wharves Areas to a 46-foot required depth with 2-foot allowable overdepth. Lastly, Option D consists of maintenance dredging approximately 6,000 CY from the ARDM Yolk area to a 44-foot required depth with 2-foot allowable overdepth. Magnitude of construction is between $1,000,000.00 and $5,000,000.00. THIS PROCUREMENT IS A HUBZONE SMALL BUSINESS SET-ASIDE. The solicitation will be issued on or about 17 November 2010 with bids due on or about 5 Jan 2010. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call +1 (555) 000-0000 for more information or visit the CCR website at http://www.ccr.gov. You also must be registered in Online Representations and Certifications Application (ORCA) in order to receive an award from this solicitation. The ORCA website is located at http://orca.bpn.gov. NAICS Code 237990, size standard $20 million. NOTE: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS