Z--PARK MODERNIZATION and EXPAND SEEPAGE COLLECTOR SYSTEM AT LAKE O THE PINES AND REPAIR DITCHES (CONCRETE LINER) AT JIM CHAPMAN LAKE/COOPER DAM, TEXAS

Awarded
W912BV-08-D-2017-18-19Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 19 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

This contract, funded by the Recovery Act and managed by the Department of Defense through the Endist Ft Worth office, focuses on infrastructure modernization and repair at Lake O the Pines and Jim Chapman Lake/Cooper Dam in Texas. The project was restricted to HUBZone Multiple Award Task Order Contract Pool Contractors, specifically Cerrudo Services, CKY, Inc., and Hallmark Capital Group, LLC. The scope of work includes comprehensive upgrades to four RV areas at Lake O the Pines, involving the replacement of electrical pedestals with 50-amp service, the installation of new concrete parking pads to accommodate modern RVs, and the repaving of roads with hot mix asphalt. Additionally, the contractor is responsible for removing outdated asphalt, plumbing fixtures, and trees, while installing new amenities such as fire rings and picnic tables. Beyond park modernization, the contract covers critical structural repairs and expansions. At Lake O the Pines, the contractor must demolish and replace approximately 200 linear feet of concrete liner for the seepage collector system at the base of Ferrells Bridge Dam. At Jim Chapman Lake/Cooper Dam, the project requires the grading, compaction, and installation of a 6-inch concrete liner for approximately 1,170 feet of raw earth ditch. Certain RV area renovations are designated as options to be completed based on the availability of funding.

General Info

Contract Value

$1,691,457.66

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

TX, USA

Set-Aside

NONE

Awardee

CKY INC.

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
ContactsNo contacts available
OfficeFORT WORTH, TX, 76102-6124, USA
Office AddressFORT WORTH, TX, 76102-6124, USA
ContactsNo contact information available

Full Description

Show more
This is a special notice to inform the public of the use of the Recovery Act funds. RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO HUBZone Multiple Award Task Order Contract (MATOC) Pool Contractors Cerrudo Services, CKY, Inc., and Hallmark Capital Group, LLC. The Contract Specialist for this action is Allen R. Bassett at +1 (555) 000-0000; or by e-mail at contact@example.gov The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to modernize parks and expand seepage collector system at Lake O the Pines and to repair ditches (concrete liner) at Jim Chapman Lake/Cooper Dam, Texas. At Lake O the Pines, modernization efforts will include replacing electrical pedestals at campsites with new 50-amp service, removal of 1960s-era asphalt camper parking pads with new concrete sites capable of accommodating modern-day recreational vehicles (RVs). This includes removal of picnic tables, fire rings, bumper blocks, electrical pedestals & exposed wire, exposed plumbing & plumbing fixtures and all trees within 10 of improved areas (roads, campsites, etc). All asphalt will be recycled. All existing campsites will be upgraded with new concrete parking pads capable of withstanding both the size and weight of modern RVs. All amenities (electrical pedestals, fire rings, lantern holders, picnic tables, bumper blocks and plumbing fixtures) will be installed. All roads in each area will be re-paved with hot mix asphalt. The (4) four RV Areas that will be renovated are Johnson Creek RV Area 4 (Base), Alley Creek RV Area 2 (Option), Brushy Creek Tent Area 2, (Option) and Buckhorn Creek RV Area 2 (Option). Option areas will be renovated as funding permits. Expanding seepage collector system at the base of Ferrells Bridge Dam at Lake O the Pines will entail demolition and removal of approximately 200 linear feet of existing concrete liner (approx 4,650 square feet). The ditch will be graded, compacted, and a new 6-inch concrete liner will be constructed. Repair of ditches at Cooper Dam will entail approx 1,170 feet of raw earth ditch that will be graded and compacted, after which a 6-inch concrete liner will be constructed inside the ditch.

More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
Power and Communication Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 339950
New
Federal
Piney Woods Region, Lake O the Pines Park Signs
Solicitation # W9126G27QA002
Solicitation W9126G27QA002 is a firm-fixed-price procurement for 187 custom aluminum signs to be used at the USACE Lake O the Pines project in Jefferson, Texas. This requirement is a 100 percent total small business set-aside. The signs will be installed across various project offices, boat ramps, and campgrounds to instruct and inform visitors. All deliverables must strictly adhere to the USACE Sign Program Manual, including Engineer Pamphlets EP 310-1-6a and EP 310-1-6b, as well as the Corps Graphic Standards Manual EP 310-1-6. Technical requirements specify the use of aluminum substrates, Standard Corps Helvetica fonts, and approved colors and retroreflective sheeting, such as Diamond Grade. The contractor is required to submit artwork, color samples, and graphic proofs for government approval prior to fabrication. Once approved, materials are expected to be delivered within 30 to 45 business days, with an estimated final delivery date of December 1, 2026. Shipping is FOB Destination, with all transportation costs borne by the contractor. Award will be based on the best value to the government, evaluating a technical submission on a go/no-go basis alongside price. Payment shall be processed electronically via Wide Area WorkFlow. Recent amendments have updated the product specifications and price schedule, clarified the small business set-aside status, and removed DFARS clause 252.226-7002.
Sign Manufacturing

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS