Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

GEOTHERMAL ECO OPTIONS, INC.

UEI: G2P3KW63DM73CAGE: 7YMV8

GEOTHERMAL ECO OPTIONS, INC. is a federal contractor, registered under UEI G2P3KW63DM73 and CAGE code 7YMV8. It has been awarded $106,650 in federal contracts. Primary work spans All Other Specialty Trade Contractors and Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

G2P3KW63DM73

CAGE Code

7YMV8

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S Corporation

NAICS Codes

237110Water and Sewer Line and Related Structures Construction(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Geothermal Eco Options, Inc. specializes in the design, installation, and emergency repair of geothermal energy systems integrated with water and sewer infrastructure, particularly in sensitive natural resource environments. Their technical expertise lies in subsurface thermal exchange systems, unde...

Geothermal Eco Options, Inc. specializes in the design, installation, and emergency repair of geothermal energy systems integrated with water and sewer infrastructure, particularly in sensitive natural resource environments. Their technical expertise lies in subsurface thermal exchange systems, underground piping networks, and hydraulic control structures that support environmental compliance and ecological resilience. The contractor demonstrates a focused capability in deploying low-impact, energy-efficient geothermal solutions within federally protected lands, including wildlife refuges and conservation areas, where traditional heating and cooling methods are restricted. Their work requires precise coordination with hydrogeological conditions, non-invasive excavation techniques, and adherence to National Environmental Policy Act (NEPA) standards, setting them apart as a niche provider of sustainable infrastructure for ecologically constrained sites. The company has delivered projects exclusively for the Department of the Interior, primarily supporting field operations of the U.S. Fish and Wildlife Service and National Park Service. Their engagements involve emergency repairs to critical geothermal systems that maintain habitat temperature stability for aquatic and amphibious species, indicating a trusted, mission-critical relationship built around environmental stewardship and operational continuity in remote or protected areas. Geothermal Eco Options operates within NAICS 237110, which encompasses the construction of water and sewer lines and related structures, but their application is uniquely specialized toward geothermal energy infrastructure rather than conventional utilities. This positions them as a rare contractor capable of merging renewable energy systems with civil water infrastructure in environmentally sensitive contexts, serving a highly specialized segment of the federal sustainability market. The company is headquartered in Decorah, Iowa, with no public certifications on record. Its business profile reflects a small, regionally based firm with deep local knowledge of Midwestern hydrogeology and federal land management protocols, enabling targeted, on-the-ground execution in federal conservation zones without reliance on large-scale corporate infrastructure.

Key Performance Metrics

Awards Count

5

All time

Active

1

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with GEOTHERMAL ECO OPTIONS, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for GEOTHERMAL ECO OPTIONS, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in GEOTHERMAL ECO OPTIONS, INC.'s top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details