Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

CORNERSTONE MAVERICK

UEI: PN6PKU73YH26

CORNERSTONE MAVERICK is a federal contractor, registered under UEI PN6PKU73YH26. It has been awarded $1,050,994 across 10 federal contracts. Primary work spans Commercial and Institutional Building Construction, Other Heavy and Civil Engineering Construction, and Electrical Contractors and Other Wiring Installation Contractors. Top awarding agencies include Department Of Transportation.

Contact Information

Registration and classification details

Registration

UEI Code

PN6PKU73YH26

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Transportation$1.1M100%
Awards by NAICS
236220 - Commercial and Institutional Building Construction$327.9K31.2%
237990 - Other Heavy and Civil Engineering Construction$266.7K25.4%
238210 - Electrical Contractors and Other Wiring Installation Contractors$160.3K15.3%
238160 - Roofing Contractors$139.0K13.2%
423610 - Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers$94.7K9%
238190 - Other Foundation, Structure, and Building Exterior Contractors$62.4K5.9%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in CORNERSTONE MAVERICK's top NAICS codes and agencies

NAICS: 238190
New
International
Special Areas Board - Request for Proposal - RE9247 - Contract Services for Cereal CJ Centre Front Entrance Sidewalk Walkway Concrete Repour
Solicitation # AB-2026-05514
The Special Areas Board is soliciting proposals to repour the front main entrance sidewalk and walkway at the Cereal CJ Peacock Centre located at 415 Main Street, Cereal, Alberta. The project involves the complete removal of the existing concrete surface as indicated in provided documentation, followed by the installation of welded wire mesh and the pouring and finishing of new concrete to meet specified standards. The work is limited to the designated areas of the entrance walkway and must be executed in accordance with the technical requirements outlined in the full specifications. A mandatory site visit is required for all interested bidders, with the date and time detailed in the official documentation to ensure proper understanding of site conditions and scope. Proposals must be submitted by the deadline of August 18, 2026, at 5:00 PM MT, under solicitation number AB-2026-05514, which was posted on August 5, 2026. Bidders should direct all inquiries to Heather Pedersen, Requisition Clerk/HR Services, via email at heather.pedersen@specialareas.ab.ca or phone at 403-854-5613. The contract is open to qualified service providers without set-aside restrictions, and all submissions must be made through the Alberta Purchasing Connection portal at the provided UI link. Compliance with all technical, scheduling, and safety requirements is essential for consideration.
Special Areas Board

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 423610
New
DIBBS
TAPE, INSULATION, ELE
Solicitation # SPE4A7-26-Q-0979
This contract specifies the procurement of electrical insulation tape identified by NSN 5970-01-012-4280, with a unit of issue of one roll equaling 108 feet, and a shelf life of 12 months that is extendable under Type 2 (Code 4) requirements. The product is classified as a commercial item and meets the technical specifications outlined in CID A-A-59474D Revision D dated 01/23/2024, with the part number AA59474 TY1 CL4 1W. It is designated as a critical application item, requiring strict adherence to quality and packaging standards. All packaging and preservation must comply with MIL-STD-2073-1E and DLA’s Packaging Requirements for Procurement, including use of appropriate preservation methods, materials, and marking per MIL-STD-129 with special code 33 indicating Type II shelf life. Mercury and mercury compounds are strictly prohibited in any phase of preservation, packaging, or marking. The contract is priced on a firm fixed price basis with zero variance allowed in quantity, and inspection and acceptance occur at origin. Delivery must be completed within 100 days after the order date, with shipments required to be sent by traceable means only—parcel post is explicitly forbidden. The delivery address is Davis Monthan Air Force Base, and all packaging must be palletized according to DLA specifications. The unit contains 36 yards, and the contract is issued under solicitation SPE4A7-26-Q-0979 with a response deadline in August 2026 and a required delivery date of June 16, 2026. The supply is linked to purchase request 7017218915, and all technical and quality requirements referenced are governed by the DLA Master List of Technical and Quality Requirements in effect on the solicitation or award date, depending on acquisition type.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe Port of Seattle through its Aviation Project Management Group is forecasting a procurement under NAICS code 236220 for the full design, permitting, and construction services to replace the Checkpoint 5 security grill. The scope encompasses a comprehensive range of activities including site assessment, development of design drawings and technical specifications compliant with TSA CRPG Section 3-5, submission for regulatory review and permit acquisition, demolition and proper disposal of the existing grill, fabrication and installation of the new system, and seamless integration with existing structural, electrical, and security badge access systems. Coordination with all relevant stakeholders is required to ensure adherence to safety and operational standards while minimizing disruption to airport functions. The project is structured under a design-build-bid delivery method and is being managed by the Port of Seattle with primary contact Yanet Maldonado and project manager Collette Deardorff available for inquiries. The solicitation was posted on July 31, 2026, and while no specific award date or set-aside details are provided, the location of performance is tied to the Port of Seattle’s facilities. All work must be executed with strict attention to federal security requirements and operational continuity in a high-traffic aviation environment.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle will replace 125 aging Robicon variable frequency drives (VFDs) with new equipment as part of Phase 3 of its VFD Replacement initiative. This effort aims to upgrade outdated infrastructure to ensure system reliability and improve operational efficiency across aviation facilities and infrastructure. The new VFDs will be fully integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking, enhancing the Port’s ability to manage power consumption and maintain optimal performance. The scope includes all necessary wiring, testing, commissioning, and installation of associated equipment required to deliver a fully functional and synchronized system. The work falls under NAICS code 238210 and is managed by the Aviation Facilities & Infrastructure division, with technical oversight from Project Manager Sharon Miick and primary point of contact Yanet Maldonado. Although the solicitation number and set-aside details are not specified, the forecast was posted on July 31, 2026, signaling upcoming procurement activities. The project is critical for modernizing the Port’s electrical infrastructure and supporting long-term sustainability goals through precise control and monitoring of motor-driven systems. All work must be performed on-site at the Port’s facilities, with full accountability for system integration, performance validation, and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract requires the provision of design, permitting, and construction services to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and enforcement capabilities by replacing outdated systems with improved coverage, specifically targeting main terminal drive lanes and entrances previously unmonitored, with the goal of supporting forensic investigations and adherence to port movement rules. In the Bagwell area, the new cameras will shift focus from conveyor systems and security doors to critical transit corridors, while the North Cargo operations will benefit from flexible, user-controlled Pan Tilt Zoom units that provide broad surface area monitoring and dynamic viewing capabilities to address operational gaps. All work must be completed in accordance with specified technical and operational standards to ensure seamless integration with existing security infrastructure. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The North American Industry Classification System code 238210 identifies this as a specialty trade contracting effort focused on electrical and communication system installation. Although the solicitation has not yet been formally issued, the forecasted posting date is July 31, 2026, indicating this is a forward-looking opportunity for qualified contractors to prepare proposals. The place of performance is within the Port of Seattle’s operational boundaries, and all contractors must be prepared to navigate port-specific logistics, security protocols, and environmental constraints during installation and commissioning.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Terminal Envelope Upgrade - Roof Replacement Project (DBB)The Port of Seattle’s Aviation Facilities & Infrastructure division is preparing to undertake a roofing replacement project at a terminal facility, targeting the demolition and removal of approximately 13,600 square feet of existing roofing membrane and insulation, along with the associated flashing and roof drains. The project will involve complete removal and installation of a new roofing system to ensure structural integrity and weather resistance, with work scoped to include all related components critical to proper drainage and sealing. This initiative falls under NAICS code 238160, indicating it is a roofing contract, and is being managed as a design-bid-build procurement under the Terminal Envelope Upgrade program. The solicitation is listed as a forecast with a posted date of July 31, 2026, and is not currently open for bids, but interested parties should monitor the official portal for formal release. Primary contact for inquiries is Angela Peterson, reachable via phone or email, with John McWilliams serving as the project manager for technical coordination. Although specific location details are not provided in the data, the work will occur at a Port of Seattle aviation facility, and all performance activities are expected to align with federal and local building standards. No set-aside provisions are indicated, suggesting the contract is open to all eligible contractors.
Aviation Facilities & Infrastructure

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Rental Car Facility (RCF) Customer Service Building (CSB) Re-DemisingThe contract involves a comprehensive renovation and structural upgrade of the Customer Service Building at the Rental Car Facility to prepare for a new concession agreement and tenant construction beginning June 1, 2027. Key improvements include updating wayfinding signage to reflect new tenant layouts, constructing a new break room and flex space to support transit operations, renovating existing restrooms, and replacing outdated car wash equipment in the Quick Turn Around areas. Structural enhancements are also required to address cracking and repair post-tension cables, along with replacing expansion joints on the fifth floor plaza areas to ensure long-term durability and safety. These modifications are designed to modernize the facility and align its infrastructure with future operational needs. The project is managed by the Port of Seattle’s Aviation Project Management Group, with official point of contact Angela Peterson and Project Manager Julia Ruzon overseeing procurement and implementation. The work falls under NAICS code 236220, indicating commercial building construction, and is forecasted with a posted date of July 31, 2026. While no solicitation number or set-aside details are provided, the scope underscores a major capital improvement initiative focused on functionality, tenant readiness, and structural integrity for a high-traffic facility serving airport operations.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Pier 69 Third Floor Terrace RepairThe contract entails the complete demolition of the existing roof system on the third floor east terrace at Pier 69, including removal of pavers, drainage mat, and waterproof membrane. It requires installation of a new roof system using a pedestal-supported design with thinner pavers to improve drainage efficiency and prevent water accumulation. A new barrier wall will be constructed and installed around the structural steel beams to protect them from future corrosion caused by moisture exposure. All materials removed during demolition, including planters and other components, must be carefully staged and reinstalled using a crane due to their size and weight. The work is scoped to ensure long-term durability and performance of the terrace structure while meeting drainage and structural integrity standards. The project is managed by the Port of Seattle through its Waterfront Project Management division and is classified under NAICS code 238160 for roofing contractors. The solicitation was posted on July 31, 2026, and is currently in forecast status with no set-aside type specified. Primary point of contact is Todd Rehm, reachable at 206-491-2899 or rehm.t@portseattle.org, with Samuel Hansen serving as the project manager. The full details and documentation are available through the Port of Seattle’s online solicitation portal, though no physical address or geographic specifics beyond Pier 69 are provided in the data.
Waterfront Project Management

POSTED

about 7 hours ago

DEADLINE

N/A
View Details