Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

CITY OF ATWATER

UEI: FFMEDABPXQM7CAGE: 4BRE9

CITY OF ATWATER is a federal contractor, registered under UEI FFMEDABPXQM7 and CAGE code 4BRE9. It has been awarded $33,988,936 in federal contracts. Primary work spans Unknown NAICS, Sewage Treatment Facilities, and Water Supply and Irrigation Systems. Top awarding agencies include Department Of Justice, Department Of Transportation (dot), and Environmental Protection Agency.

Contact Information

Registration and classification details

Registration

UEI Code

FFMEDABPXQM7

CAGE Code

4BRE9

Entity Structure

U.S. Government Entity

Established

N/A

Business Classifications

Planning CommissionCityMunicipalityU.S Local Government

NAICS Codes

562111Solid Waste Collection
624110Child and Youth Services
712120Historical Sites
721214Recreational and Vacation Camps (except Campgrounds)
921120Legislative Bodies(Primary)
+9 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

The City of Atwater provides municipal water supply and irrigation system services, leveraging local public infrastructure expertise to deliver reliable water distribution and management solutions. Their core capabilities center on the operation, maintenance, and system optimization of potable water...

The City of Atwater provides municipal water supply and irrigation system services, leveraging local public infrastructure expertise to deliver reliable water distribution and management solutions. Their core capabilities center on the operation, maintenance, and system optimization of potable water networks and agricultural irrigation infrastructure, with technical proficiency in pipeline integrity, pump station control systems, water metering, and compliance with state and federal drinking water standards. As a municipal entity, their specializations include community-based water resource planning, stormwater integration, and long-term infrastructure resilience planning tailored to arid regional conditions. Their approach emphasizes public accountability, operational continuity, and adherence to environmental regulatory frameworks. The City of Atwater has delivered water services under contract with the Department of Justice, indicating experience supporting federal facilities or correctional institutions requiring dedicated water infrastructure. This relationship suggests capacity to meet stringent federal operational and safety requirements for utility services in secure or sensitive environments, though no other agency partnerships are evident in the award history. Their primary industry focus is on Water Supply and Irrigation Systems (NAICS 221310), placing them squarely in the public utilities sector with expertise in potable water delivery, distribution network maintenance, and irrigation system design for both municipal and institutional use. They position themselves as a localized provider of essential water infrastructure services, with a niche in serving government-owned or federally operated sites requiring reliable, municipally managed utility support. As a municipal government entity (Entity Structure 2A), the City of Atwater operates under public governance with no federal certifications such as 8(a), HUBZone, or SDVOSB. Their geographic presence is anchored in Atwater, California, where they manage local water resources and extend services to federal partners when contracted. Their market positioning reflects a community-based utility provider with proven capacity to deliver critical infrastructure services to federal agencies under formal procurement agreements.

Key Performance Metrics

Awards Count

120

All time

Active

1

Currently performing

Completed

119

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with CITY OF ATWATER

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for CITY OF ATWATER

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in CITY OF ATWATER's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and infrastructure requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project requires the rehabilitation of reactor mixers and aerators, replacement of motor control center components, and the installation or improvement of electrical and instrumentation systems. Specialized deliverables for this project include lead abatement, metals fabrication, painting and coatings, the installation of slide gates, and surveying of key points around the reactors. This solicitation is specifically targeting Small Business, Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified subcontractors, as well as DBE, MBE, WBE, and SBE firms. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with two smaller units, installing a standby generator, and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Electrical deliverables include new Southern California Edison services. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A; K-27-2470-DBB-3-C
Solicitation # BP26019
The City of San Diego's Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A (K-27-2470-DBB-3-C) is a construction project with an estimated cost of 35.1 million dollars. The scope of work is divided into two primary components: the installation of approximately 5,216 linear feet of new sewer pipe, including groundwater dewatering, bypass pumping, and trenchless work, and the replacement of approximately 5,886 linear feet of existing 6, 8, 12, and 16 inch AC water mains and associated appurtenances. Additional requirements include infrastructure restoration such as repaving, signal loop replacement, curb ramp installation, and the revegetation of affected areas. The total contract time for completion is 550 working days, which includes a 120-day plant establishment period followed by a 25-month long term maintenance and monitoring agreement. To be eligible for award, prime contractors must possess licensing classification A and submit a Letter of Assent and a Jobs Coordinator Designation Form. This is a prevailing wage project subject to a Citywide Project Labor Agreement. Bidders must demonstrate Good Faith Efforts regarding Disadvantaged Business Enterprise participation and provide documentation in searchable PDF format. Bids are considered non-responsive if the bidder fails to attend the pre-bid meeting or provide the required GFE documentation. The solicitation is managed by Burtech Pipeline Incorporated, with proposals due by October 26, 2026, ahead of the City's October 28, 2026, deadline.
BURTECH PIPELIINE INCORPORATED

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details