Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades

Closed
36C25226B0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 12 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract pertains to the upgrade of electrical infrastructure at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois, with work focused on replacing seven medium voltage oil-filled transformers serving seven campus buildings—1, 3, 9, 11, 66, 137, and 187—along with associated electrical switchboards, concrete pads, and safety bollards. The transformers include four 150 KVA units, two 300 KVA units, and one 750 KVA unit, with one 150 KVA transformer requiring relocation and a new concrete pad at its new site. The contract also mandates the replacement of switchboards at buildings 3 and 137 and the installation of anti-ram bollards at every transformer location. All work must be performed in compliance with project specifications, drawings, and the full Project Manual, ensuring the electrical systems are fully operational, code-compliant, and safe for maintenance operations. The project is structured as a fixed-price construction effort with a total performance period of 357 calendar days, beginning with the Notice to Proceed, and is dependent on precise scheduling tied to the delivery of long-lead items, especially the transformers, which dictates the baseline timeline and must be submitted by the contractor for VA approval. The solicitation is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238210, requiring all offerors to be certified in the SBA’s database and meet the $19 million size standard. Bidders must comply with a strict no-contact policy regarding the Architect/Engineer and VA facility personnel; all questions must be submitted through formal Requests for Information (RFI) to ensure uniformity and fairness. The contractor is responsible for developing and executing comprehensive quality assurance and safety plans to prevent rework and delays, and must adhere to a rigid milestone schedule with key checkpoints including submittal reviews, procurement deadlines, mobilization, construction phases, and closeout. The contract value is estimated between $2 million and $5 million, with payment and invoicing directed to the VA’s Milwaukee office, though specific CLINs or payment terms are not detailed. All work will be performed on-site at the North Chicago location, with final acceptance resting with the VA, and no options or extensions are provided. The absence of formal FAR clauses, pricing schedules, or packaging specifications indicates that these details are embedded in

General Info

SDVOSB contract to replace transformers at VA center in Illinois, worth $2–5M, 357-day performance period.

Agency

Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

WI

Set-Aside

NONE

Documents

(5)

S02- Att 2 100CD Dwgs 10APR25 - Construction Documents for Enclosure Upgrade

PDFconstruction-documents

Solicitation 36C25226B0029 - Oil Transformer and Switch Enclosure Upgrades Construction

DOCXifb

VA Oil Transformer and Switch Enclosure Upgrade Specs with Addendum 20OCT25

PDFspecifications

Solicitation 36C25226B0029 Oil Transformer and Switch Enclosure Upgrades

DOCXifb

Wage Determination IL20260008 Mod 2 20260518

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Organization / Agency
Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
View Agency Profile
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
Lynn H VanderVeldeContractor

Full Description

Show more
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 517111
New
Federal
FHCC Satellite TV Installation and Programming
Solicitation # 36C25226Q0706
The Department of Veterans Affairs Great Lakes Acquisition Center is soliciting quotes for the installation and annual programming of a DirecTV COM3000 Advanced Entertainment Platform system at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves upgrading television services in Building 133 to provide high-quality linear satellite and broadband over-the-top content for patients, staff, and visitors. Key technical requirements include the installation of 100 Pro:Idiom converter boxes and a system capacity of 92 channels, consisting of 86 cable channels and 6 in-house channels. The programming package must include DTV Locals, a Regional Sports Package, and a VIP Service Plan, supporting a total of 263 units. The contract structure consists of a base year running from September 15, 2026, to August 31, 2027, with four optional one-year extensions through August 31, 2031. Installation must be completed within 60 calendar days of the award. This is a HUBZONE Small set-aside procurement, and the government will evaluate quotes based on technical capability and the best benefit to the government, with preference given to SDVOSB/VOSB entities. All work must comply with OSHA, NFPA, and VA safety and infection control standards. Payments are processed monthly in arrears via electronic funds transfer through the Tungsten Network e-Invoicing system.
Wired Telecommunications Carriers

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 238290
New
Federal
Z1DA--Construction of Ogden Elevator Cab Interiors Jesse Brown Medical Center
Solicitation # 36C25226B0033_1
Solicitation 36C25226B0033 is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to perform interior upgrades for four elevators—P-7B, P-8B, P-9B, and freight S-10B—located in Building 11B of the Ogden Pavilion at the Jesse Brown VA Medical Center in Chicago, Illinois. The project objective is to match the design of elevator cab P-6B, which features ViviGraphix Graphica Cairo Slate Blue panels, diamond finish stainless steel ceilings with 3,200K LED downlights, and Nurazzo tile flooring. The scope includes the potential raising of elevator sills and doors to ensure flush tile installation. The project magnitude is estimated between $250,000 and $500,000, with a total performance period of 154 calendar days from the notice to proceed. Award will be granted to the responsible bidder providing the lowest priced responsive bid. Bidders must provide a bid guarantee of at least 20 percent of the bid price and submit current Experience Modification Rate (EMR) data and OSHA 300/300a forms. The contractor is required to adhere to the Davis-Bacon Act wage determinations for Cook County and maintain compliance with ASME A17.1 safety codes for elevators and escalators. Strict infection control measures are required per the ICRA renewal permit, and all construction debris must be removed daily. Key administrative requirements include the submission of daily contractor production reports (VA Form 10101) and the provision of performance and payment bonds upon award.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS