Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from General Services Administration was posted on July 8, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remove and Install New Roof at U.S. Border Station, Port of Entry, Laurier WA

Awarded
GS-10P-09-XC-C-0046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project covers approximately 800 gross square feet and requires the design and installation of a framing system, a 60 mil EPDM single-ply roofing system with a 3% slope, and three LED strip light fixtures, including one emergency backup. All work must comply with OSHA 29 CFR Part 1926, the Architectural Barriers Act Accessibility Standard of 2007, and Job Corps sustainability guidelines. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be awarded based on overall best value. Interested bidders must conduct a physical site visit and submit a signed attendance roster to be considered. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout, and a bid bond equal to 20% of the base bid for any quote equal to or exceeding $25,000. Awarded contractors must provide performance and payment bonds for projects over $25,000, maintain specific insurance minimums, and adhere to California prevailing wage rates with weekly certified payroll reporting. Additionally, contracts valued at $40,000 or more are subject to FFATA reporting requirements.
Inland Empire Job Corps

POSTED

about 16 hours ago

DEADLINE

in 13 days
NAICS: 238160
New
SLED
26-11166 IFB Parapet Flashing Installation
Solicitation # 26-11166
Greene County, Missouri, is soliciting bids under solicitation number 26-11166 for the installation of new roof flashing on the parapet wall of the Historic Courthouse located at 940 N Boonville Ave., Springfield, MO. The scope of work includes the removal of existing metal flashing, seals, and damaged underlayment, followed by the inspection and repair of the roof deck and insulation. The contractor is required to install 3/4 inch exterior grade plywood fastened to the masonry cap, a 60mil TPO roof membrane, and weldable metal flashing using high-performance elastomeric or polyurethane adhesives to ensure a permanent watertight seal. The contract will be awarded to the lowest responsive responsible bidder, with evaluation factors including prior work experience and the proposed time of completion. Bidders must submit their proposals via the Greene County Electronic Bidding Portal by the specified deadline. Required submission documents include a manually signed title page, an Experience Statement demonstrating completion of comparable projects, an E-Verify Signature Page, and a Federal Tax ID. For contracts exceeding 5,000 dollars, a notarized affidavit is required. The successful contractor must provide performance and payment bonds at 110 percent of the contract value and comply with the Missouri Domestic Product Procurement Act, Clean Air and Clean Water Acts, and prevailing wage statutes if the project exceeds 75,000 dollars. Final acceptance of the work will be conducted at the destination by an authorized representative of the County.
Greene County

POSTED

about 18 hours ago

DEADLINE

in 23 days
NAICS: 238160
New
Federal
26Z1AY6_Replace Roofing_FCC Butner
Solicitation # 15B10627PR000102
The Federal Bureau of Prisons is conducting market research through a Sources Sought Notice for a firm-fixed-price construction contract to replace the roofing system at the Federal Correctional Complex (FCC) Butner in North Carolina. The project involves the complete removal and disposal of approximately 35,000 square feet of flat EPDM roofing and 27,000 square feet of pitched shingle roofing. The contractor will install a new 80-mil TPO flat roof system with tapered EPS insulation and a 30-year Class A asphalt shingle system on pitched areas, ensuring all penetrations, drains, and flashing are watertight and manufacturer-approved. The estimated project magnitude is between 1,000,000 and 5,000,000 dollars, with an estimated performance period of 637 calendar days. This opportunity is specifically seeking 8(a) contractors under NAICS code 238160, with a small business size standard of 19.0 million dollars in average annual receipts. The awarded prime contractor must provide all labor, materials, and equipment, maintain a 20-year non-prorated watertight warranty, and adhere to NRCA standards and FAR 28.102 for performance and payment bonds. Due to the secure nature of the facility, all personnel must undergo criminal background checks and security clearance investigations, which may take up to 35 days. Interested 8(a) firms must be registered in SAM and respond by adding their names to the Interested Vendors List and submitting a Market Research Questionnaire by October 26, 2026.
Fao

POSTED

about 20 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Contract GS-10P-09-XC-C-0046, awarded to CMEC, Incorporated on June 29, 2009, covers the removal and installation of a new roofing system at the U.S. Border Station Port of Entry in Laurier, Washington. The project involves removing existing concrete and asbestos roofing materials down to the base deck and installing a new system according to specific guidelines. The scope of work includes the installation of a gutter system and heat tape on the east and west sides of the main port building, the removal and replacement of the canopy roof, and the repointing of brick joints and installation of a new cement cap for the chimney. This firm-fixed-price agreement is valued at 86,676.00 dollars with a completion date of September 15, 2009. Because the project involves historical properties, all work must comply with the Secretary of the Interior's Standards for the Treatment of Historic Properties. Additionally, the contract mandates that all removal personnel be specifically trained in the handling and removal of asbestos containing materials to ensure safety and regulatory compliance during the operational hours of the port.

General Info

Contract Value

$88,176

NAICS

238160 - Roofing Contractors

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

Contract NC GS-10P-09-XC-P-0058 - CMEC, Incorporated

PDF, High priority: read this firstaward
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 10:00 PM UTC to 7:00 PM UTC on Jun 23, 2009. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R10
Contacts2 people available
OfficeSPOKANE, WA, 99201, USA
Office AddressSPOKANE, WA, 99201, USA
Contacts
Daniel S BrazellContracting Officer
Sandra A ThomasContract Specialist

Full Description

Show more
Removal of the existing roof surfaces to the roof deck (Base). Existing roofing materials were constructed of concrete and asbestos. Install a new roof system per the attached specifications. The installation of heat tape and gutter system on the east and west sides of the main port building. Canopy roof (Additive #2) - will be removed and replaced per the attached specifications. operational hours of the port. All removal personnel will be trained in the removal of asbestos containing materials. Chimney (Additive #1)- Repointing of existing brick joints, all sides and provide new cement cap replicating existing conditions. This award was an IFB which included a Bid Bond and acceptance of amendment #0001 (Historical Properties Language) in accordance with Secretary of Interior's Standards for the Treatment of Historic Properties.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS