Zeta Solar and Battery Energy Storage System Project - Solar Benefits Agreement Implementation Plan

Forecast
2025-EIR-106State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zeta Solar Generation and Battery Energy Storage System Project involves the construction, operation, maintenance, and decommissioning of a 75 MW AC photovoltaic solar power generation facility and a battery energy storage system with up to 8 hours of storage capacity. Located on approximately 650 acres in unincorporated Merced County, California, the project includes an onsite substation and a 1,700-foot generation-tie line connecting to the PG&E Mercy Springs Substation. The project is being developed by Zeta Solar, LLC, and is overseen by the Merced County Community and Economic Development Department. On August 26, 2025, Merced County approved the Solar Benefits Agreement Implementation Plan, with a Notice of Determination filed on August 27, 2025. The project has undergone environmental review in compliance with the California Environmental Quality Act, including the certification of an Environmental Impact Report and a Mitigation Monitoring and Reporting Program. While the project is managed through local government permitting and environmental filings rather than federal acquisition regulations, it requires strict adherence to CEQA findings and the approved implementation plan to ensure regulatory compliance.

General Info

Zeta Solar will build a 75MW solar and battery facility in Merced County.

Agency

California Merced County of, Community and Economic Development Department

Place of Performance

Poleline Road and First Lift Canal Road, CA, 93635

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Merced County of, Community and Economic Development Department
Contacts2 people available
OfficeN/A

Full Description

Show more
Approval of the Solar Benefits Agreement Implementation Plan for the Zeta Solar Generation and Battery Energy Storage System Project. The Project would involve the construction, operation, maintenance, and decommissioning of a photovoltaic (PV) solar power generation facility, battery energy storage system (BESS), onsite Project substation, and other associated infrastructure. The Project would generate approximately 75 megawatts (MW) alternating current (AC) of renewable energy and include a storage capacity of up to 8 hours of 75 MW of AC. The Project is located on all or portions of several contiguous parcels, totaling approximately 650 acres (Project site), plus an additional 1,700-foot-long generation-tie (gen-tie) line to deliver power from the Project to Pacific Gas and Electric’s (PG&E’s) existing Mercy Springs Substation (point of interconnection) in unincorporated Merced County, located approximately 0.25 mile north of the Project site.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS