Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Modify Transfer Facility NBK Bangor

Open
N44255-25-R-1502State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This Design-Build project involves the renovation and modernization of Facility #6594 (Transfer Facility) at SWFPAC Bangor, Washington, with an estimated project magnitude between $10 million and $25 million. The scope of work includes the demolition and replacement of deteriorated components and the construction of an approximately 400 square foot addition for forklift battery charging operations. A critical operational constraint requires the facility to remain mission-capable throughout the project, necessitating a two-phase construction approach with multiple mobilization and demobilization cycles. Phase 1 encompasses all primary renovation work and the completion of design documents for both phases, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract is awarded based on price and MACC past performance, with a strict performance schedule requiring work to commence within 15 calendar days of award. The Base Bid (CLIN 0001) must be completed within 360 calendar days, and the Option (CLIN 0002) within 1082 calendar days, with liquidated damages applied for delays. Key requirements include compliance with the Davis-Bacon Act for certified payrolls, strict cybersecurity standards (NIST SP 800-171), and the provision of performance and payment bonds. Acceptance is contingent upon joint preliminary inspections and specialized testing for sound attenuation and electronic security systems.

General Info

Design-build renovation of Facility #6594 at SWFPAC Bangor in two construction phases.

Place of Performance

Building 6594, Bangor, WA, USA

Set-Aside

NONE

Documents

10
PDF, High priority: read this firstamendment
High
DOCX, High priority: read this first1 page · amendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this first1 page · rfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfp
High
DOCX, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBristol - Temecula → Bristol Alliance of Companies
Contacts1 person available
OfficeN/A

Full Description

Show more
PROJECT DESCRIPTION This Design-Build Statement of Work (SOW) outlines a critical two-phase renovation and modernization of Facility #6594 (Transfer Facility, Bangor). A critical constraint is that the facility must remain operational and mission-capable between Phase 1 and Phase 2, necessitating strict scheduling, specialized security protocols, and multiple mobilization/demobilization cycles. CONSTRUCTION PHASING REQUIREMENTS Construction phasing requirements include mobilization and demobilization. Mobilization and demobilization require special planning due to the two phases of the project which will require the construction contractor to mobilize and demobilize. Contractor must stop working for extended periods of time for operational reasons requiring mobilizing and demobilizing more than once. The design for Phase 1 and Phase 2 must be completed and approved during Phase 1. A/E must provide all-construction documents for both phases during Phase 1 that clearly identifies the work that must be accomplished during each phase for acceptance by Naval Facilities Engineering Command (NAVFAC) and Strategic Weapons Facility Pacific (SWFPAC). Where appropriate infrastructure such as transformers, switch gear, floor loading, Heating, Ventilation, and Air Conditioning (HVAC) sizing that will be provided in the first phase must be sized and provided to support the operations of Phase 1 and Phase 2. Phase 1 includes everything not in Phase 2. General Description Phase 2: Phase 2 expands upon the efforts from Phase 1 by providing installation of new building equipment. Phase 2 also must include special costs for those items that are inherent in executing the construction project but do not result in physical features for the end-product (e.g., temporary lay-down area for staging construction material). All efforts listed below as part of Phase 2 are planned as stand-alone and will result in a complete and usable facility at the completion of the individual phase. • Disassemble and removal one existing 40-ton bridge crane.(BY Navy Crane Center) • Replace the existing crane and connect to local power supply.(BY Navy Crane Center) • Provide a prefabricated paint booth will be installed in the High Bay area. Connect the paint booth to power, the air dryers and filters at point of use to support life safety and ventilation requirements. All efforts listed above as part of Phase 2 must be planned during Phase 1 as stand-alone and will result in a complete and usable facility at the completion of the individual phase.
Pre-bid meeting (optional): 11-12-2026 12:00 PM (PT)

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, encompassing selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the contractor will perform hazardous materials abatement and site improvements, including paving, drainage, and water, sanitary, and storm system repairs. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, bonding requirements range from a payment bond for projects over 35 thousand dollars to a combination of bid, payment, and performance bonds for projects exceeding 150 thousand dollars. The work must adhere to the Davis-Bacon Act, ADA accessibility guidelines, and specific military and industry standards for piping and materials.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore dormitory rooms, hallways, offices, and conference rooms to their original condition. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. Award will be based on best value, with evaluation weights assigned to price (60%), quality (20%), past performance (10%), and schedule (10%). Bidders must be small businesses or certified SBA categories and must provide a valid Massachusetts Contractor's License, a detailed cost breakdown, and a minimum 90-day bid guarantee. Compliance with ADA, OSHA, EPA, and NFPA-101 life safety codes is mandatory, and contractors must adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to restore water-damaged interior spaces, including sixteen residential rooms, bathrooms, and common areas, to return them to safe residential use. Key technical requirements include the restoration of approximately 300 square feet of floor area in mechanical rooms involving drywall installation, joint finishing, and painting. The contractor is responsible for all labor, materials, equipment, and supervision, as well as the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. A minimum one-year workmanship warranty is required upon final acceptance. This solicitation is set aside for Small Businesses and various SBA-certified categories. Proposals must include detailed relevant experience, a comprehensive description of the proposed work methods—including project phasing and occupied-building protection—and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value within ten days of award, along with proof of liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate. Pricing submitted in proposals must remain firm for at least 60 calendar days.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Bristol - Temecula → Bristol Alliance of Companies

Same awarding agency

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a Firm Fixed Price design-build project for fueling system repairs at the W.H. Ford Regional Training Center in Greenville, Kentucky. The scope of work involves comprehensive upgrades and maintenance, including upgrading tank automatic tank gauges, repairing dispenser and offload island concrete, installing emergency fuel shut-off systems, and mounting leak detector probes. Additional requirements include providing concrete and asphalt circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing tank vents and roof penetration boot seals, and improving grounding for diesel tanks and stairs. The project also requires modifying tank access platforms and providing dead man controls for truck loading. The period of performance is 410 calendar days, with work commencing within 10 days of the Notice to Proceed and a final delivery date of June 18, 2027. Proposals are evaluated using the Lowest Price Technically Acceptable (LPTA) method, focusing on relevant experience, a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined construction methodology. Submissions must be divided into a technical volume and a separate price volume. All work must adhere to strict safety and technical standards, including EM 385-1-1, NFPA 30, and UFC 3/460/0, and comply with Davis-Bacon Act wage determinations and cybersecurity requirements.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS