Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Abel Building Restoration, Inc., 888 East Bevidere Road, Suite 216, Grayslake, Illinois 60030. All line items are accepted except 009-011

UEI: SLED_4D6EE4A04F2538B8

Abel Building Restoration, Inc., 888 East Bevidere Road, Suite 216, Grayslake, Illinois 60030. All line items are accepted except 009-011 is a federal contractor, registered under UEI SLED_4D6EE4A04F2538B8. It has been awarded $1,077,000 across 1 federal contract. Primary work spans Masonry Contractors. Top awarding agencies include Pbs R5 Acquisition Management Division.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_4D6EE4A04F2538B8

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Pbs R5 Acquisition Management Division$1.1M100%
Awards by NAICS
238140 - Masonry Contractors$1.1M100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in Abel Building Restoration, Inc., 888 East Bevidere Road, Suite 216, Grayslake, Illinois 60030. All line items are accepted except 009-011's top NAICS codes and agencies

NAICS: 238140
New
2026-Nalo-Concrete Patching and CMU Wall Repair
Solicitation # 2026- Nalo- Concrete Patching and CMU Wall Repair
Management and Training Corporation (MTC) is seeking bids for a lump sum subcontracting opportunity to perform masonry and concrete services at the Hawaii Job Corps Center in Waimanalo. The scope of work includes the demolition and removal of approximately 230 linear feet of failed CMU wall, the installation of 230 linear feet of 8-foot high galvanized chain link fencing, and various concrete repairs including the removal and replacement of 168 square feet of walkways and 150 square feet of slabs, as well as structural repairs to a stairwell corner. Bids are due by August 28, 2026, and will be awarded based on overall best value. Eligible bidders must hold a valid Hawaii type A, B, or C-24 specialty license and conduct a mandatory physical site visit prior to submission. The contract requires strict adherence to Construction Wage Rate Requirements and the submission of weekly certified payroll reports. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent of the base bid is required, along with performance and payment bonds. Comprehensive insurance coverage is mandatory, including general liability of 1 million dollars per occurrence and worker's compensation with employer's liability of at least 500,000 dollars. The project is subject to various federal regulations, including FAR clauses regarding small business utilization and the Foreign Corrupt Practices Act, and is governed by the laws of the state of Utah.
Management & Training Corporation

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238140
New
Federal
Z--PDT EXTERIOR WALL REPAIR AT PENDLETON WFO
Solicitation # 1305M326Q0429
This Request for Quotation (RFQ) from the Department of Commerce, NOAA, seeks commercial construction services for brick exterior restoration at the Weather Forecast Office in Pendleton, Oregon. The project involves reconditioning approximately 5,363 square feet of brick and mortar on the office and an adjacent generator building, including cleaning, repairing, replacing expansion joints, and applying two coats of sealer. The contract is structured as a single-award, firm-fixed-price purchase order on an all-or-none basis, designated as a total small business set-aside under NAICS code 238140. The period of performance is 365 calendar days following the notice to proceed, with work required to commence within one business day of the award. Evaluation of proposals will follow a trade-off process where non-price factors—specifically technical approach, experience in building restoration, and past performance—are considered significantly more important than price. Offerors must submit a single electronic package via email containing a detailed technical approach, at least two past performance references, and a mandatory Asbestos-Containing Materials Certification. Compliance with prevailing wage rates for Umatilla County, Oregon, is required, and all work must adhere to OSHA, EPA, and NFPA standards. Key administrative requirements include electronic invoicing through the Treasury’s Invoice Processing Platform (IPP) and strict adherence to security protocols, including the requirement that all contractor personnel be escorted by an NWS employee while on-site.
Department Of Commerce Noaa

POSTED

3 days ago

DEADLINE

in about 7 hours
View Details
NAICS: 238140
New
Federal
Arlington National Cemetery Boundary Wall Repairs Phase 6
Solicitation # W912QV1-26-R-A056
Solicitation W91QV126RA056 is a Firm Fixed Price requirement for the deconstruction and reconstruction of approximately 550 linear feet of historic stone boundary wall, specifically sections 17 and 18, at Arlington National Cemetery. This Small Business Set Aside project, managed by the Military Construction Contracting Command at Fort Belvoir, requires the contractor to provide all management, labor, materials, and equipment to restore the wall to existing specifications while preserving and reusing original materials. The period of performance is scheduled from October 1, 2026, to December 31, 2027, with performance and inspection taking place at Fort Myer, Virginia. The award will be based on the Lowest Price Technically Acceptable (LPTA) competitive process. To be considered, vendors must submit a proposal consisting of three volumes: Administrative, Technical Execution Plan, and Price. Technical acceptability is determined by a line-by-line review against the Statement of Work and the Supplier Performance Risk System. Key personnel requirements include stone masons and laborers with at least five years of experience in historical stonework and a project manager with five years of construction experience. Additionally, the contractor must have completed at least three projects of similar scope. Contractual obligations include strict adherence to security protocols, including background checks, Antiterrorism Level I training, and DoD Cyber Awareness training. All invoicing must be processed through Wide Area WorkFlow (WAWF). Proposals are due electronically by September 4, 2026, at 4:00 PM EST.
W6QM Micc-Ft Belvoir

POSTED

3 days ago

DEADLINE

in 14 days
View Details