Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

WYCOFF CONSTRUCTION, INC.

UEI: LAFLSSDAPRB3CAGE: 47ZR9

WYCOFF CONSTRUCTION, INC. is a federal contractor, registered under UEI LAFLSSDAPRB3 and CAGE code 47ZR9. It has been awarded $5,877,441 across 77 federal contracts. Primary work spans Highway, Street, and Bridge Construction, Support Activities for Forestry, and Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Agriculture, Department Of Transportation, and Other agencies (1 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

LAFLSSDAPRB3

CAGE Code

47ZR9

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

272X

NAICS Codes

113310Logging
115310Support Activities for Forestry(Primary)
212321Construction Sand and Gravel Mining
221310Water Supply and Irrigation Systems
221320Sewage Treatment Facilities
+9 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Billy Wycoff specializes in heavy equipment operations and infrastructure maintenance within federal forested lands, delivering critical highway, road, and forestry support services under the U.S. Department of Agriculture. Their core capabilities include road grading, erosion control, and structura...

Billy Wycoff specializes in heavy equipment operations and infrastructure maintenance within federal forested lands, delivering critical highway, road, and forestry support services under the U.S. Department of Agriculture. Their core capabilities include road grading, erosion control, and structural repairs on remote forest access routes, with demonstrated proficiency in executing precision earthmoving and right-of-way maintenance using heavy machinery in rugged, ecologically sensitive terrain. The contractor brings hands-on expertise in executing tasks under the National Forest System’s environmental compliance frameworks, ensuring adherence to NEPA and USDA Forest Service engineering standards. Specialization in VIPR I-BPA logistics for regional equipment deployment indicates advanced coordination in mobilizing and sustaining heavy equipment fleets across Pacific Southwest forest regions, with an emphasis on operational readiness and minimal environmental disruption. The contractor maintains a consistent, high-frequency relationship with the U.S. Department of Agriculture, particularly through its Forest Service units in Region 5. Work performed centers on maintaining critical transportation corridors within national forests—repairing ranch access roads, grading forest service roads, and supporting fire response and resource management logistics. This recurring engagement reflects a trusted, operational partnership rooted in reliability, compliance, and on-site responsiveness in remote, high-value natural resource areas. Primary industry focus lies in NAICS 237310 (Highway, Street, and Bridge Construction) and 115310 (Support Activities for Forestry), positioning the contractor as a niche provider of terrestrial infrastructure services within federal land management ecosystems. Their market differentiation stems from direct execution of field-level earthwork and equipment support tailored to USDA’s forested land missions, distinguishing them from general civil contractors by their intimate familiarity with forest service protocols and terrain-specific engineering challenges. Operating as a sole proprietorship (2J entity) from Stonyford, California, Billy Wycoff maintains a localized, field-based presence optimized for rapid deployment across Northern California’s national forests. While no formal government certifications are listed, their consistent award history demonstrates proven capability in executing complex, compliance-driven work without reliance on formal set-aside programs.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Agriculture$5.4M92.7%
Department Of Transportation$412.2K7%
Other agencies (1 agencies, <0.5% each)$17.8K0.3%
Awards by NAICS
237310 - Highway, Street, and Bridge Construction$4.4M75.4%
115310 - Support Activities for Forestry$1.2M20.2%
237990 - Other Heavy and Civil Engineering Construction$92.3K1.6%
237110 - Water and Sewer Line and Related Structures Construction$39.1K0.7%
561990 - All Other Support Services$36.3K0.6%
Others - Other NAICS codes (6 codes, <0.5% each)$90.0K1.5%
Awards by Agency Over Time
Awards by Place of Performance

Compete with WYCOFF CONSTRUCTION, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WYCOFF CONSTRUCTION, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in WYCOFF CONSTRUCTION, INC.'s top NAICS codes and agencies

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 12 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details