Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

BRUSH ONE CONTRACTING

UEI: N83LFAVSHAF5CAGE: 3LKH5

BRUSH ONE CONTRACTING is a federal contractor, registered under UEI N83LFAVSHAF5 and CAGE code 3LKH5. It has been awarded $2,941,885 in federal contracts. Primary work spans Support Activities for Forestry, Highway, Street, and Bridge Construction, and Other NAICS codes (1 codes, <0.5% each). Top awarding agencies include Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

N83LFAVSHAF5

CAGE Code

3LKH5

Entity Structure

Sole Proprietorship

Established

N/A

Business Classifications

For Profit OrganizationSmall Agriculture Cooperative

NAICS Codes

115310Support Activities for Forestry(Primary)
561990All Other Support Services

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Brush One Contracting specializes in roadside vegetation management and forested corridor maintenance within national forest systems, delivering precision brush clearing, invasive species control, and right-of-way restoration services. Their technical expertise centers on mechanical brush cutting, m...

Brush One Contracting specializes in roadside vegetation management and forested corridor maintenance within national forest systems, delivering precision brush clearing, invasive species control, and right-of-way restoration services. Their technical expertise centers on mechanical brush cutting, mastication, and selective vegetation removal using specialized forestry equipment, ensuring compliance with ecological standards and fire hazard mitigation protocols. The contractor demonstrates a focused proficiency in executing call-offs under existing blanket purchase agreements, coordinating with forest service personnel to prioritize high-risk corridors and maintain public access safety. Their operational approach emphasizes minimal environmental disruption, adherence to NFMA guidelines, and timely completion under dynamic seasonal constraints, distinguishing them as a reliable partner for high-visibility, low-impact forestry support tasks. The company maintains a consistent and deep relationship with the U.S. Department of Agriculture, particularly through the Forest Service, delivering roadside brushing and vegetation control services on national forest lands. Their work is typically executed under existing BPA frameworks, indicating a trusted, repeat-client dynamic where performance reliability and operational consistency are paramount. All engagements are aligned with forest management plans, suggesting a strong understanding of federal land use regulations and interagency coordination requirements. Brush One Contracting’s primary industry focus is Support Activities for Forestry (NAICS 115310), which in practice means providing non-timber, maintenance-oriented services that sustain the functionality and safety of forest infrastructure. They specialize in the niche vertical of transportation corridor vegetation management within federally managed wildland-urban interfaces, positioning themselves as a targeted provider for fire prevention and public safety initiatives rather than broad timber harvesting or land development. As a small business structured as a 2J entity based in Baker City, Oregon, Brush One Contracting operates with regional agility, serving federal forestry needs across the Pacific Northwest. The company holds no formal government certifications but leverages its localized expertise, equipment access, and proven track record in executing high-priority, time-sensitive forestry support missions. Their geographic presence enables rapid mobilization to remote and rugged terrain, reinforcing their role as a dependable contractor for on-the-ground forest stewardship.

Key Performance Metrics

Awards Count

114

All time

Active

0

Currently performing

Completed

114

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with BRUSH ONE CONTRACTING

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for BRUSH ONE CONTRACTING

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in BRUSH ONE CONTRACTING's top NAICS codes and agencies

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 115310
New
SLED
Inchelium Forestry, Pre-Commercial thinning fall 2026, Gold Mt. 156
Solicitation # InchThinning2026.pdf
The Confederated Tribes of the Colville Reservation, through Colville Tribal Forestry, is soliciting proposals for pre-commercial thinning and mastication services for the Gold Mt. 156 project area, totaling 52 acres. The contractor is responsible for providing all labor, equipment, supervision, and safety measures to execute thinning based on tree vigor and species preference. Technical specifications include strict guidelines on stump height, slash treatment, and the preservation of trees with a diameter at breast height of 8 inches or greater, unless otherwise marked. Compliance is monitored by a Contracting Officer's Representative who performs inspections to identify missed cuts or problem areas. Bids must be submitted in sealed envelopes to the Inchelium Forestry Office by 4:30 P.M. on October 21, 2026. Required submission documents include an updated SAM.gov registration, proof of insurance, a completed work plan, and a debarment certification. The contract emphasizes Indian preference, requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin and the submission of a TERO compliance and utilization plan. Payment is structured with 80 percent of each completed pay item paid within ten working days of final approval, while 20 percent is withheld until all contract requirements are satisfactorily completed.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 13 hours
View Details
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details
NAICS: 115310
New
SLED
San Poil Forest stocking Survey 2027
Solicitation # StockingSurvey2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for five stocking survey contracts (SP-01-SSUR-27 through SP-05-SSUR-27) to be performed on the Colville Indian Reservation. The scope of work covers approximately 1,443 acres and 2,241 plots across the .30 mile, Swawilla, Summit North, and Williams Flats areas. Contractors are required to conduct survival and stocking surveys, submitting a detailed work plan that includes estimated daily acreage and completion schedules. Performance is measured by a Contract Officer's Representative (COR) who inspects at least 20 percent of plots; an accuracy rate of 85 percent or greater is required for acceptance, while full payment is tied to an accuracy rate of 95 percent and above. A 20 percent holdback will be withheld from all payments until all contract requirements are fulfilled. Award evaluations are based on technical qualifications and price reasonableness, with a strong preference given to certified Indian preference eligible firms. Bidders must submit a comprehensive packet including a Debarment Form, Title ID Certification, Bid Evaluation Form, and a TERO Compliance and Utilization Form. Additionally, contractors must provide liability insurance and adhere to tribal Occupational Safety Health Administration (IOSHA) standards. Those utilizing subcontractors or employees must submit a contracting and training plan to the TERO office. Failure to meet quality standards requires the contractor to rework the affected unit at no cost to the Tribe within two days of notification.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four pre-commercial thinning contracts in the 21 Mile area. The project encompasses a total of 120.1 acres divided into four units: Unit A (56.3 acres), Unit B (38.4 acres), Unit C (41.5 acres), and Unit D (40.2 acres). The scope of work requires the identification and maintenance of crop trees while removing competing vegetation, adhering to strict specifications such as stump heights of less than five inches and the protection of boundary trees marked with orange or yellow stripes. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by October 29, 2026, at 4:00 P.M., with electronic submissions prohibited. Applicants must be registered in SAM.gov and possess a valid Trader License. The award process strongly prioritizes certified Indian preference firms, and contractors must ensure that at least 51 percent of their seasonal or project-based workforce is of Indian preference origin. Technical qualifications and reasonable pricing are key evaluation factors, and the Colville Tribal Forestry reserves the right to reject any bid. Contract administration includes oversight by a designated Contract Officer's Representative who will perform quality inspections. Payment is based on completed and accepted acreage, with 20 percent of each payment withheld until final approval and site cleanup are completed. Contractors must provide liability insurance and comply with the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. Additional requirements include TERO certification to avoid specific fees and the submission of a comprehensive employment and training plan.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP 2027022 is a unit price solicitation issued by the Spartanburg County Government for the Tier 3 Subdivision Reclamation project focusing on Group 1, specifically the Timberlake and Wicklow areas in South Carolina. The scope of work involves road reclamation and paving, with core requirements including the installation of 2 inch Surface C and 8 inch CMRB Method B, as well as the application of temporary and thermoplastic pavement markings. Technical specifications require the use of a sloped edge longitudinal shoulder joint attachment per SCDOT Standard 401.3.19.2, with devices sourced from Qualified Products List 75. Additional project components include 8 inch full depth patching, removal and disposal of existing asphalt pavement for driveway tie-ins, maintenance stone, and as-needed wrecker services. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain minimum insurance coverage, including 1 million dollars in general liability, and certify compliance with the Federal Civil Rights Act, the Americans with Disabilities Act, and the Drug Free Workplace Act. Proposals must remain valid for 60 days following the opening date. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments. All work must adhere to industry standards and SCDOT specifications, and the contract is subject to appropriation by the county.
Spartanburg County Government

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
2026-40 Capital Connector Construction Project
Solicitation # 2026-40
The City of Charleston, West Virginia, is soliciting bids for the Capital Connector Project, a multimodal corridor improvement initiative funded by a federal RAISE grant. The project aims to transform the Kanawha Boulevard Bike and Walkway corridor into a complete street, encompassing approximately 3.25 miles of improvements along Kanawha Boulevard East (US Route 60) from Magic Island to the 35th Street Bridge, as well as 0.25 miles of safety upgrades on Greenbrier Street. Key deliverables include lane reductions, protected intersection improvements, signal modifications, the installation of bioswale systems, and the widening of shared-use paths. All work must adhere to 2023 WVDOH Standard Specifications, ADA Section 504, PROWAG standards, and the Build America Act and Buy America requirements. Eligible bidders must be listed on the West Virginia Division of Highways' Prequalified Contractors List and must not be delinquent in Business and Occupation taxes or owe more than 1,000 dollars to the state or its political subdivisions. The contract will be awarded to the lowest responsive and responsible bidder, with a performance period of 548 calendar days from the Notice to Proceed. Bids must be submitted electronically via BidExpress by December 3, 2026, and must include a bid bond for 5 percent of the total amount. Successful vendors are required to provide performance and labor/material payment bonds for 100 percent of the contract value, maintain commercial general liability insurance of at least 1,000,000 dollars per occurrence, and comply with Davis-Bacon prevailing wage standards.
City of Charleston

