Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Z--Wheel Ridge 82-116 Bond Forfeiture, Scott County, Tennessee.

Active
S07PS00096Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves a project located in the Chimney Mountain area of Scott County, Tennessee, focusing on environmental restoration and infrastructure improvements at a previously reclaimed mine site. The scope of work includes mobilization and demobilization of the contractor’s workforce, equipment, and materials; site preparation such as clearing, grubbing, and erosion and sediment control; regrading damaged terrain; construction of diversion ditches and low water crossings; roadway grading and stone application; and revegetation of disturbed areas, including a tree planting program. The contract specifies a performance period of 60 days and includes a maximum bond forfeiture amount of $41,606. Bids for the project were anticipated to be released around May 2, 2007, and the solicitation was issued by the Department of the Interior from its Headquarters Office in Washington, DC. The project aims to restore environmental stability and improve access in the affected area through erosion control, grading, and revegetation efforts, ensuring lasting rehabilitation of the former mining site.

General Info

Environmental restoration and infrastructure improvements at Chimney Mountain mine site, 60-day performance period.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

DC

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Headquarters Office
ContactsNo contacts available
OfficeWASHINGTON, DC, 20240, USA
Office AddressWASHINGTON, DC, 20240, USA
ContactsNo contact information available

Full Description

Show more
The project site is located in the Chimney Mountain area of Scott County, Tennessee. The work consists of the mobilization and demobilization of the contractors workforce, equipment and material; Site preparation, including clearing and grubbing and erosion and sediment control; the regrading of damaged areas at a previously reclamed mine site; Diversion ditch and low water crossing construction; Roadway grading and stone application; and, the revegetation of all disturbed areas, including a tree planting program. Bids are anticipated to be released on or about May 2, 2007. Period of performance is 60 days. Maximum bond forfeiture money in the amount of $41,606.00 is available for this project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS