Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Zone 5 Storm System Cleaning Project

Closed
6330State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 14 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Oak Lodge Water Services is soliciting quotes from qualified contractors for the Zone 5 Storm System Cleaning Project in Oregon. The scope of work involves the removal and disposal of debris from 129 catch basins and 1,138 linear feet of pipe. Selected contractors must provide pricing based on a cost per catch basin and per linear foot of pipe, while maintaining detailed tracking and reporting of the cubic yards of debris removed from each asset. Bids for this project are due by 2:00 PM PST on September 9, 2026. The primary point of contact for the project is Lara Christensen, and interested parties can find further details and asset locations via the provided GIS map and solicitation number 6330.

General Info

Oak Lodge Water Services seeks quotes for Zone 5 storm system cleaning by 9/9/26.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Oak Lodge Water Services
Contacts1 person available
OfficeUSA
Office AddressUSA
Contacts
Oak Lodge Water Services

Full Description

Show more
Bids Due and Bid Closing Date and Time: 2:00 PM PST, September 9, 2026.
Oak Lodge Water Services is seeking quotes from qualified and experienced contractors able to provide cleaning services for the Zone 5 Storm System Cleaning Project.
The project consists of the removal and disposal of debris in 129 catch basins and 1138 linear feet (LF) of pipe in Zone 5 at an agreed upon cost per catch basin and LF of pipe, and tracking and reporting on the cubic yards of debris removed per catch basin and debris removed per stretch of piping.
A link to the GIS map of assets identified for cleaning is here: Catch Basin Cleaning Zone 5 Map.
The OLWS Representative for the Zone 5 Storm System Cleaning Project is:
Lara Christensen
Oak Lodge Water Services
14611 SE River Road
Oak Grove, OR 97267
contact@example.gov
+1 (555) 000-0000

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS