Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

COPPER RIVER INFRASTRUCTURE SERVICES LLC

UEI: KEA5BTBXFEP3CAGE: 8V2E4

COPPER RIVER INFRASTRUCTURE SERVICES LLC is a federal contractor, registered under UEI KEA5BTBXFEP3 and CAGE code 8V2E4. It has been awarded $864,980 across 6 federal contracts. Primary work spans Highway, Street, and Bridge Construction and Commercial and Institutional Building Construction. Top awarding agencies include Department Of Defense and General Services Administration.

Contact Information

Registration and classification details

Registration

UEI Code

KEA5BTBXFEP3

CAGE Code

8V2E4

Entity Structure

Corporate Entity (Tax Exempt)

Established

N/A

Business Classifications

Tribally Owned FirmMinority-Owned BusinessSelf Certified Small Disadvantaged BusinessFor Profit OrganizationLimited Liability CompanyNative American Owned

NAICS Codes

236210Industrial Building Construction
236220Commercial and Institutional Building Construction
237110Water and Sewer Line and Related Structures Construction
237130Power and Communication Line and Related Structures Construction
237310Highway, Street, and Bridge Construction
+11 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Copper River Infrastructure Services LLC specializes in the construction and maintenance of critical public infrastructure, with demonstrated expertise in highway, street, and bridge construction as well as commercial and institutional building projects. The company delivers precision execution for ...

Copper River Infrastructure Services LLC specializes in the construction and maintenance of critical public infrastructure, with demonstrated expertise in highway, street, and bridge construction as well as commercial and institutional building projects. The company delivers precision execution for complex civil works, including dam maintenance, structural repairs, and extended performance modifications on federally funded assets. Their technical capabilities encompass civil engineering support, heavy construction methodologies, and long-term facility sustainment under stringent federal compliance standards, with a focus on durability, safety, and regulatory adherence in high-traffic and mission-critical environments. The contractor has established direct relationships with the Department of Defense and the General Services Administration, delivering infrastructure services that support national defense readiness and federal facility operations. For the DoD, they have executed maintenance tasks on critical water retention structures such as the Bear Creek/Chatfield Dam, indicating proficiency in hydraulic infrastructure and dam safety protocols. With GSA, they have supported the extension of performance periods for commercial and institutional building projects, suggesting experience in managing multi-phase construction timelines, contract modifications, and federal property lifecycle management. Their primary industry focus lies in NAICS 237310 (highway, street, and bridge construction) and NAICS 236220 (commercial and institutional building construction), positioning them as a niche provider of civil infrastructure and facility sustainment services. They operate in the federal construction market with an emphasis on mission-critical public works, serving agencies that require robust, code-compliant construction and long-term maintenance solutions. Copper River Infrastructure Services LLC is structured as an 8H entity and is headquartered in Denver, Colorado. While no formal government certifications are listed, their contract history reflects consistent engagement with federal agencies on technically demanding projects, indicating operational maturity and reliability in the federal construction sector. Their geographic presence supports regional and national infrastructure demands, with a focus on delivering resilient, mission-aligned construction outcomes.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$733.5K84.8%
General Services Administration$131.5K15.2%
Awards by NAICS
237310 - Highway, Street, and Bridge Construction$771.1K89.1%
236220 - Commercial and Institutional Building Construction$93.9K10.9%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in COPPER RIVER INFRASTRUCTURE SERVICES LLC's top NAICS codes and agencies

NAICS: 237310
New
International
Kneehill County - Invitation to Bid - 2511-02170-00 - 2026 Kneehill County Bridge Maintenance Tender
Solicitation # AB-2026-05509
Kneehill County is soliciting bids for a comprehensive bridge maintenance project under tender AB-2026-05509, with proposals due by August 20, 2026. The scope of work encompasses a wide range of structural and protective repairs including partial depth concrete repairs, guardrail and bridgerail restoration, deck joint replacement, drain trough backfill and repair, securement of pier nose plates, banding of piles, sheathing repairs, placement of Class 2 heavy rock rip rap, grinding of truss members, replacement of caps and corbels, erosion control measures, timber block replacement, and the addition of sister stringers to reinforce structural integrity. All work must be completed in accordance with county standards and industry best practices for infrastructure longevity and safety. The project is located within Kneehill County, Alberta, and is managed by the county’s engineering team, with Kurt Petrica serving as the primary point of contact for inquiries and technical clarification. Bidders are expected to mobilize efficiently and execute all tasks with precision, addressing both immediate structural concerns and long-term durability. The solicitation is open to qualified contractors capable of handling complex civil infrastructure repairs, and responses must be submitted through the Alberta Purchasing Connection portal prior to the deadline. No set-aside provisions are specified, and all eligible bidders may participate provided they meet the technical and compliance requirements outlined in the tender documentation.
Kneehill County

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe Port of Seattle through its Aviation Project Management Group is forecasting a procurement under NAICS code 236220 for the full design, permitting, and construction services to replace the Checkpoint 5 security grill. The scope encompasses a comprehensive range of activities including site assessment, development of design drawings and technical specifications compliant with TSA CRPG Section 3-5, submission for regulatory review and permit acquisition, demolition and proper disposal of the existing grill, fabrication and installation of the new system, and seamless integration with existing structural, electrical, and security badge access systems. Coordination with all relevant stakeholders is required to ensure adherence to safety and operational standards while minimizing disruption to airport functions. The project is structured under a design-build-bid delivery method and is being managed by the Port of Seattle with primary contact Yanet Maldonado and project manager Collette Deardorff available for inquiries. The solicitation was posted on July 31, 2026, and while no specific award date or set-aside details are provided, the location of performance is tied to the Port of Seattle’s facilities. All work must be executed with strict attention to federal security requirements and operational continuity in a high-traffic aviation environment.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Rental Car Facility (RCF) Customer Service Building (CSB) Re-DemisingThe contract involves a comprehensive renovation and structural upgrade of the Customer Service Building at the Rental Car Facility to prepare for a new concession agreement and tenant construction beginning June 1, 2027. Key improvements include updating wayfinding signage to reflect new tenant layouts, constructing a new break room and flex space to support transit operations, renovating existing restrooms, and replacing outdated car wash equipment in the Quick Turn Around areas. Structural enhancements are also required to address cracking and repair post-tension cables, along with replacing expansion joints on the fifth floor plaza areas to ensure long-term durability and safety. These modifications are designed to modernize the facility and align its infrastructure with future operational needs. The project is managed by the Port of Seattle’s Aviation Project Management Group, with official point of contact Angela Peterson and Project Manager Julia Ruzon overseeing procurement and implementation. The work falls under NAICS code 236220, indicating commercial building construction, and is forecasted with a posted date of July 31, 2026. While no solicitation number or set-aside details are provided, the scope underscores a major capital improvement initiative focused on functionality, tenant readiness, and structural integrity for a high-traffic facility serving airport operations.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The contract is for the construction of two two-story enlisted unaccompanied personnel housing barracks at Eglin Air Force Base, Florida, each designed to accommodate 120 personnel across 32 individual units. Each unit includes a kitchen, dining area, living space, and laundry room, while the buildings are equipped with shared amenities such as lobbies, elevators, entrance vestibules, exercise rooms, day rooms, lounges, and dedicated mechanical, electrical, and communications rooms. The project encompasses extensive sitework including parking lots for vehicles and motorcycles, roadways, concrete sidewalks, grading, a storm sewer system, utilities, landscaping, and incidental related tasks. Additional site amenities feature a large open pavilion, a basketball court, and a volleyball court. The scope of work spans multiple construction disciplines including demolition, sitework, concrete, masonry, steel, millwork, insulation, roofing, waterproofing, doors and hardware, glass and glazing, drywall, flooring, paint, specialties, elevators, plumbing, HVAC, fire protection, electrical, fencing, and asphalt paving. The solicitation is issued by Roy Anderson Corp as the general contractor through an Invitation to Bid, with a submission deadline of August 18, 2026, at 1:00 PM CT. The contract is set aside for small business participation and specifically encourages involvement from Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. Offerors must demonstrate compliance with federal equal opportunity requirements under Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, and are encouraged to engage subcontractors from Minority, Disadvantaged, Women’s, and HUBZone business enterprises. Proposals must include all necessary labor, materials, supervision, and equipment for the assigned scope and must be submitted via email to Patrice Lindman or by fax, with confirmed intent to bid required prior to the deadline.
Roy Anderson Corp

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The project involves significant upgrades to the Water Reclamation Facility’s secondary treatment system, including dewatering and excavating the existing aeration basin to install a new reinforced concrete structure equipped with a flow splitting system, air distribution lines, diffusers, a mixing system, surface waste pumping, and a high flow return pump linking to an adjacent storage pond. Companion infrastructure includes a new blower building housing internal blowers and a dedicated electrical control building, along with a separate carbon feed building containing chemical storage tanks and metering pumps. Additional work entails constructing a below-grade weir flow splitting structure for the secondary clarifiers and relocating a concrete sand filter high flow diversion structure. The contract has a duration of 482 working days with defined intermediate milestones, and participation from disadvantaged, veteran-owned, women-owned, minority, and small businesses is strongly encouraged in alignment with federal and state goals. Funding for this initiative may be partially or fully sourced through the EPA’s WIFIA program, triggering specific compliance requirements outlined in Section 9 of the Special Provisions that contractors and subcontractors must strictly adhere to. The solicitation, issued under NAICS code 236220 for water and wastewater construction, is set aside for small businesses including SDB, WOSB, MBE, and DBE entities as defined by SBA and non-federal certifications. The pre-bid conference was held on January 14, 2026, and all contract documents, including plans, specifications, and proposal forms, are available free of charge via the Town of Windsor’s website after completing a brief registration form. Bids are due by September 3, 2026, and potential bidders must register on BuildingConnected to access the full solicitation materials. Point of contact for inquiries is Anna Stein of C. Overaa & Co.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
NCMT Berth 24-11 Structural Repair
Solicitation # ncmt-berth-24-11-structural-repair-0
The contract entails the comprehensive rehabilitation of the existing concrete marginal wharf at National City Marine Terminal Berth 24-11 in San Diego, California, along with the reinstallation of the shore power system, as detailed in the contract drawings and specifications. The scope of work encompasses a wide array of specialized services including demolition, asbestos and lead abatement, contaminated soil removal, concrete coring and saw cutting, underwater pile jackets, diving operations, environmental monitoring, LIDAR surveying, materials testing, and utility work for storm drain, electrical, and water systems. Multiple subcontracted activities are required, reflecting the complexity and technical nature of the project, with significant emphasis on environmental compliance, safety, and structural integrity. The project is being procured by the San Diego Unified Port District, with Kiewit Infrastructure West Co. serving as the prime contractor responsible for managing subcontractors and ensuring all work adheres to the referenced plans and specifications, which are available for review upon request. Bidders and subcontractors must satisfy stringent eligibility requirements, including possessing a valid California Contractor’s License, being registered with the Department of Industrial Relations, and providing acceptable insurance coverage. Subcontractors and material suppliers performing onsite work must be signatory to collective bargaining agreements with carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters, in compliance with the Project Labor Agreement. Additionally, 100% bonding is mandatory for responsible subcontractors and material contractors, with Kiewit agreeing to reimburse bond premiums. The solicitation prioritizes participation from Disadvantaged Business Enterprises, Disadvantaged Veteran Business Enterprises, Minority Business Enterprises, and Woman Business Enterprises, requiring certification through recognized programs such as the SBA, USDOT’s DBE program, WBENC, or NMSDC. All proposals must be submitted via the BuildingConnected system, with a strict deadline of August 6, 2026, at 2:00 p.m. Failure to meet any of the pass/fail gates—license, DIR registration, insurance, or labor harmony—will render a bidder non-responsive. The contract does not specify total value, payment terms, or period of performance, but places significant administrative emphasis on compliance, socioeconomic participation, and labor standards.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237310
New
SLED
STATE LET MAINTENANCE CONTRACT, BLANCO CO, HOT-MIX COLD-LAID
Solicitation # 6496-52-001_0926
The Texas Department of Transportation is soliciting bids for a state maintenance contract to perform hot-mix cold-laid pavement work on US-281 in Blanco County, with an estimated contract value of $2,782,000.00 and a performance period of 365 calendar days. The solicitation, identified by control number 6496-52-001_0926, was posted on August 5, 2026, and bids are due by 1:00 p.m. on September 2, 2026, with all submissions required through the Electronic State Business Daily and Electronic Bidding System. The project is classified as a waived project, with proposals issued only to prequalified contractors, and no small business participation goal is established. Performance is to occur exclusively along the designated highway corridor in Blanco County, and acceptance of work will be carried out by TxDOT personnel at the project site. A performance guarantee of $56,000 is required to ensure contractual compliance. The contract is administered by TxDOT’s Austin District, with payment processed through the agency’s headquarters, and agency accounting data includes an AAC code of 601 and project number MMC-A00219443. While no detailed technical specifications, packaging requirements, inspection criteria, or evaluation factors are provided in the available documentation, compliance with TxDOT’s standard construction and maintenance specifications for hot-mix cold-laid asphalt is implied. The solicitation does not include a breakdown of line items, FOB terms, or information on contract type such as FFP or IDIQ, and no FAR clauses, representations, or certifications are accessible in the provided materials. Contractors must rely on official addenda and portal-based documentation for full technical, administrative, and submission requirements.
Texas Department of Transportation

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details