Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Y--Rehabilitation of Water and Wastewater System

Active
140P2026B0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation 140P2026B0003 is a sealed bid invitation for bid issued by the National Park Service Denver Service Center for the rehabilitation of water and wastewater systems at the Curecanti National Recreation Area in Colorado. This total small business set-aside project focuses on replacing and upgrading critical infrastructure at Elk Creek and Lake Fork, including primary and secondary water distribution, wastewater collection, septic tanks, leach fields, and lift stations. The scope also encompasses electrical and mechanical upgrades, the installation of a supervisory control and data acquisition (SCADA) system for remote monitoring, and the creation of a potable water truck filling station. The estimated project value ranges from 5 million to 15 million dollars, with a performance period extending from July 20, 2026, to October 31, 2028. The contract will be awarded to the lowest responsible bidder based on a proposal consisting of five base line items and four optional line items. Key requirements include the submission of original bid bonds, the maintenance of comprehensive liability and workers compensation insurance, and the implementation of a written accident prevention plan compliant with OSHA standards. Technical specifications mandate adherence to various regulatory standards, including ADA compliance for entry ramps and specific cybersecurity protocols for facility equipment. Administrative requirements include electronic invoicing via the Treasury's Invoice Processing Platform and strict limitations on the substitution of key personnel during the first 120 days of performance. Bids must be submitted by 1400 local time on September 29, 2026.

General Info

Rehabilitate water/wastewater systems at Curecanti NRA with SCADA upgrades, market research for future procurement.

Agency

Department Of The Interior → Dsc Contracting Services DivisionView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CO

Set-Aside

SBA

Documents

(20)

140P2026B0003 Amendment 0001

PDF3 pagesamendment

140P2026B0003 Solicitation - Rehabilitation of Water & Wastewater System

PDF82 pagesifb

SFFMS-LKFK STA #1008 - Construction Drawings Part 7

PDFsow

Sources Sought Notice Survey Questionnaire Solicitation No. 140P2026B0003

DOCX2 pagessources-sought

Lake Fork Pumphouse RTU(LPH) Panel Layout & BOM

PDFsow

Sources Sought Notice for Rehabilitation of Water/Wastewater System - Solicitation 140P2026B0003

PDF2 pagessources-sought

CURE 318472 Final Construction Specifications

PDF429 pagesspecifications

104.136 ECW3 Cable Schedule and Panel Layout

PDFspecifications

CURECANTI NRA Water & Wastewater Improvements Drawing Index

PDFsow

B08 Attachment 2 - CURE Final Construction Drawings Part 3

PDFspecifications

B08 Attachment 2 - CURE Final Construction Drawings Part 5

PDFspecifications

C1 Water Plan & Profile, Construction Notes

PDFsow

Sources Sought Notice for Rehabilitation of Water/Wastewater System - Solicitation 140P2026B0003

DOCX2 pagessources-sought

140P2026B0003 - IFB: Rehabilitation of Water & Wastewater System

PDF2 pagesifb

Pre-Solicitation Notice 140P2026B0003 - Rehabilitation of Water and Wastewater System

PDF3 pagespresolicitation

Amendment 0001 – Solicitation 140P2026B0003

PDF6 pagesamendment

SC-6 Inlet Protection / EC-10 Drainage Swales drawings

PDFspecifications

A14 SSN Survey Questionnaire Attachment 1 RELEASED v2 July 2026

DOCX2 pagesother

616 187471 - Construction Drawings, Part 6

PDFspecifications

Geotechnical Report - CURE 318472 Elk Creek/Lake Fork

PDF90 pagessow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Posted

Sources Sought

Amendment 1

Contract was updated

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 2

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
View Agency Profile
Office AddressDenver, CO, 80225, USA
Contacts

Full Description

Show more
CURE 318742 - Rehabilitation of Water and Wastewater System - Curecanti National Recreation Area

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, covers a comprehensive series of infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical systems, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and surface repairs for 11 buildings. Additionally, the contract includes plumbing repairs for Multipurpose Building 3 and significant upgrades to the wastewater treatment plant infrastructure, specifically focusing on replacing worn valves, installing sewage grinders on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order to 8a MACC IDIQ offerors. Contractors are required to adhere to the TX20260236 wage determination for Cameron County and must comply with strict quality control, safety, and security requirements. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Key deadlines include a response deadline of September 10, 2026, with final proposals due by September 24, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, cathodic protection, electrical and instrumentation, and fencing. Associated site work includes pavement removal and restoration, traffic control, utility coordination, and the final disinfection, startup, and commissioning of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. The solicitation is open to various set-aside categories, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, and Disadvantaged Business Enterprises. Primary contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from subcontractors and suppliers for the South Marsham Street Green Infrastructure Project in Romney, West Virginia. This targeted green-street retrofit involves approximately 343.59 linear feet of roadway between Gravel Lane and US Route 50. The scope of work requires the installation of at least 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage work including inlets, pipes, and downspout tie-ins. Additionally, the project includes ADA-compliant curb, sidewalk, apron, and crossing improvements, as well as traffic-calming measures to integrate the BMP corridor. Landscaping requirements consist of six native trees and approximately 345 native plants or approved equivalents to treat 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization and restoration. The solicitation specifically encourages participation from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business concerns including HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details. The project falls under NAICS code 237110, and respondents must provide their company information and bidding status as part of the submission process.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins of 54 and 145.5 inches. Additional infrastructure requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The technical requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises, with specific support available for M/W/DBE subcontractors regarding bonding, insurance, and equipment procurement. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project falls under NAICS code 237110 and emphasizes the utilization of apprentices and quality control testing.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237310
New
Federal
Y--GOGA 319407 - Bridge Preservation
Solicitation # 140P2026R0053
Solicitation 140P2026R0053 is a small business set-aside invitation for bid issued by the National Park Service Denver Service Center for bridge preservation work within the Golden Gate National Recreation Area. The project involves the rehabilitation and preservation of 10 structures, including the Easkoot Creek Bridge, Rodeo Lagoon Bridge, Point Lobos Viaduct, and others. The scope of work encompasses concrete and guardrail repair, tree removal, stormwater management installation, timber replacement, sidewalk joint repair, and steel rail painting. The contract is structured as a Firm-Fixed-Price agreement with an estimated performance period of 200 calendar days. The government will award the contract using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and past performance—are significantly more important than price. Offerors must submit electronic proposals including a technical narrative limited to three pages and a detailed price schedule. Key requirements include the provision of bid, performance, and payment bonds, adherence to California prevailing wage laws, and compliance with Buy American and environmental recycled content standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS