Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

CRITICAL PATH ENGINEERING LLC

UEI: CE4SJYU6FKH5

CRITICAL PATH ENGINEERING LLC is a federal contractor, registered under UEI CE4SJYU6FKH5. It has been awarded $605,820 across 2 federal contracts. Primary work spans Remediation Services. Top awarding agencies include Department Of Energy (doe).

Contact Information

Registration and classification details

Registration

UEI Code

CE4SJYU6FKH5

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Energy (doe)$605.8K100%
Awards by NAICS
562910 - Remediation Services$605.8K100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in CRITICAL PATH ENGINEERING LLC's top NAICS codes and agencies

NAICS: 562910
New
902/903 Dorm Mold Remediation & Removal
Solicitation # 902/903 Dorm Mold Remediation and Removal
This contract involves mold remediation and removal services at two dormitory buildings—902 and 903—at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the complete remediation of mold-contaminated areas, including the removal and disposal of affected drywall, insulation, ceiling materials, and finishes, along with thorough cleaning, sanitization, and restoration to match existing conditions. All activities must comply with EPA guidelines and IICRC S520 standards, utilizing negative air pressure containment, HEPA filtration, and commercial-grade dehumidification equipment. Post-remediation verification, including air quality testing if necessary, must be documented and submitted. The work is to be performed within 60 consecutive business days after receipt of a Notice to Proceed, with a required site visit and signed attendance roster prior to bid submission. The contract type is a fixed-price, single lump sum, with an estimated value between $25,000 and $100,000. Bidders must submit a detailed cost breakout on company letterhead itemizing labor, materials, equipment, fees, bonds, subcontractor costs, overhead, and profit. A bid bond equal to 20% of the base bid is required if the bid is $25,000 or more, along with performance and payment bonds at 100% of the contract price, issued by an A-rated surety. Contractors must provide proof of insurance covering workers’ compensation, general liability, automobile, and professional liability, and must comply with federal wage requirements under the Construction Wage Rate Requirements and Executive Order 13658, submitting weekly certified payroll reports. Hazardous materials used must be accompanied by Safety Data Sheets, and all waste must be collected daily and removed off-site in accordance with environmental regulations. The project is subject to strict debarment and suspension disclosures under FAR 52.209-6, and subcontractors must self-certify their business category per NAICS code 562910. The contracting entity is Management & Training Corporation (MTC), acting on behalf of the U.S. Department of Labor, and the solicitation is set aside exclusively for small business concerns including small disadvantaged, women-owned, veteran-owned, and HUBZone small businesses. Proposals must be submitted via email by August 10, 2026 at 3:00 PM CST, and awards will be made based on
Earle C. Clements Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 4 days
View Details
NAICS: 562910
New
Mold Remediation
Solicitation # mold-remediation
The contract seeks a licensed mold remediation contractor to perform remediation services at the Solo Parent Dormitory within the Flint Hills Job Corps Center in Manhattan, Kansas, specifically targeting rooms 208, 209, 210, 302, 310, and the 300 hallway linen closet. The work must adhere to the IICRC S520 Mold Remediation Standard, EPA guidelines, OSHA regulations, and Job Corps safety and facility standards, with all containment procedures requiring critical barriers and HEPA-filtered negative air machines. The contractor must remove contaminated porous materials such as drywall, insulation, and carpeting, clean and treat surfaces with EPA-registered antimicrobials, and bag and seal all waste for proper disposal. A comprehensive post-remediation verification process, including visual inspections, air and surface sampling, and a detailed written report with lab results and photographs, is mandatory for acceptance. The performance period is limited to 10 business days, and a one-year warranty on the remediation work is required. The solicitation is designated as a small business set-aside, open to SBA-certified categories including SB, SDB, WOSB, HUBZone SB, VOSB, and SDVOSB. Offerors must submit a complete proposal that includes a detailed pricing schedule with labor, material, and total costs, along with a W-9 form and DUNS number. Compliance with the Davis Bacon Act wage determinations is required, and contractors must provide a Certificate of Liability Insurance naming the Job Corps Center as both certificate holder and additional insured. Awards will be made to the offeror whose proposal is most advantageous based solely on price and price-related factors, with material compliance serving as a pass/fail gate—any non-compliance results in disqualification. Upon award, the contractor must submit SF-1413 and, if the contract exceeds $30,000, Serrato Form 542. The deadline for proposal submission is August 13, 2026, at 4:00 PM CST.
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 562910
New
SLED
Asbestos Abatement and Hazardous Material RemovalThe contract involves the safe removal, containment, and disposal of asbestos-containing flooring materials across four designated cabins, requiring full compliance with federal, state, and local environmental and health regulations. The work must be executed with stringent safety protocols to prevent asbestos fiber release, including proper containment procedures, use of approved personal protective equipment, and adherence to decontamination standards for personnel and equipment. All materials contaminated with asbestos must be handled, labeled, transported, and disposed of in licensed facilities certified for hazardous waste management. The solicitation, titled Asbestos Abatement and Hazardous Material Removal, is issued as a subcontract under NAICS code 562910 for hazardous waste collection and treatment services, and is managed by the Department of Land & Natural Resources in Hawaii. The opportunity was posted on August 4, 2026, with a response deadline of August 25, 2026, at 2:00 AM. Although no specific location details are provided beyond the state designation, performance is expected to occur within Hawaii, and bidders must ensure familiarity with state-specific asbestos regulations. The contract does not specify set-aside status, and no point of contact information is listed, leaving potential respondents to refer to the provided public link for additional details.
Department of Land & Natural Resources

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 562910
New
SLED
Derelict Vessel Removal, Transport, and Disposal - 32' Islander - Re-Solicit
Solicitation # WM2638
Escambia County Marine Resources Division is soliciting bids for the removal, transport, and disposal of a 32-foot Islander vessel, previously broken apart by Tropical Storm Bertha, located near Pensacola Pass at approximately 30°20.356'N, 87°18.902'W. The vessel, registered as DO591303 and identified under FWC Case Number FWC26ON0056048, requires complete removal of all debris, with bidders expected to account for the full cost of floating, hauling, and landfill tipping at the Perdido Landfill. Due to the vessel’s proximity to Naval Air Station Pensacola, contractors must secure all necessary permissions from the U.S. Navy prior to commencing work. The condition of the vessel and its debris has changed since the original solicitation, and bidders are strongly advised to verify vessel dimensions, structural integrity, and environmental hazards independently before submitting quotes. All information provided by Escambia County is based on the best available data as of posting and may not reflect current realities on site. The solicitation, numbered WM2638, was posted on August 4, 2026, with responses due by August 11, 2026, at 7:00 PM Eastern Time. Proposals must include itemized pricing for all services associated with the removal and disposal process. Bidders are responsible for conducting site assessments and ensuring compliance with all regulatory, environmental, and security requirements, especially given the vessel’s location near federal property. Point of contact for inquiries is Matt Szatkowski, Environmental Program Manager, with Angela Jones as the secondary contact for purchasing coordination. The work will be performed in Florida, with performance location unspecified beyond the general area, and all bid submissions must be made through the designated open procurement portal. Contracts will be awarded based on comprehensive, verified pricing that accounts for the vessel’s degraded condition and the logistical challenges of working in a sensitive coastal and naval environment.
Natural Resources

POSTED

1 day ago

DEADLINE

in 6 days
View Details