Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

BC ALLEN COMPANY LLC

UEI: HG3XAJC6QFN6CAGE: 19A63

BC ALLEN COMPANY LLC is a federal contractor, registered under UEI HG3XAJC6QFN6 and CAGE code 19A63. It has been awarded $124,550 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

HG3XAJC6QFN6

CAGE Code

19A63

Entity Structure

Sole Proprietorship

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability Company

NAICS Codes

238910Site Preparation Contractors(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

BC Allen Company LLC specializes in heavy and civil engineering construction, with specific technical expertise in streambank stabilization and environmental water project implementation. Their capabilities focus on erosion control and the structural reinforcement of waterways to prevent land loss a...

BC Allen Company LLC specializes in heavy and civil engineering construction, with specific technical expertise in streambank stabilization and environmental water project implementation. Their capabilities focus on erosion control and the structural reinforcement of waterways to prevent land loss and manage water flow. The company provides specialized construction services for the Department of Agriculture, specifically delivering infrastructure projects related to streambank stabilization. Their industry focus centers on other heavy and civil engineering construction, positioning them as a provider for specialized environmental and civil works projects. Based in Fairmont, West Virginia, the company is structured as a 2J entity.

Key Performance Metrics

Awards Count

1

All time

Active

1

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with BC ALLEN COMPANY LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for BC ALLEN COMPANY LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in BC ALLEN COMPANY LLC's top NAICS codes and agencies

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 20 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
SLED
Turlock Lake Recreation Area Dock Replacement
Solicitation # 26-41-JNS
Stanislaus County is soliciting bids for the Turlock Lake Recreation Area Dock Replacement project in La Grange, California. The scope of work requires the contractor to remove and dispose of the existing dilapidated dock and install a new commercial-grade floating dock system. This system must feature a 2 inch by 6 inch by 1/4 inch aluminum box-tube main frame, 12-inch-high encapsulated floats, and aluminum non-slip decking. All work must be performed during regular business hours, Monday through Friday from 8:00 A.M. to 5:00 P.M. Proposals must be submitted electronically via the County vendor portal by 2:30 P.M. on November 12, 2026. The award will be based on the best interest of the County, considering specification compliance, delivery time, and price. Required submission documents include an itemized quote for labor and materials, a completed schedule of bid prices, a signed non-collusion affidavit, and a list of subcontractors. The contract is governed by California law and requires strict adherence to labor code compliance, prevailing wages, and non-discrimination policies. Contractors must provide a bid security of 10 percent of the project price, as well as performance and payment bonds each valued at 100 percent. Additionally, vehicles used must comply with CARB labeling requirements for off-road diesel-fueled fleets, and all hazardous materials must be accompanied by OSHA-standard Safety Data Sheets. Payment terms are Net 30 days following the approval of detailed monthly itemized invoices.
Stanislaus County

POSTED

about 21 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code Section 2.52.020. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for a final best-value selection. Interested entities must submit their SOQ via the PlanetBids portal by November 20, 2026. Mandatory submission requirements include a Certification Form, Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 21 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237990
New
SLED
Capital Improvement Project No. 24-99 Downtown Downey Gateway Sign Installation
Solicitation # 24-99
Capital Improvement Project No. 24-99 is a solicitation by the City of Downey, California, for the furnishing and installation of an overhead gateway sign and associated infrastructure at the intersection of Firestone Boulevard and Downey Avenue. The scope of work includes the fabrication and installation of the sign, construction of electrical service connections to a new metered pedestal and sign post, and various site improvements such as sidewalk restoration, placement of new pavers, irrigation line re-routing, and the removal and disposal of existing trees. All work must adhere to approved shop drawings and structural plans, with specific requirements for electrical labeling to comply with UL 969 standards and the removal of all USA markings upon completion. The project follows a two-stage performance schedule: the contractor must order equipment upon the first Notice to Proceed and may begin field work 20 working days prior to the delivery of the final equipment, with a total of 40 working days allotted to complete all contract work. Bids are evaluated based on the lowest responsible bidder, considering equalizing factors like transportation and installation costs, while unbalanced bids may be rejected. Payment is based on contract unit prices, and force-account work requires detailed invoices submitted within 15 days of completion. Contractors must comply with California prevailing wage laws, provide public liability and workers compensation insurance, and submit a notarized proposal including a noncollusion affidavit and site inspection certification via the city's online vendor portal.
City of Downey

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details