Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 2, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Rehab campground water system, Olympic NP, WA

Awarded
140P8322R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 12 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The National Park Service issued a firm-fixed-price solicitation for the rehabilitation of the public water and wastewater systems at Heart o' the Hills campground in Olympic National Park, located in Clallam County, Washington. This project is a 100 percent small business set-aside under NAICS code 237110, with an estimated value between 1 million and 5 million dollars. The primary scope of work involves comprehensive water system upgrades, including replacing the well pump and control system, demolishing and replacing the water treatment building, and installing a new chlorine solution storage and chemical feed system. Additional requirements include sandblasting and recoating the steel water storage tank, replacing distribution piping with high-density polyethylene pipe, installing backflow prevention, and utilizing horizontal directional drilling to install piping beneath Ennis Creek. The contract includes three optional components: the hydro-jetting and inspection of gravity sewer piping and manholes, the replacement of existing septic and pump tanks with a single 20,000 gallon combination tank along with electrical and pump control upgrades, and the fabrication and installation of eight security gates. Technical specifications mandate adherence to National Electrical Code standards and specific labor rates as defined by building and heavy construction wage determinations. Award value encompasses all base items and the three options exercised at the time of award.

General Info

Contract Value

$3,421,999.91

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

22

140P8322R0008 Amendment 0002

PDF, High priority: read this firstamendment
High

140P8322R0008 - Heart o' the Hills Campground Water System Rehabilitation

PDF, High priority: read this firstrfp
High

140P8322R0008 - Heart o' the Hills Campground Water System Rehabilitation

PDF, High priority: read this firstrfp
High

140P8322R0008 - Limitations on Subcontracting Compliance Worksheet

XLSX, High priority: read this firstspecifications
High

Attachment 9: Revised Electrical Specification Sections 0002

PDF, High priority: read this firstspecifications
High

Form 2 - Price Schedule

DOCX, High priority: read this firstspecifications
High

Form 3 - FAR Representations

DOCX, High priority: read this firstspecifications
High

Form 5 - Relevant Experience

DOCX, High priority: read this firstpast-performance
High

OLYM-215339: Rehabilitate Heart O' the Hills Water & Wastewater Systems Specifications

PDF, High priority: read this firstspecifications
High

PKG 215339 - Rehabilitate Heart o' the Hills Water and Wastewater System Drawings

PDF, High priority: read this firstspecifications
High

Solicitation 140P8322R0008 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation #140P8322R0008 Clarifications 14-18

PDF, High priority: read this firstq-and-a
High

Solicitation #140P8322R0008 - Site Visit Notes and Clarifications

PDF, High priority: read this firstq-and-a
High

WA20220022 - Revised Wage Determination, Building (Heart o' the Hills Campground)

PDF, High priority: read this firstwage-determination
High

WA20220022 Revised Wage Determination - Heart o' the Hills Campground

PDF, High priority: read this firstwage-determination
High

WA20220022 - Wage Determination, Building (Heart o' the Hills Campground)

PDF, High priority: read this firstwage-determination
High

WA20220044 Revised Wage Determination - Heavy Construction

PDF, High priority: read this firstwage-determination
High

WA20220044 Wage Determination - Heavy Construction

PDF, High priority: read this firstwage-determination
High

Attachment 6: Notice and Certification of Vaccination Form

PDF, Low priorityspecial-notice
Low

Form 6 - General References

DOCX, Low prioritypast-performance
Low

Heart of the Hills Well Log - Abandoned

PDF, Low priorityspecifications
Low

RFP 140P8322R0008 - FAQs for Heart o' the Hills Campground Water System

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 5, 2022 to Jul 11, 2022. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Pwr Olym MABO(83000)
Contacts1 person available
OfficePORT ANGELES, WA, 98362, USA
Office AddressPORT ANGELES, WA, 98362, USA

Full Description

Show more
Rehabilitate the public water system at Heart o' the Hills campground, Olympic National Park, near Port Angeles, Washington, in Clallam County. The work includes, but is not limited to, replacing the well pump and control system, replacing all electrical conduit and wiring for system power and control, demolishing and replacing the water treatment building, installing new chlorine solution storage and chemical feed system, sand blasting/cleaning and recoating interior and exterior of the steel water storage tank, replacing all tank fill and distribution piping with high-density polyethylene (HDPE) pipe and associated valves, installing backflow prevention, and conducting horizontal directional drilling to install pipe underneath Ennis Creek. There are two options related to the wastewater system, including hydro-jetting and inspecting all gravity sewer piping and manholes, replacing a 12,000 gallon septic tank and 5,000 gallon pump tank with a single 20,000 gallon combination septic/pump tank, replacing the electrical panel, and re-installing existing lift station pumps and pump control panel. A third option is to fabricate and install eight (8) security gates with removal/demolition of existing at some sites. Award value includes all base items and three options exercised at award.

More opportunities from Department Of The Interior → Pwr Olym MABO(83000)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS