Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

ABE, ALBORN

UEI: GNKVE9N8SZL5

ABE, ALBORN is a federal contractor, registered under UEI GNKVE9N8SZL5. It has been awarded $8,800 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of Homeland Security.

Contact Information

Registration and classification details

Registration

UEI Code

GNKVE9N8SZL5

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

ABE, ALBORN provides specialized construction services focused on water and sewer line infrastructure. Their technical expertise includes the repair and maintenance of waste line drain pipes and related utility structures. The company has experience supporting the Department of Homeland Security, s...

ABE, ALBORN provides specialized construction services focused on water and sewer line infrastructure. Their technical expertise includes the repair and maintenance of waste line drain pipes and related utility structures. The company has experience supporting the Department of Homeland Security, specifically delivering critical infrastructure repairs for housing facilities. Their industry focus is centered on NAICS 237110, specializing in the construction and restoration of water and sewer line systems.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with ABE, ALBORN

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ABE, ALBORN

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ABE, ALBORN's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional site requirements include the installation of stormwater facilities, fencing, a yard hydrant, and comprehensive grading and shaping. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE participation goals, which include EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Bidders must provide a performance bond and payment bond equal to the contract price, and insurance providers must maintain an A.M. Best rating of A-VII or better. Project administration is managed by Willis Engineers, and payments are processed via Applications for Payment, becoming due 30 days after presentation to the owner. All work must adhere to ANSI/AWWA and ASTM standards, with final acceptance contingent upon absolute compliance with the contract documents.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 11 hours
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bidders must adhere to strict compliance standards, including the Davis-Bacon Act, American Iron and Steel requirements, and EEO regulations. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount and ensure all work meets VDOT 2020 Road and Bridge Specifications and City of Winchester Standards. Bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 12, 2026.
WG Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in about 11 hours
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and lead abatement. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, replacement of motor control center components, and the installation or improvement of electrical and instrumentation systems. Civil and operational tasks include excavation, trench work, surveying, the installation of platforms and access improvements, and the rerouting of sump pump discharge lines. A critical operational component is the installation and operation of a temporary 11 MGD pumped bypass. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work includes the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines, the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include smaller pumps and an elevated electrical platform, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station. A critical requirement of the project is maintaining the continuous operation of the existing Butterfield Lift Station and force main throughout the duration of the work. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, pipe, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Following Addendum No. 8, which addressed design changes to pump specifications, the final deadline for bid submission via PlanetBids is November 19, 2026, at 2:00 p.m.
Filanc

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details