Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on January 28, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1AZ--EHRM Training and Admin Space Support - Phase 2 - Hines, IL 578-21-706 (VA-21-00021817)

Closed
36C77621R0055Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

General Info

NAICS

541330 - Engineering Services

Place of Performance

Hines VA Medical Center Hines, IL, OH

Set-Aside

NONE

Documents

32

36C77621R0055 Presolicitation Notice for EHRM Training and Admin Space

DOCX, High priority: read this first7 pages · presolicitation
High

578-21-706 EHRM Training and Admin Space Support SOW

DOCX, High priority: read this first14 pages · sow
High

A/E Design Checklist

PDF, High priority: read this first69 pages · sow
High

HEFP SEP Space Planning Job Aid

PDF, High priority: read this first24 pages · sow
High

Hines Form 1532 - Dig Permit SOP

PDF, High priority: read this first4 pages · sow
High

Hines Underground Utility Plan

PDF, High priority: read this first1 page · specifications
High

Infection Control Risk Assessment (ICRA) for Construction/Renovation Projects

DOCX, High priority: read this first1 page · sow
High

OEHRM Site Infrastructure and EUD Requirements v1.8

PDF, High priority: read this first47 pages · sow
High

OIT Horizontal Cable Requirements – Edward Hines Jr. Hospital

PDF, High priority: read this first8 pages · sow
High

PCRA Project No. 578 - Pre-Construction/Safety Risk Assessment

DOCX, High priority: read this first4 pages · sow
High

S02 Attachment 6 - EHRM Design Schedule

DOCX, High priority: read this first7 pages · specifications
High

VA OIT Design Guide Templates - Critical Telecommunications Spaces

PDF, High priority: read this first32 pages · sow
High

VA Policy Memorandum 578-03-001-089 (R-2) Hot Work

PDF, High priority: read this first7 pages · policy-memorandum
High

VA Policy Memorandum 578-12-138A-079: Above Ceiling Entry and Wall Construction Permits

PDF, High priority: read this first14 pages · policy-memorandum
High

VA Request for Personal Identity Verification Card (OMB 2900-0673)

PDF, High priority: read this first6 pages · form
High

578-12-138A-076 (R-2) Safety and Health During Construction Activities

PDF, Low priority49 pages · policy memorandum
Low

Attachment 15 - Combined Drawing Set

PDF, Low priority4 pages · other
Low

Attachment 5 - Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

Contractor Parking

PDF, Low priority1 page · other
Low

Hines COVID-19 Guidelines

PDF, Low priority2 pages · special-notice
Low

OEHRM Infrastructure Readiness Playbook v2.0

PDF, Low priority54 pages · other
Low

Physical Security Survey - Hines Data Closet Security

PDF, Low priority2 pages · memorandum
Low

Policy Memorandum 578-02-001-088(R-3) Interim Life Safety Measures

DOCX, Low priority14 pages · other
Low

SOCAMES 6 Design Alert 1

PDF, Low priority2 pages · other
Low

Standards Alert 003C2B-SA-017: OIT Infrastructure Standards for Telecommunications Spaces

PDF, Low priority31 pages · special-notice
Low

VA Hines Hospital No Smoking Policy

PDF, Low priority1 page · other
Low

VA Memo Nov 7 2018 - Sensitive Infrastructure Data Classification

PDF, Low priority2 pages · memorandum
Low

VHA Directive 7712 - Fire Protection Code Reviews

PDF, Low priority7 pages · directive
Low

S02+-+Attachment+18+-+OIT-InfrastrucStdsTelecommSpaces+v3.0.pdf

PDF187 pages

S02+-+Attachment+21+-+OIT+Design+Guide.pdf

PDF

S02+-+Attachment+4+-+EHRM+Readiness+Infrastructure+Self-Assessment+Hines.xlsx

XLSX

S02+-+Attachment+7+-+Hines+VA+Campus+Site+Plan.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac National Energy Business Center (36E776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Samantha Mihaila