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 115310
New
SLED
Telogia Creek Sand Pine Removal
Solicitation # FWC 26/27-15
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for sand pine regeneration removal services covering approximately 797 acres at various locations within the Telogia Creek WMA in Liberty County, Florida. The project requires the removal of sand pines using hand pulling as the primary method, which is mandatory for pines with a stem diameter of less than one half inch. For larger pines, saws must cut below the lowest live branches, preferably at or slightly above ground level. All treated pines must be left where they are cut or pulled rather than piled, and the vendor is responsible for ensuring that surrounding non-target trees, such as Long Leaf Pines, remain upright. Upon completion, all trash and debris must be removed from the site. The contract will be awarded to the responsive and responsible bidder offering the lowest total price, calculated as the summed cost per acre across light, moderate, and heavy sand pine presence levels. The initial term is for one year upon issuance of the Purchase Order, with the Commission holding the option to renew the contract annually for up to two additional years. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and must submit their bids in a sealed envelope by the deadline of October 16, 2026, at 1:00 PM ET. Digital submissions are not accepted. Compliance requirements include the use of the U.S. Department of Homeland Security E-Verify system, adherence to federal safety requirements, and cooperation with the Inspector General. Awarded vendors must provide proof of automobile, public liability, and property damage insurance, as well as worker's compensation if they employ more than four people. Payment will be issued via electronic invoices processed in accordance with Florida Statutes, subject to a transaction fee for registered vendors. Performance will be verified by a Project Manager using GPS and GIS software, with payments deducted for any areas that do not meet the specified removal and site maintenance standards.
Florida Fish and Wildlife Conservation Commission

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a firm-fixed-price construction contract issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. The project requires the contractor to provide all necessary equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The estimated magnitude of construction is between $25,000 and $100,000, with a period of performance of 210 calendar days from the receipt of the notice to proceed. Work is restricted to Monday through Friday, from 7:00 AM to 3:30 PM. This procurement is a total set-aside for small business vendors under NAICS code 237310. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit comprehensive documentation covering technical capabilities, price, and past performance from the last three years. Key safety requirements include strict adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer Designation Letter within 21 days of the notice to proceed. No field work may begin until these pre-construction submittals are accepted. Award will be granted to the responsible vendor whose quotation is most advantageous to the government based on a comparative evaluation of price and technical factors.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Solano State Route 12 Pavement Preservation (04-0AA53)
Solicitation # 04-0AA53
The Solano State Route 12 Pavement Preservation project (EA 04-0AA53) is a Caltrans District 4 initiative located in Solano County, California, spanning State Route 12 between postmiles 14.10 and 20.68. With a total programmed cost of approximately 37.388 million dollars, the project focuses on comprehensive roadway improvements including pavement dig-outs, cold planing, asphalt concrete overlay, and the installation of AC dikes. Additional scope elements include shoulder widening, drainage improvements, the upgrade of metal beam guardrails, traffic signing panel updates, and the installation of centerline and shoulder rumble strips and pavement delineation. The project is governed by the 2025 Caltrans Standard Specifications, with specific requirements for job site management and the handling of hazardous waste and contamination. Environmental compliance is a primary focus, as evidenced by a Mitigated Negative Declaration under CEQA and the requirement for various permits, including a 1602 Lake and Streambed Alteration Agreement and a Section 401 Clean Water Act Permit. Strict protocols are in place for the delineation of Environmentally Sensitive Areas using high-visibility markings and the implementation of biological inspection measures for pipes, culverts, and open trenches. The project also adheres to Title VI of the Civil Rights Act and the Americans with Disabilities Act to ensure non-discrimination and accessibility.
Caltrans, District 4 - Bay Area/Oakland

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
CONSTRUCTION ON STATE HIGHWAY IN SANTA CRUZ COUNTY 0.1 MILE SOUTH OF SARATOGA TOLL ROAD AT THE SAN LORENZO RIVER
Solicitation # 05-1K9014
The California State Department of Transportation (CalTrans) is soliciting bids for contract 05-1K9014 to construct a bridge structure for fish passage restoration on State Highway Route 9 in Santa Cruz County. Located 0.1 mile south of Saratoga Toll Road at the San Lorenzo River, the project involves the construction of the northbound bridge and pavement sections, the implementation of reversing traffic for vehicles and bikes, and the relocation of AT&T underground fiber to an overhead position. All work must adhere to 2025 Standard Specifications and Standard Plans, with project plans approved as of May 4, 2026. The contract is awarded on a unit price basis, with specific line items including concrete barriers, thermoplastic traffic striping, and asphalt concrete rumble strips. The project mandates strict adherence to environmental work windows for creek activities and requires a full-time, on-site Safety Quality Control Manager. Quality standards include a welding QC plan, specific test sample lengths for reinforcing steel, and compliance with the RWQCB basin plan for local materials. Contractors must comply with Buy America/Build America requirements and pay the higher of either the U.S. Secretary of Labor or the California Department of Industrial Relations prevailing wage rates. Additional requirements include the submission of DVBE quotes and certificates of reported compliance for off-road diesel-fueled vehicles. Bids are due by December 3, 2026, and contractors must provide a 72-hour notice before starting job site activities.
California State Department of Transportation (CalTrans)

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details