Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Burton Construction, Inc. 3915 E. Nebraska Ave. SPOKANE WA 99217 USA

UEI: SLED_097FD2A52B7CA519

Burton Construction, Inc. 3915 E. Nebraska Ave. SPOKANE WA 99217 USA is a federal contractor, registered under UEI SLED_097FD2A52B7CA519. It has been awarded $10,000,000 in federal contracts. Primary work spans Commercial and Institutional Building Construction. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_097FD2A52B7CA519

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Burton Construction, Inc. provides commercial and institutional building construction services. The company has experience supporting the Department of the Interior. Their primary industry focus is within the commercial and institutional building construction sector.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

1

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency

Department Of The Interior is the largest, at $10.0M, 100.0% of the total.

Awards by NAICS

236220 - Commercial and Institutional Building Construction is the largest, at $10.0M, 100.0% of the total.

Awards by Agency Over Time
Awards by Type Over Time
Award Size Distribution
Awards by Place of Performance

Compete with Burton Construction, Inc. 3915 E. Nebraska Ave. SPOKANE WA 99217 USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for Burton Construction, Inc. 3915 E. Nebraska Ave. SPOKANE WA 99217 USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS

Open opportunities in Burton Construction, Inc. 3915 E. Nebraska Ave. SPOKANE WA 99217 USA's top NAICS codes and agencies

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
This Design-Build Major Maintenance and Repair (M&R) project for US Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin, is a firm fixed-price task order issued under the NMACC III IDIQ. The project is estimated between $5 million and $10 million with a projected period of performance of 350 calendar days. The scope of work includes base requirements for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional work items for roof and boiler replacement at the Station/UPH Building. Technical requirements encompass architectural remodels of the first and second floors, electrical power and lighting updates, fire alarm system installation, and mechanical demolition and installation compliant with International Building and Plumbing Codes. The contract is awarded to the lowest total priced responsive offeror, with proposals due by December 17, 2026. Key administrative requirements include the submission of performance and payment bonds within ten business days of award and adherence to the Davis-Bacon Act wage determinations for the Milwaukee area. Due to the nature of the facility, contractors must comply with strict physical security and force protection programs, including valid security clearances for personnel handling classified information and restrictions on portable electronic devices in classified work spaces. All invoicing must be processed through the Invoice Processing Platform.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with composite modular materials and carpet tiles, fully renovating restrooms with new lavatories and vanities, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation equipment, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting interior surfaces and installing new signage throughout the facility. This solicitation, number 70LGLY27RSSB00001, is a total small business set-aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by December 2, 2026, and must be submitted electronically to the Contracting Officer. Award evaluation is based on price, past performance, and corporate relevant experience, with non-cost factors holding equal importance to price. The contractor is required to provide performance and payment bonds and must adhere to the Davis-Bacon Act and ADA accessibility guidelines.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope repairs, new roofing, exterior wall systems, and interior reconfiguration. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project involves site improvements such as paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The estimated contract value is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary line items: ELIN 0001 for building renovation and ELIN 0002 for the removal and replacement of paving. Proposals are due by December 2, 2026, and the award will be based on the lowest price. Bond requirements vary by proposal value, with those exceeding $150,000 requiring bid, payment, and performance bonds. Key personnel requirements include a stand-alone Quality Control Manager, while the Superintendent and Site Safety and Health Officer roles may be combined if the individual is qualified for both. The contract mandates compliance with ADA/ABA accessibility guidelines, OSHA safety requirements, and the Davis-Bacon Act. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work involves addressing Risk Assessment Code Level 4 (RAC-4) deficiencies, specifically extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials, labor, supervision, and performance testing for a complete and usable system. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm-Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the award of the task order. Award selection is based on price and MACC past performance. Key requirements include adherence to Unified Facilities Guide Specifications (UFGS), cybersecurity standards per UFC 4-010-06, and strict hazardous material labeling and disposal protocols. Proposals must be submitted via the PIEE portal, with a final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between $10 million and $25 million. The scope involves a critical two-phase execution where the facility must remain operational and mission-capable between phases, requiring strict scheduling and multiple mobilization and demobilization cycles. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of all design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. Additional work includes demolition, HVAC, fire protection, electrical upgrades, and the construction of a 400 square foot addition for forklift battery charging. The contract is awarded based on price and MACC past performance. Key requirements include compliance with EM 385-1-1 safety standards, International Building Code, and various cybersecurity and CMMC Level 1 requirements. The contractor must utilize the Wide Area Workflow (WAWF) system for invoicing and provide electronic Davis-Bacon Act certified payrolls. Performance and payment bonds are required, and the project involves a multi-stage inspection process including preliminary, acceptance, and final inspections. Proposals are to be submitted via the PIEE portal, with the final deadline for submission specified as December 7, 2026, at 11:00 am local time.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is designated as a Small Business set-aside, including SBA certified VOSB, SDVOSB, WOSB, and HUBZone SB. The scope involves replacing a roof with persistent leaks, requiring the contractor to perform a visual inspection and adhere to national, state, and local building codes, as well as EPA and OSHA regulations. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM, and proposals must be submitted to Tammy Swallows by December 14, 2026. The contract is a single lump sum award based on best value, evaluated through a 100-point system focusing on price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include a valid Indiana Contractor's License, Davis-Bacon Act wage rate certification, and specific insurance coverages, including automobile liability and workers' compensation. Once a Notice to Proceed is issued, the contractor must provide a sequenced construction schedule within 10 days and begin work within 14 days. The project includes a one-year workmanship guarantee and a two-year manufacturer's product warranty, with payment terms set at Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for a single lump sum contract to remove and replace damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with local, state, and federal building codes, while reusing existing push bars and closure systems. All work must adhere to current EPA and OSHA regulations, and the contractor must provide a one-year guarantee of workmanship and manufacturer product warranties. The contract is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is required on December 1, 2026, and proposals are due by December 11, 2026. Award will be based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must provide a detailed cost breakdown, a timeline for substantial completion, proof of a valid Indiana Contractor's License, and a W9. Insurance requirements include automobile liability and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must start work within 14 days of proposal acceptance.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
International
Taber and District Housing Foundation - Request for Proposal - Clearview Lodge Development at the Meadows
Solicitation # AB-2026-07781
The Taber and District Housing Foundation is seeking an experienced Construction Manager to lead the development of a new senior housing facility in Taber, Alberta, located within the Meadows Development. The project involves the construction of a building of approximately 68,000 square feet on 4.05 acres of serviced land, featuring 88 units including studio suites, bariatric units, and one-bedroom units. The project is currently in the preliminary design stage with a construction budget of $26 million. The contract will be executed using the CCDC 5B – 2025 Construction Management Contract for Services and Construction, and the Owner intends to preserve opportunities for future building expansion on the site. The selected Construction Manager will be responsible for the entire project lifecycle, including pre-construction services, construction execution, and closeout. Key responsibilities include establishing project control systems for budget and risk tracking, providing site supervision, and coordinating all subcontractors and inspections. Mandatory requirements for proponents include proof of Alberta business registration, Commercial General Liability insurance, and a WCB Alberta Certificate of Clearance. Award selection is based on the best overall value, evaluating the proponent's approach, capabilities, and schedule, alongside a price score. Required security measures include a performance bond of at least 50% of the budgeted capital costs and a labor and material payment bond.
Taber and District Housing Foundation

POSTED

about 18 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
SLED
Police Department G.J.I.P. Office Remodel
Solicitation # JN 566
The City of Gardena is soliciting bids for the Police Department G.J.I.P. Office Remodel, which involves the conversion of an existing 1,013 square foot dental clinic into a government office for juvenile justice and intervention programs. The scope of work includes a total interior addition of 59 square feet, the creation of four offices, a conference room, a lobby, a coffee counter with a sink, and two restrooms, one of which must be ADA compliant. Exterior improvements include a new accessible ramp, new stairs for the main entry, and a designated accessible parking space. The project requires hazardous materials testing prior to renovation and must adhere to the 2024 edition of the Standard Specification for Public Works Construction (Greenbook). The contract will be awarded to the lowest responsive and responsible bidder, with a performance period of 120 working days. Bidders must provide a bid bond, and the successful contractor is required to furnish performance and payment bonds for 100 percent of the contract price, along with a Workers’ Compensation Insurance Certificate. As a public work under the California Labor Code, the project requires the payment of prevailing wages. Payment terms are typically 30 days from the submission of an approved invoice, with strict requirements for certified payrolls and approved change orders. There is no specified set-aside status for this solicitation.
City of Gardena

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details