Z -- Sawmill River-Montague, MA

Active
AG-1320-S-06-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves stabilizing an eroding section of the Sawmill River streambank in Montague, Massachusetts, to protect Greenfield Road. The work includes installing approximately 150 linear feet of rock riprap with specific rock sizes (D50 of 18 inches, maximum 36 inches) along the slope toe, constructing stream barbs within the river channel, and controlling river flow during construction. Additional tasks include earth filling, slope shaping, placing erosion control matting, and vegetation planting and seeding to restore the area. The entire project is scheduled to be completed within a 58-day performance period. The solicitation was posted on May 31, 2006, with the full solicitation package, including drawings and specifications, expected around mid-June 2006. A pre-bid conference and site visit were set for June 22, 2006, held at the Montague Center Library. The contract is categorized under NAICS code 237990, relating to heavy and civil engineering construction, with a small business size standard of $31 million. Wage rates under the Davis-Bacon Act apply, and inquiries are directed to the designated contracting officer, Lisa A Virgilio.

General Info

Stabilize Sawmill River eroding bank with rock riprap, stream barbs, erosion control; complete in 58 days.

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Montague, MA 01351

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Lisa A VirgilioContracting Officer

Full Description

Show more
Riverbank Stabilization'Sawmill River, Montague, MA. The proposed work is to stabilize an eroding streambank of the Sawmill River and to protect Greenfield Road by installing approximately 150 linear feet of rock riprap (D50 of 18 inches and maximum size of 36 inches) The major items of work include: installing the rock riprap along the toe of the slope, installing stream barbs in the river channel, control of flows in the river during construction, earth fill, slope shaping, placing erosion mat, and planting and seeding. The period of performance is 58 days. The solicitation package, to include drawings and specifications, will be posted to www.fedbizopps.gov on or around June 15, 2006. Interested parties are invited to attend a pre-bid conference and site showing on June 22, 2006 at 11:00 am. The meeting place for the site visit will be the Montague Center Library on Central Street. The NAIC code for this work is 237990 and the small business size standard is $31 million. This work is subject to Davis Bacon wage rates.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS