Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

71 CONSTRUCTION 7072 BARTON DR CASPER WY 82604-1890 US

UEI: SLED_C99731CB67B5B478

71 CONSTRUCTION 7072 BARTON DR CASPER WY 82604-1890 US is a federal contractor, registered under UEI SLED_C99731CB67B5B478. It has been awarded $429,673 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_C99731CB67B5B478

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

71 Construction provides specialized industrial rehabilitation and repair services. Their technical expertise includes the restoration of water treatment and separation infrastructure, specifically the rehabilitation of radial clarifiers and the correction of floating equipment issues. The company ...

71 Construction provides specialized industrial rehabilitation and repair services. Their technical expertise includes the restoration of water treatment and separation infrastructure, specifically the rehabilitation of radial clarifiers and the correction of floating equipment issues. The company has experience supporting the Department of the Interior, where they perform critical infrastructure repairs and equipment rehabilitation. Their primary industry focus falls under heavy and civil engineering construction, with a practical specialization in the maintenance and repair of industrial separators and water management systems. The company is based in Casper, Wyoming.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with 71 CONSTRUCTION 7072 BARTON DR CASPER WY 82604-1890 US

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for 71 CONSTRUCTION 7072 BARTON DR CASPER WY 82604-1890 US

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in 71 CONSTRUCTION 7072 BARTON DR CASPER WY 82604-1890 US's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of mechanical and electrical systems, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers and manholes, site grading, stormwater facilities, and paving restorations. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with an evaluation process focusing on bidder qualifications and price comparison based on estimated quantities. The project has a substantial completion timeline of 560 calendar days following the Notice to Proceed. Bidders must provide performance and payment bonds, proof of insurance, and demonstrate good faith efforts toward MWBE subcontracting opportunities. Technical standards require Class 250 ductile iron pipe with Protecto 401 lining and compliance with North Carolina Administrative Code for sanitary sewer clearances. Contract administration is managed by Willis Engineers, and payments are due thirty days after the submission of an application for payment.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, which involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder who meets the required qualifications, including providing three similar project references and confirming they are not on any government debarment lists. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 12, 2026. Requirements for the successful bidder include providing performance and payment bonds equal to 100 percent of the contract amount, adhering to Davis-Bacon wage determinations, and ensuring all new sidewalks and ramps meet ADA standards. Bidders must be registered contractors in the Commonwealth of Virginia and provide a bid guarantee of 5 percent of their total bid.
WG Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project for the East Bay Municipal Utility District in Oakland, California. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, and they must provide their bond rate at the time of the bid for reimbursement. All contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any proposed exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details