Full Description

Show more
PRESOLICITATION NOTICE THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD FORM (SF) 330'S ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. A. GENERAL INFORMATION: Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, reports, commissioning, construction period services for the Hines EHRM Training and Administration Phase II 578-21-706 at the Hines, IL VAMC. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 Architectural and Engineering Services and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. B. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 Engineering Services and the annual small business size standard is $16.5 Million. This project requires a full design team to complete this project. The projected award date for the anticipated A-E contract is on or before May 2021. The anticipated period of performance for completion of design is 120 calendar days after notice of award. The VAAR Magnitude of Construction is $5,000,000.00 to $10,000,000.00. C. A-E SELECTION PROCESS: Firms submitting SF-330 s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for initial selection evaluation. The selection will be made using a two-phase process. Phase I consists of the initial evaluation of the SF-330 s and determination of the highest rated firms. At least three (3) of the highest rated firms in accordance with FAR procedures will then be short listed and invited to continue with Phase II of the process. All firms not short listed will be notified at this time. Phase II consists of discussions for the short-listed firms and selection of the top ranked firm to receive the solicitation and conduct negotiations. The firms selected for discussions will be notified by email of selection and provided further instructions. After the discussions are concluded, the top-ranked firm will be selected, sent the solicitation, and subsequent negotiations to follow. A site visit will be authorized for the highest rated firm during the negotiation process. If negotiations are not successful with the highest rated firm, they will continue with the next highest rated firm, and so on until award can be made. D. SELECTION CRITERIA: Phase I: Firms responding to this notice will be evaluated and ranked using the selection criteria listed below. The factors are listed in descending order of importance. The technical evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Specialized Experience: Experience and technical competence in the design of network infrastructure installation, renovations, and/or upgrades to information technology (IT) systems (either as solely IT projects or incorporated into new space/renovation projects). Work shall include networking back bone fiber, structured cabling, electrical distribution upgrades, uninterruptable power systems (UPS), electrical bonding, building management systems/building automation systems (BMS/BAS), HVAC, telecommunication room renovations/expansions/relocations, electronic and physical security upgrades, and all such systems and components as may be necessary to achieve project goals. Other specialized experience includes experience in critical path scheduling, fire protection, construction infection control protocols, energy conservation and sustainable design practices. Include Government and private experience on project similar in size, scope and complexity. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects and familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. Offeror shall provide a Summary Page of its recent and relevant specialized experience and technical competence which is similar in size, scope and magnitude to this requirement. Relevant is defined as those task requirements identified in the RFQ s Scope of Work. Recent is define as services provided within the past 5 (five) years. Offeror shall provide a minimum of 2 (two) projects but no more than 4 (four). Each project shall include the following; Project title, location and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e. prime contract, Teaming Partner or subcontractor Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates Total dollar value of the project. The information provided in section F and G of the SF 330 will be used to evaluate this evaluation factor. Professional Qualifications: Professional qualifications necessary for satisfactory performance of required service. The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered or certified by a US state, the District of Columbia or a US territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. At a minimum, the offeror shall describe the professional qualifications and not less than five (5) years of experience in the required disciplines. Disciplines required for this project include, but are not limited to: Architecture, Mechanical, Electrical, Plumbing, Structural, Civil, Fire Protection, Hazardous Material Abatement/Industrial Hygiene, Physical Security (note must hold the Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification issued by ASIS International), Cost Estimation, and Project Management. The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority]______________________, [company] __________________ certify that the team proposed to perform under this requirements demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. Information provided in sections C through E of the SF 330 will be used to evaluate this factor Capacity: Capacity to accomplish work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key discipline. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies towards the team/personnel provided in the SF 330. Past Performance: Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, management communication and compliance with performance schedules. Include CPARs data for the projects referenced in section F of the SF330. If CPARS data is not available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. CPARs data and PPQs will not be included in the page count. All projects provided in the SF 330 must be completed by the office/branch/individual team member actually performing the work under this contract. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. The information for this factor shall be provided in Section H of the SF 330. Locality: Knowledge of the locality, to include specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods or local laws and regulations. The information for this factor shall be provided in Section H of the SF 330. Construction Period Services: Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. The information for this factor shall be provided in section H of the SF 330. Secondary Selection Criterion*: Geographic location: Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and the Hines VA Medical Center Determination of the mileage will be based on Google Maps http://www.google.com/maps/dir/). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary se-lection criterion will not be applied when determining a firm s SF 330 submission. Phase II (FOR INFORMATIONAL PURPOSES AT THIS TIME, DO NOT SUMBIT WITH PHASE I SUMBISSION): In accordance with FAR 36.602-3(c), discussions will be conducted. The highest-ranking firms will be short listed, and discussions will commence. The format and discussion topics will be provided at the time short listed firms are notified. E. PHASE I SUBMISSION CRITERIA/REQUIREMENTS: The below information contains the instructions and format for that shall be followed for the submission of the SF-330 Statement of Qualifications: Submit ONE (1) SF-330 Statement of Qualifications via email to the Contract Specialist Samantha Mihaila at contact@example.gov. This shall include SF-330 and any applicable attachments. All Responses are due on or before March 1, 2021 at 9 AM Eastern Standard Time. The SF-330 shall be submitted in one email and have a file size shall be no larger than 5 MB. No hard copies will be accepted. The subject line of the email shall read: SF-330 Submission; 36C77621R0055 Hines EHRM Training and Administration Phase II 578-21-706 The submission must include the SF-330, Architect/Engineer Qualifications (form is available on-line at http://www.cfm.va.gov/contract/ae.asp). The page limitation of the SF-330 shall not exceed a total of 35 pages. This includes title page, table of contents, and any other relevant information. Each page shall be in in Arial size 12 font, single spaced. Part II of the SF-330 Form will not count as part of the page limitations. CPARs data and Past Performance Questionnaires will not count as part of the page limitation. All SF-330 submissions must include the following information either on the SF 330 or by accompanying document: 1) Cage Code; 2) Dun & Bradstreet Number; 3) Tax ID Number; 4) The E-mail address and Phone number of the Primary Point of Contact; 5) A copy of the firms Vet Biz Registry. NOTE: This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as verified by the VA s Center for Veterans Enterprises (CVE) (http://www.vetbiz.gov). Offerors must be verified by CVE and visible in the Vendor Information Portal (VIP) database at TIME OF SUBMISSION OF OFFERS. Failure to be BOTH visible and verified at time of SF330 Submission, Interview Presentations, and award will result in the offeror being deemed unacceptable and ineligible for award. All Joint Ventures must be CVE verified at time of submission and award and submit agreements that comply with 13CFR 125.15 prior to contract award. SF-330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF-330 submission package. It is the offeror s responsibility to check the Contract Opportunities website at: www.beta.sam.gov for any revisions to this announcement prior to submission of SF-330s.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS