Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

1ST SERVICES LLC

UEI: MB9UHHNYGK83

1ST SERVICES LLC is a federal contractor, registered under UEI MB9UHHNYGK83. It has been awarded $351,372 in federal contracts. Primary work spans Iron and Steel Mills, Other Metal Valve and Pipe Fitting Manufacturing, and Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

MB9UHHNYGK83

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

19

All time

Active

0

Currently performing

Completed

19

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Compete with 1ST SERVICES LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for 1ST SERVICES LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in 1ST SERVICES LLC's top NAICS codes and agencies

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed construction. Additional requirements encompass support services like traffic control, site security, and storm water pollution prevention, along with the supply of materials such as precast concrete, ready mix, and cathodic protection. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. To be considered, responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system, with primary coordination handled by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
The California Department of Transportation is soliciting bids for construction projects in Los Angeles County at various locations on Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. This unit price contract, estimated at 7.4 million dollars, involves roadway excavation, concrete removal, clearing and grubbing, and the implementation of pavement structural sections. The scope includes comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs, with a mandate that the full width of the traveled way remains open when construction is not active. The project adheres to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Key requirements include strict marking and identification for temporary steel barriers, lockjaw covers, and connection bolts, as well as the use of two-coat paint for temporary traffic striping. Quality control is rigorous, requiring ACI Concrete Field-Testing Technician Grade 1 certification for inspection personnel and specific data collection periods for traffic counter acceptance. Contractors must comply with Buy America/Build America standards, prevailing wage requirements, and lead compliance plans. Bids are due by December 8, 2026, and the project allows for the start of job site activities before the 55th day after contract approval provided specific authorizations are met.
California Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
The California Department of Transportation has issued solicitation 08-1N8804 for a construction project on State Highway Route 62 in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and has an estimated cost of 3,530,000 dollars. Primary work includes the installation of hot mix asphalt, imported borrow, and the implementation of signal and lighting systems. Technical requirements specify the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and wrong-way alerts, with network equipment integrated into the Inland Empire Transportation Management Center following IEEE 802.3 and NEMA TS-1/TS-2 standards. Bids must be submitted on a unit price basis by December 2, 2026. The contract mandates strict adherence to Buy America requirements under 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing DVBE quotes and adhering to prevailing wage rates determined by the California Department of Industrial Relations. Quality assurance involves source testing for service equipment and operational performance tests for network latency and bandwidth. Additionally, contractors must provide certifications from a registered civil engineer or professional geologist regarding the pH and lead levels of local materials used.
California Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County About 8 Miles South Of Willits From 0.2 Mile North Of Ridgewood Ranch Road To 0.4 Mile South Of Black Bart Road
Solicitation # 01-OL3804
Solicitation 01-0L3804 is a cost-plus-time basis contract issued by the California Department of Transportation for highway construction on Route 101 in Mendocino County. The project is located approximately 8 miles south of Willits, extending from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. With an estimated project cost of 13.7 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt and High Friction Surface Treatment, and the installation of Asphalt Concrete Pavement and concrete barriers. Additional infrastructure deliverables include concrete curbs, sidewalks, railings, fences, and the implementation of a comprehensive traffic control system. The project is governed by 2025 Standard Specifications and Standard Plans, with project-specific plans approved on June 9, 2026. Key compliance requirements include adherence to Buy America/Build America for manufactured products, the submission of a Lead Compliance Plan, and the use of LCPtracker Pro for electronic certified payroll records. Performance is subject to strict environmental and safety constraints, including a restricted work window for drainage channels from June 15 to October 15. Quality assurance involves source inspections for equipment and independent laboratory testing for materials, with final acceptance of the High Friction Surface Treatment managed by the Department. Bids for this solicitation open on December 8, 2026.
California Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details