Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Veterans Affairs was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--623-24-101 | VAMC Muskogee Replace Exterior Utility Lines

Awarded
36C25925R0112Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes of 18 and 24 inches. Specialized requirements include trenchless crossings for 24-inch DIP sewers with associated launch and receiving shafts, the installation of standard and doghouse manholes up to 84 inches in diameter, and a CSO regulator fit out. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, and fine grading. Key project deliverables and requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Additionally, the project requires specific railroad insurance. All work must adhere to the provided technical drawings and project sheets.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system in accordance with the provided bid documents. Key deliverables include AC paving, pipe and fitting installation, traffic loops, and demolition, alongside specialized services such as jack and bore, cold planing, potholing, welding, and SWPPP compliance. This solicitation specifically targets certified HUBZone Small Business and Disadvantaged Business Enterprise partners, including DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The response deadline for this solicitation is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract is for the replacement of exterior utility lines at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma, under Solicitation Number 36C25925R0112, awarded as a full construction services project with an estimated range of $2,000,000 to $5,000,000. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), and offerors must comply with strict subcontracting limitations under VAAR 852.219-75, including certification of compliance with statutory thresholds. Performance is scheduled to begin upon Notice to Proceed starting March 2, 2026, and must be completed within 940 calendar days, concluding on September 27, 2028. Contractors are required to submit bid guarantees, performance and payment bonds, and adhere to Davis-Bacon wage determinations with weekly certified payroll submissions. The project demands comprehensive quality control and assurance systems, including detailed inspections for earthwork, concrete, asphalt, utility systems, and fire suppression, guided by Division 01 general requirements and construction specifications referenced in the contract documents. All work must comply with OSHA standards, EMR ratings, and VA-specific infection control protocols as outlined in the VHA ICRA template, with construction categorized and risk-assessed per patient exposure levels. Site visits were conducted but not mandatory, with pre-bid questions and documentation addressed through multiple amendments extending the proposal deadline from the initial December 3, 2025 date to January 29, 2026. Proposals must be submitted exclusively via email to Contracting Specialist Jesus A. Villegas, with attachments limited to 15 MB total, in approved formats such as PDF, Microsoft Office, and AutoCAD, but not ZIP or password-protected files. The evaluation process prioritizes management expertise, workforce capability, and past performance over cost, using a best-value trade-off approach under FAR 15.101-1, and no LPTA method is applied. Compliance with FAR clauses including 52.228-1 (bid guarantee), 52.222-5 (wage rates), and 52.236-27 (site visit) is mandatory, and contractors must adhere to Buy American requirements for construction materials. The Contracting Officer’s Representative, Carly

General Info

VA seeks SDVOSB bids to replace exterior utility lines at Muskogee VA Medical Center, completion by 2028.

Contract Value

$8,570,100

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

16
DOCX, High priority: read this first2 pages · amendment
High
DOCX, High priority: read this first3 pages · amendment
High
DOCX, High priority: read this first1 page · amendment
High
DOCX, High priority: read this first11 pages · amendment
High
DOCX, High priority: read this first4 pages · sow
High
PDF, High priority: read this first47 pages · geotechnical-report
High
DOCX, High priority: read this firstpast-performance
High
PDF, High priority: read this first2 pages · presolicitation
High
DOCX, High priority: read this first89 pages · ifb
High
PDF, High priority: read this first8 pages · sow
High
DOCX, Low priorityaward
Low
PDF, Low priority2 pages · other
Low
PDF, Low priority39 pages · other
Low
PDF, Low priorityprebid-sign-in-sheet
Low
PDF, Low priority411 pages · other
Low
DOCX, Low priority2 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Dec 3, 2025 to Dec 17, 2025. The notice description changed.

Notice updated

Response deadline changed from Dec 17, 2025 to Jan 6, 2026. The notice description changed.

Notice updated

Response deadline changed from Jan 6, 2026 to Jan 21, 2026. The notice description changed.

Notice updated

Response deadline changed from Jan 21, 2026 to Jan 29, 2026. The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA

Full Description

Show more
Jack C. Montgomery Veteran s Affairs Medical Center (MUS VAMC)
Statement of Work Replace Exterior Utility Lines Construction Project
Project Number: 623-24-101 Project Name: Replace Exterior Utility Lines
OVERVIEW
Request Contractor firm provide all required labor, material, equipment, and site investigations to perform construction on the Jack C. Montgomery Veteran s Affairs Medical Center (VAMC Muskogee) water loop. The Muskogee VAMC currently has fire water and domestic water system supplied from a single loop.
This arrangement leads to stagnant water from the fire water system having an increased risk to contaminate domestic water with Legionella. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. We are in need of a contractor to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications provided. The firm shall provide acceptable electronic services for submittal and document exchange for both design and construction, i.e. Submittal Exchange . Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. Construction includes the following items:
Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration.
This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop Shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary.
Contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop.
Contractor shall store all material offsite and only bring in up to 3 days worth of material on site.
It is to be documented in the construction documents, the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA engineering staff or VA s designated Maintenance Provider.
The above requirements for design will also apply to construction and shall be in accordance with ADA, OSHA, and NFPA requirements. It is to be documented in the construction documents that the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA Engineering staff or VA s designated Maintenance Provider. Construction Prime Contractor shall provide one year of maintenance and inspection service following beneficial use as specified and required within the specifications of this project. The space conditions and the execution of this project shall proceed with minor interference to the operation of the medical center and shall comply with all requirements for infection control, utility interruptions, fire protection, and all other safety requirements of the contract.
Contractor Access and Activities
Contractor must comply with the VA security management program.
Contractors must not enter the work site without VA issued identity Badge. Contractors can be subject to inspection of personal effects when entering or leaving the project site and VA property. Contractor superintendent must escort Contractor employees to Engineering (Building 18) to obtain badge(s). The Contractor must maintain a log of Employee Names, Badge ID Numbers, Start Date(s), Departure Date(s), ID Lost Date(s), and ID Return Date(s). Updated Badge log must be given to the COR weekly or as directed by COR. Contractor s superintendent must return all badges on day of departure of employee from contract to COR. Contractor s superintendent must return all remaining badges at contract closeout to COR. Lost Badges must be reported immediately to the COR and documented on badge log. Contractor is responsible for a $100.00 fee for each lost or unreturned badge to VA.
The C&A requirements do not apply; A Security Accreditation Package is not required.
Property Access Regular Business Hours: PM must be scheduled during normal business hours, 8:00 am to 4:00 pm, Monday through Friday, excluding the following Federal holidays: The following Federal legal holidays are observed by this facility:
New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
COR must be informed in the following situations: To schedule any work. After arriving on site but before any work is started. To provide an approximate timeframe for the work. As soon as it is known that the work will take longer than expected. At completion of work prior to leaving the facility. To report any incomplete aspects of the work or issues that could not be corrected during the visit. To furnish a written plan for corrective action for any work that cannot be completed within 24 hours. Plan must be furnished to and approved by the COR.
Safety must be the Contractor s highest priority. The Contractor must be in accordance with Federal, State, Local OSHA regulations, latest edition of NEC, latest edition of NFPA 70E, and 01 35 26 Safety Requirements specification. The Contractor must furnish and have in place Personal Protective Equipment (PPE) including, but not limited to, safety signage, cones, and barricades, to protect the safety of VA patients, employees, visitors, volunteers, tenants and others. Contractor must not be permitted to work without proper PPE and can be directed to leave job site. Contractor must furnish required safety items and wear required PPE. Work must be conducted in a manner and at times which would present the least amount of disruption to the VA healthcare facility.
Contractors must not leave or unattended out-of-service any utility, fire protection, or security system without written permission of the COR. If a utility, fire protection, or security system is not functioning at the end of a work period without written permission of the COR, then the Contractor must restore the system(s) to working order prior to leaving the jobsite or must furnish an around-the-clock watch until the system is functioning properly. If the Contractor fails to do so, the Contractor must reimburse the Government for any costs incurred by the VA to furnish around-the-clock watch and/or repair the system(s).
Vehicles and Construction equipment: Contractors keys to unattended vehicles and equipment must be removed and vehicles locked.
Unloading and Parking: No materials or equipment are permitted through the front entry. Use loading dock entrance only for loading and unloading, do not leave vehicle(s) unattended. Contractor parking on VA property is limited to availability of designated Contractor parking. Contractor must have prior written approval of on-site Contractor parking from COR. Contractor parking shall be in lot 4 or at the Hatbox and ride the shuttle up. No parking space shall be reserved for the contractor.
Elevators: Contractor must use COR designated elevators and must protect elevator cabs and controls during periods of use. The Contractor must not exceed elevator weight limits. Designated elevator(s) and usage times are not to interfere with VA activities.
Radios and Mobile Devices: Contractor must use mobile devices at low volume or outside. The Contractor must not carry on conversations in hallways or near any patient areas. AM/FM radios and other media producing devices must not be used in the buildings.
Noise: Contractor must coordinate and schedule noise making activities with the COR. For any noise making work activities, the Contractor must furnish a written request to the COR for COR approval a minimum of seven (7) business days prior to noise making activities. The COR will schedule and provide written authorization to proceed three (3) business days in advance of the proposed activity.
Disposal: The Contractor must submit a written request(s) for disposal of any government owned materials, equipment, or property in advance to the COR for COR written approval. Contractor must remove and properly dispose construction debris, materials, equipment, and substances from VA property daily into the Contractor supplied containers. Contractor s supplied dumpsters shall be always covered. Construction debris created from the contract shall not be disposed of at the job site, in VA dumpsters, or on VA property. Disposal of construction debris, materials, equipment, and substances from the contract must be in accordance with applicable Federal, State, Local and environmental laws, rules or regulations.
The Contractor must ensure and furnish appropriate documentation to the CO that all hazardous waste handlers, haulers, and disposal facilities are properly licensed. The Contractor must furnish shipping manifest and documentation of proper disposal of any construction debris, materials, equipment, and substances from the contract work prior to final payment. Contractor must return the work site to the condition in which it was found at the Contractor s expense.
Warranty: Contractor must guarantee workmanship for a period of one (1) year after COR written acceptance of work. Contractor must furnish a minimum 1-year parts and labor warranty on materials, equipment, parts and components furnished and any manufacturer s warranty greater than one (1) year.
In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (m) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
The Contractor shall remedy at the Contractor s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of- The Contractor s failure to conform to contract requirements; or Any defect of equipment, material, workmanship, or design furnished.
The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor s expense.
With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall- Obtain all warranties that would be given in normal commercial practice. Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
In the event the Contractor s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor s, manufacturer s, or supplier s warranty.
Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
This warranty shall not limit the Government s rights under the Inspection and acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
Photography: Contractor must not photograph any patients, personnel, visitors, and others on VA property. Contractor must be escorted by VA personnel to take jobsite related photos and be coordinated by COR.
Hatbox parking can be located at: 504 S Hatbox Rd, Muskogee, OK 74401
Other requirements: 1. Anything remaining in place that is damaged or defaced by the Contractor must be restored by the Contractor to the existing condition, at no additional expense to the Government. 2. The Contractor must furnish adequate protection to VA property and personnel prior to work activities. Contractor moved items must be put back by the Contractor to original locations and conditions as work is completed, at no additional expense to the Government. 3. No unauthorized work to be initiated without the prior written approval of the CO. 4. Work required for the project must be in accordance with the best practices and in accordance with the intent of the SOW, drawings, and specifications. 5. Utilities and work areas may not be immediately available, and the Contractor must be flexible in the inspections schedule at no additional cost to VA. 6. All OEM recommended safety aspects of the equipment being serviced must be adhered to.
Site Visit Information:
Contractors will meet at the following location before starting the site visit. It is marked in red below at 1011 Honor Heights Drive Muskogee, OK 74401, meeting in room number 08-18. For parking at Muskogee, OK VA parking should be at lot 14 marked in blue below. Should that parking lot be full, parking is also available at the Hat Box located at: 504 S Hatbox Rd, Muskogee, OK 74401. There is a shuttle that runs back and forth between the parking lot and the hospital, from 7:00 am to 6:00 pm. There will be no equipment provided, i.e., a ladder to get on the roof, light for the basement, etc. If the contractor needs anything, the contractor will have to provide it

Construction is to be completed in 940 calendar days from notice to proceed.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

NAICS: 532490
New
Federal
W044--Temporary Boiler Rental & Maintenance
Solicitation # 36C25927Q0057
The Department of Veterans Affairs, through Network Contracting Office 19, is soliciting a small business set-aside contract for the rental and maintenance of two 650 horsepower mobile boilers and one mobile control room trailer at the Grand Junction station in Colorado. The scope of work includes providing the equipment, performing twelve monthly preventive maintenance services per year, and providing troubleshooting and repair services. The contractor must ensure a two-hour phone response to emergency calls and a twenty-four-hour mobilization for on-site repairs. Upon the expiration of the rental period, the contractor is responsible for the teardown, removal, and transportation of all equipment. The initial period of performance is one year, with the possibility of additional one-year extensions. Maintenance must be conducted according to EPA, Boiler Efficiency Institute, and VA standards, referencing VHA Directive 1810 and specific safety device protocols. Key requirements include the employment of a technician from a licensed boiler and pressure vessel insurance company, adherence to VA lockout/tagout procedures, and compliance with patient confidentiality guidelines. Proposals must include a detailed cost breakdown by CLIN, covering rental, preventive maintenance, and emergency repair labor and travel.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238110
New
Federal
554-27-117 Conduct Concrete and Civil Site Repairs.
Solicitation # 36C25926Q0826
Solicitation 36C25926Q0826 is a 100 percent Service-Disabled Veteran-Owned Small Business set-aside for concrete and civil site repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado. The project, estimated between 100,000 and 250,000 dollars, involves comprehensive drainage remediation and concrete work, including removing and replacing concrete, sidewalk leveling, curb repair, sidewalk additions, wall reconstruction, and the installation of bollards. The contractor must provide all labor, equipment, and supervision, adhering to strict OSHA safety standards, including OSHA 10 certification for all personnel and OSHA 30 for supervisors. Performance is expected to begin within 10 calendar days of award and must be completed within 90 calendar days. The award will be based on best value, evaluating price, past performance on at least two similar projects of 100,000 dollars or more within the last five years, and safety records, including an Experience Modification Rate of 1.0 or less. Key requirements include the submission of a Site Specific Safety Plan, compliance with the Davis-Bacon Act, and adherence to SDVOSB limitations on subcontracting. Technical specifications mandate the use of qualified journeyman painters for coatings and strict quality control protocols, including final acceptance inspections. Proposals must be submitted via email to the designated contracting officer, including a signed SF 1442, a 20 percent bid bond, and necessary certifications.
Poured Concrete Foundation and Structure Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 513210
New
Federal
Bayesian Dosing Software
Solicitation # 36C25927Q0009
The Department of Veterans Affairs, Network Contracting Office 19, is soliciting quotes for a firm-fixed-price contract to provide Bayesian-guided medication dosing software, such as PrecisePK or an equivalent, for the VA Salt Lake City Health Care System. This small business set-aside acquisition consists of a base year running from December 1, 2026, to November 30, 2027, with four optional 12-month renewal periods, for a maximum total duration of five years. The software must be a web-based tool capable of optimizing therapeutic drug levels through pharmacokinetic parameters and patient-specific dosing recommendations, while maintaining full compliance with HIPAA, GDPR, and 2020 IDSA/ASHP Vancomycin guidelines. Key technical requirements include integration with VISTA and CERNER EHR systems, 24/7 technical support, and virtual training conducted by personnel with a clinical background. Quotes must be submitted via email to the designated point of contact by 12:00pm MST on November 16, 2026, and must include three volumes covering technical capability, pricing, and a Buy American Certificate. Award will be made to the responsible offeror determined to be most advantageous to the government based on a comparative analysis of price and technical factors, though the government may select a higher-priced offeror if it is in the best interest of the government. Essential submission requirements include a signed and dated RFQ and an authorization letter consistent with VAAR 852.212-71(c). Payment will be issued on a monthly arrears basis following government approval of itemized invoices.
Software Publishers

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 337121
New
Federal
7105--Bedroom Furniture Replacement
Solicitation # 36C25927Q0036
Solicitation 36C25927Q0036 is a firm-fixed price, 100 percent Service-Disabled Veteran-Owned Small Business set-aside for the procurement and installation of bedroom furniture at the Valor Point Homeless Domiciliary in Lakewood, Colorado. The scope of work includes the removal and disposal of existing furniture, specifically 38 twin beds, 2 queen beds, 40 mattresses, 40 wardrobes, and 40 bedside tables, and the installation of new Kwalu furniture or approved equals. All items must feature a finish equivalent to Kwalu Protea Natural Oak. Due to the facility being occupied 24/7, installation is restricted to three rooms per day, and the contractor is responsible for patching and repairing all wall anchor holes resulting from the removal and installation process. Quotes must be submitted electronically to [email hidden] by 14:00pm MT on November 13, 2026. Submissions must be organized into three volumes covering technical capability, price, and required certifications, including the Buy American Certificate and the VA Notice of Limitations on Subcontracting. Evaluation will be conducted via a comparative process considering price and technical specifications, with a requirement that the proposed project manager or lead installer possesses at least two years of relevant healthcare installation experience. Additionally, the awarded contractor must provide 30 days of free conditioned storage for the materials and ensure all products are new and provided by an authorized distributor.
Upholstered Household Furniture Manufacturing

POSTED

3 days ago

DEADLINE

in about 4 hours
View Details
NAICS: 334516
New
Federal
6640--Blood Culture Analyzers with Bottles (Multi-station) Fort Harrison, Cheyenne, Grand Junction, and Sheridan
Solicitation # 36C25927Q0055
The Department of Veterans Affairs, through Network Contracting Office 19, is conducting market research via a Sources Sought notice to identify qualified vendors for a cost-per-bottle contract. The requirement is to provide new, FDA-approved automated blood culture analyzers and corresponding bottles for four VA Medical Centers located in Fort Harrison, MT; Cheyenne, WY; Grand Junction, CO; and Sheridan, CO. The anticipated contract structure includes a one-year base period followed by four optional years. The scope encompasses the provision of the newest countertop analyzer models, management software, connectivity and workflow management, and a variety of aerobic and anaerobic culture bottles. Key technical requirements include the ability to analyze blood, fungal, and acid-fast bacteria (AFB) culture bottles, as well as body fluid specimens. The systems must feature bi-directional interface capability with the laboratory information system via Data Innovations (DI) and TCP/IP protocol, and must be compatible with Bruker MALDI bio-typer. Specific requirements include remote monitoring for the Sheridan facility, a 30-minute backup UPS system, and adherence to College of American Pathologists (CAP) standards for validation. The vendor must provide comprehensive support, including annual preventative maintenance, 24/7 telephone technical support, and a field engineer available within 24 hours of a service call. This is a commercial supply acquisition under FAR Part 12, and interested vendors must provide their socioeconomic status relative to NAICS 334516 and a capability statement.
Analytical Laboratory Instrument Manufacturing

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS