This Government Contract opportunity from Department Of Veterans Affairs was posted on May 21, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--NRM-CONST 528A6-19-605 REPLACE BUILDING 76 ROOFS

Awarded
36C24224B0028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Contract 36C24224C0066, awarded on May 21, 2024, to Serviam Construction LLC for $3,421,219.00, covers the replacement of roofs for Building 76 at the Bath VA Medical Center. This SDVOSB set-aside project involves the installation of an EcoStar Sustainable Roofing System, requiring a certified applicator to provide a Gold Star 50-Year Limited Labor and Material Warranty. Key technical specifications include the use of copper for flashing and gutter liners, the installation of an ice and water shield membrane directly to the roof decking, and the integration of a new snow melt system into the existing VA Building Management System. The scope specifically excludes the installation of snow guards. The project includes significant environmental and structural requirements, such as the abatement of asbestos-containing asphalt adhesive across the main and annex roof fields and the treatment of any encountered paint as lead-based. The contractor is responsible for painting the dormers, performing minor masonry repointing above the roof line, and implementing a written Respiratory Protection Plan. While the VA provides visual and air clearance testing for asbestos, the contractor must manage scaffolding in compliance with safety standards and SHPO restrictions. Additionally, the contractor is required to use the VA-provided Auto Desk Cloud for construction tracking and coordination.

General Info

Contract Value

$3,595,021

NAICS

238160 - Roofing Contractors

Place of Performance

NY, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award 36C24224C0066 - Replace Building 76 Roofs

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Apr 30, 2024 to May 1, 2024. The notice description changed.

Notice updated

Response deadline changed from May 1, 2024 to May 8, 2024. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Contacts1 person available
OfficeALBANY, NY, 12208, USA
Office AddressALBANY, NY, 12208, USA
Contacts
Devan BertchContracting Officer

Full Description

Show more
Page 1 of 3 500 CANAL VIEW BOULEVARD SUITE 500 ROCHESTER, NY 14623 +1 (555) 000-0000 RFI RESPONSE COMPANY: Bath VA Medical Center PROJECT: PROJECT NUMBER: Replace Roof Building 76 528A6-19-605 RE: RFI responses RFI No 1 Spec 07 31 26-4 Metal Flashing calls for copper 20 oz in the valleys and 16 oz in other locations. Prints call for stainless steel. Provide copper flashing as specified. Spec 07 31 26-4 Snow guards. Who is the manufacturer and what style in copper? Snow guards were not specified for this project. Instead of using felt paper can we install ice and water on the deck instead of felt? It would be more watertight in the end. Yes. Provide ice and water shield membrane directly to roof decking and as detailed on AS-100. RFI No 2 Section 04 01 00 Maintenance of Masonry describes work involving Repointing existing damaged masonry joints and Replacing existing damaged masonry units. It isn t shown anywhere else in the drawings or specifications the actual scope of this required work. Can you provide clarification to the locations and scope of masonry work required for this project? There are small areas of damaged brick above the roof line at the ends of the ridge. Under section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement is a full decontamination unit with shower required for this minimal interior abatement? Contractor to develop and implement a written Respiratory Protection Plan in compliance with OSHA requirements. Under section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement is there any requirement for floor prep or flooring repair after the abatement process? Floor to be left cleaned and ready for new flooring install. Repair any damage created after the abatement process. Is the VPIH responsible for all flooring and roofing Asbestos abatement visual and air clearance testing or is the contractor responsible for hiring a 3rd party Industrial hygienist for this? VA to provide. Section 02 82 33.13 mentions lead based paint removal but the drawings and specifications don t offer any clarification on this. Is the contractor responsible for any lead testing or lead paint removal for this project or only the removal of lead lined copper flashing? Lead testing is not required but any paint encountered to be treated as lead paint removal. Would it be possible to have the scaffolding contractor arrive on site and start setting up scaffolding before full contractor mobilization to ensure work can begin and progress uninhibited after full contractor mobilization? Scaffolding is part of contractor mobilization. The dormers are mentioned in both the specs and the drawings as possible-lead containing paint, but there seems to be no mention of restoring the dormers themselves other than the re-shingling. The dormers are not to be restored on this contract? Dormers to be painted. We saw this was asked in the previous RFI but we would request the VA to reconsider allowing weekend work of an exterior project of this magnitude and complexity. Allowing the contractor to work when the weather is favorable increases the likelihood this project will get finished in 2024. Is there any roof for consideration of this request? VA will allow weekend work but must be arranged with the COR/ facility. Will the VA require the roofing contractor/ installer to be approved certified EcoStar applicator to install the EcoStar Sustainable Roofing System and offer the Gold Star 50-Year Limited Labor and Material Warranty? Yes. On Page 3 of the drawings for the roofing abatement, all of the Annex shingles contain ACM while on the main building, the ACM is on the ridges, valleys, and flashing but not the entire field tiles, correct? Black asbestos-containing asphalt adhesive is present throughout the entirety of the main roof and annex building roof fields. Will the new snow melt system need to be integrated into the existing VA BMS? Va to answer. Yes According to the drawings, we are removing the existing gutter liner. What type of material is the new gutter liner? Copper. 2.6 SNOW GUARDS A. Snow Guards: Individual copper snow guards. Is there a desired pattern the VA wants for this and can provide a spec? No snow guards specified. Would the VA extend the due date two weeks? VA has extended bid to May 8th, 2024. RFI No 3 Scaffolding: It is assumed that scaffolding is safety measure required beneath the roof drip edge of each section being worked on. Please confirm. Yes this is correct. There will be additional requirements if contractors wish to move from scaffolding to roof. Scaffolding will need to be erected on top of the flat roof portions of the building up to the roof edge on the north and south side of the main entrance. Are there any load bearing restrictions that need to be identified? The flat roof is EPDM. The contractor s intent is to lay down a protective barrier (i.e. ¾ plywood) on the roof surface and erect scaffolding on top on the protective barrier. Is this acceptable? There are load bearing restrictions. Any damage to be prevented and repaired Is the contractor allowed to use concrete anchors into brick-and-mortar exterior to secure scaffolding to building? Upon completion all exterior surfaces to be like before. SHPO restrictions apply. Is the contractor allowed to employ the use of a Hydro Scaffolding type system? This system provides proper safety protection and provides labor crews a more efficient way to transfer tools, equipment, materials, and debris between the ground and the roof. Scaffolding methods are per contractor. Ensure systems meet safety requirements and of commercial quality and availability. Snow Guards: Are snow guards getting installed? There are no specifics on this unless I missed it. No snow guards. The use of Stainless steel: Plans call for use of stainless steel to be installed for cricket flashing as directed in drawing number AS-100. The cricket flashing will come in to contact with existing copper counter flashing. The two metals when in contact create a chemical reaction. Can we use copper in place of stainless steel for cricket flashing? Drawing specify the use of stainless steel. Use Copper flashing as specified. Auto Desk Cloud: A requirement for Auto Desk Cloud was mentioned at the site visit. What exactly is an Auto Desk Cloud and is there alternatives that can satisfy this requirement? Same type of product as Newforma, Procor, and other construction tracking databases. As it is paid for by VA, training is available through VA, it is to be used and no alternatives. RFI No 4 Please confirm that snow pads are required over the entire roof area in a pattern recommended by the snow pad manufacturer. ? No snow guards on project.

More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)

Same awarding agency

NAICS: 236220
New
Federal
Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC
Solicitation # 36C24227B0004
The Department of Veterans Affairs, Network Contracting Office 2, is issuing a presolicitation notice for solicitation 36C24227B0004 to replace flooring in Building 76, Rooms 140 and 140A at the Bath VA Medical Center in Bath, New York. The scope of work includes the removal and replacement of existing flooring and electrical modifications to support X-ray equipment, such as extending power conduits and cables, installing new power switches, and providing structural support. The contractor is responsible for providing all supervision, labor, tools, equipment, and materials. Due to the facility being a fully functional medical center, work hours may be restricted, and off-hours work may be required to maintain uninterrupted operations. All work must be completed within 60 days of receiving the Notice to Proceed. This procurement is a 100 percent set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS Code 236220, Commercial and Institutional Building Construction, which has a size standard of 45 million dollars. The estimated magnitude of the project is between 25,000 and 100,000 dollars. The solicitation is expected to be posted on SAM.gov on or about October 28, 2026, with an anticipated award date in November 2026. This will be an Invitation for Bid (IFB) requiring bid bonding, and all bids must be submitted electronically. Inquiries should be directed to the Contracting Officer, Idalia Algarin.
Commercial and Institutional Building Construction

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details
NAICS: 541350
New
Federal
H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Solicitation # 36C24227Q0041
The Department of Veterans Affairs is soliciting quotes for a Qualification of Elevator Inspectors (QEI)-Certified Inspector to serve as a third-party witness for annual and semi-annual safety inspections and testing at the Canandaigua and Bath VA Medical Centers in New York. This service-disabled veteran-owned small business set-aside under NAICS 541350 consists of a 12-month base period starting November 1, 2026, with four additional 12-month option years. The certified inspector is responsible for independent witnessing and reporting using VA Form 10-6167, while a separate maintenance contractor provides the labor and equipment to perform the physical tests. All work must comply with the most current ASME A17.1 and ANSI/ASME 17.2 codes. The scope of work includes semi-annual inspections, annual hydraulic pressure tests, and annual traction no-load tests during the base and final option years, with five-year traction full-load tests scheduled for Bath VAMC in option year one and Canandaigua VAMC in option year two. Services are typically performed in April and October. Award will be based on an evaluation of technical capability, past performance, and total price. Offerors must submit a technical capability statement of no more than 10 pages and adhere to New York State licensing and Service Contract Act wage determinations.
Building Inspection Services

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 334516
New
Federal
6550--Sources Sought: Tuberculosis Testing Reagents and Consumables for the Buffalo VA Medical Center. In support of the Tuberculosis (TB) Testing Program
Solicitation # 36C24227Q0095
The Department of Veterans Affairs, VISN 02 Network Contracting Office, has issued a Sources Sought Notice under solicitation number 36C24227Q0095 to identify qualified sources for tuberculosis testing reagents and consumables for the Buffalo VA Medical Center. This request is for information and planning purposes only and does not constitute a formal solicitation. The government is seeking a domestic source capable of providing FDA-cleared reagents, test kits, controls, and processing materials that are compatible with the T-SPOT TB testing platform and methodology. All items must be delivered in original manufacturer packaging with sufficient shelf life and meet all manufacturer specifications for accuracy and performance within an accredited clinical laboratory environment. Interested respondents must submit their capabilities via email to the contracting officer by November 12, 2026. Submissions must include the company's Sam.gov Unique Entity ID, business size status relative to NAICS code 334516, and details regarding whether they are a manufacturer or distributor. The government is specifically looking for information on business representations such as SDVOSB, VOSB, Hubzone, and WOSB status, as well as any existing federal contracts through GSA, NAC, or NASA SEWP. While general pricing is encouraged for market research, it will not be used for award evaluation. Responses must demonstrate clear evidence that any equivalent products meet all salient characteristics and specify if the items are manufactured within the United States.
Analytical Laboratory Instrument Manufacturing

POSTED

about 8 hours ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS