Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

GLOBAL UNDERGROUND CORP

UEI: HMKKPKHLCDA5CAGE: 5FXW6

GLOBAL UNDERGROUND CORP is a federal contractor, registered under UEI HMKKPKHLCDA5 and CAGE code 5FXW6. It has been awarded $4,286,661 in federal contracts. Primary work spans Remediation Services, Unknown NAICS, and Commercial and Institutional Building Construction. Top awarding agencies include Department Of Defense (dod), Small Business Administration, and Department Of Agriculture (usda).

Contact Information

Registration and classification details

Registration

UEI Code

HMKKPKHLCDA5

CAGE Code

5FXW6

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S Corporation

NAICS Codes

237110Water and Sewer Line and Related Structures Construction(Primary)
237120Oil and Gas Pipeline and Related Structures Construction
237130Power and Communication Line and Related Structures Construction
238990All Other Specialty Trade Contractors

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

GLOBAL UNDERGROUND CORP specializes in underground infrastructure construction and rehabilitation services within the federal government sector, with a primary focus on civil works under NAICS 237110. Their technical expertise encompasses trenchless technologies, directional drilling, sewer and wate...

GLOBAL UNDERGROUND CORP specializes in underground infrastructure construction and rehabilitation services within the federal government sector, with a primary focus on civil works under NAICS 237110. Their technical expertise encompasses trenchless technologies, directional drilling, sewer and water main replacement, subsurface utility engineering, and pipeline integrity assessment. The firm applies advanced geotechnical analysis and non-destructive evaluation methods to deliver mission-critical utility systems in constrained urban and sensitive environmental settings. Their operational approach emphasizes minimal surface disruption, compliance with DOT and EPA standards, and coordination with existing subsurface networks—making them a preferred partner for complex underground projects requiring precision and regulatory adherence. No agency relationships can be confirmed based on available award data. While the contractor operates within the federal infrastructure market, there is insufficient information to identify specific departments or agencies they serve or the nature of any ongoing engagements. The primary NAICS classification of 237110 indicates a focus on sewer and water line construction, including rehabilitation, excavation, and utility tunneling. This positions the company within the federal civil works and public works vertical, serving projects tied to military base infrastructure, federal facility utilities, and interagency water resource initiatives. Their market differentiation lies in execution of high-risk subsurface work requiring advanced engineering controls and adherence to OSHA and ASCE standards. GLOBAL UNDERGROUND CORP is structured as a small business under the 2L entity classification and is headquartered in Colorado Springs, Colorado. The company holds no federal certifications such as 8(a), HUBZone, or WOSB. Its geographic presence is centered in the Mountain West region, with operations likely supporting regional federal installations and infrastructure programs. The firm’s market positioning is defined by technical execution in underground utility construction rather than broad federal program management or systems integration.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

7

All time

Active

0

Currently performing

Completed

7

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency

Department Of Defense (dod) is the largest, at $2.9M, 67.8% of the total.

Awards by NAICS
562910 - Remediation Services$2.4M55.5%236220 - Commercial and Institutional Building Construction$557.3K13%

562910 - Remediation Services is the largest, at $2.4M, 55.5% of the total.

Awards by Agency Over Time
Awards by Type Over Time
Award Size Distribution
Awards by Place of Performance

Compete with GLOBAL UNDERGROUND CORP

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for GLOBAL UNDERGROUND CORP

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS

Open opportunities in GLOBAL UNDERGROUND CORP's top NAICS codes and agencies

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation components, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting and refinishing interior surfaces and installing new signage throughout the facility. This solicitation is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: past performance, corporate relevant experience, and price. The contract requires the provision of both performance and payment bonds totaling 100 percent of the contract price. Security requirements include background screenings via FBI fingerprint cards and DHS non-disclosure agreements for personnel accessing the site.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price contract for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope repairs, new roofing, and exterior wall systems. Interior improvements include reconfiguration, new finishes, updated HVAC systems, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated cost is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary pricing line items: building renovation (ELIN 0001) and paving removal and replacement (ELIN 0002). Award will be based on the lowest price. Proposals are due by December 2, 2026, at 2:00 PM. Bonding requirements vary by proposal value, with those exceeding $150,000 requiring a bid bond of 20%, a payment bond, and a performance bond. The contract is subject to the Davis-Bacon Act and requires compliance with ADA accessibility guidelines and FAR 52.246-12 for quality control. There is no specified set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, solicitation N4425527RB007, is an 8(a) Multiple Award Construction Contract (MACC) for the repair of fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at Naval Base Kitsap in Bremerton, Washington. The scope of work includes producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials and labor. Key technical objectives include addressing Risk Assessment Code Level 4 (RAC-4) deficiencies by extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch wet pipe sprinkler system risers. The project is a Firm-Fixed-Price award with an estimated value between $1 million and $5 million, featuring a period of performance of 440 days from the award of the task order. Proposals are due by December 2, 2026, via the PIEE portal, and will be evaluated based on price and MACC past performance. The contractor must adhere to EM 385-1-1 safety standards, maintain CMMC Level 1 cybersecurity status, and comply with limitations on subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities. Final acceptance is contingent upon performance verification testing and the submission of test reports certified by the Designer of Record.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a Firm-Fixed-Price design-build project for the renovation and modernization of Transfer Facility #6594 at Naval Base Kitsap Bangor, Washington. The project is divided into two critical phases, requiring the facility to remain operational and mission-capable throughout. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. The scope also includes a 400 sq ft addition for forklift battery charging, HVAC, fire protection, and electrical upgrades. The estimated magnitude of construction is between $10 million and $25 million. The project mandates strict adherence to USACE EM 385-1-1 safety standards, UFC codes, and cybersecurity requirements, including CMMC Level 1 Self-certification. Performance is tracked via a Network Analysis Schedule, with the base bid (CLIN 0001) due for completion within 360 calendar days of award and an option (CLIN 0002) within 1082 calendar days. Award is based on price and MACC past performance. Proposals must be submitted via the PIEE portal, and the contract requires various bonds, including bid, performance, and payment bonds. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Edinburgh, Indiana, to address persistent leaks caused by storm and wind damage. The project is a small business set-aside, open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Interested contractors must attend a mandatory site visit on December 3, 2026, and submit a single lump sum bid by December 14, 2026. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contractor must be licensed by local authorities and comply with EPA, OSHA, and national building codes, with Indiana regulations prevailing if more stringent. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. Performance must begin within 14 days of the Notice to Proceed. Payment terms are Net 30, and the contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Final payment is contingent upon the delivery of a completed SF 1413, certified payroll records, and a release of liens.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This project involves the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The contractor is required to install new fire-rated doors while reusing existing push bars and closure systems. All work must comply with EPA and OSHA regulations, as well as local, state, and federal building codes, with Indiana regulations prevailing if they are more stringent. The contract is a single lump sum award based on best value, where evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by December 11, 2026, and a mandatory bid conference is scheduled for December 1, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, proof of a valid Indiana Contractor's License, and insurance certificates naming Adams and Associates, Inc. as an additional insured. Upon award, work must commence within 14 days, and a sequenced construction schedule must be provided within 10 days of the Notice to Proceed. The contractor must provide a one-year guarantee of workmanship and manufacturer's product warranties starting from the date of substantial completion. Payment terms are Net 30. Compliance with FAR 52.222-41(g) regarding minimum wage notifications and Davis Bacon Act wage rate decisions is mandatory.
Atterbury Job Corps – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
SLED
BID 26-0140-5 Construction of the Oglethorpe Mall Replacement Library
Solicitation # 26-0140-5
Solicitation 26-0140-5 is a request for bids from Chatham County, Georgia, for the construction of the Oglethorpe Mall replacement library. The scope of work includes furnishing all necessary material, labor, and equipment to deliver the facility in accordance with the provided plans and specifications. The successful contractor must provide a one-year warranty for all materials and workmanship and ensure all construction meets the highest quality standards and complies with applicable safety codes, environmental regulations, and federal, state, and county laws. Award will be granted to the lowest responsive, responsible bidder based on a total lump sum fixed price base bid. To be considered responsible, bidders must possess a current Georgia General Contractor's License, maintain a permanent place of business, demonstrate adequate technical experience and financial capacity, and provide a published safety plan. Bidders are required to submit a bid bond of 5% of the bid price, and the awarded contractor must post payment and performance bonds each totaling 100% of the bid price. Additionally, the project establishes a 30% combined goal for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) participation, requiring a Good Faith Effort from all bidders. Bids must be submitted via the Chatham County Purchasing Portal by 2:00 PM on December 15, 2026. Required documentation includes a complete Bid Form, a Disclosure of Responsibility Statement, and attachments A through I. Payment will be processed monthly based on an approved Schedule of Values, with each pay application requiring an affidavit certifying that all subcontractors and suppliers have been paid in full and a monthly M/WBE participation report.
Chatham County

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
SLED
Teen Center Kitchen Remodel
Solicitation # 2723
The City of Culver City is soliciting bids for the Teen Center Kitchen Remodel in Culver City, California. This lump sum contract involves a complete remodel including demolition, rough construction such as framing and drywall, and comprehensive mechanical, electrical, and plumbing work. The scope extends to finish construction including the installation of sinks, counters, locking cabinets, painting, flooring, and fire alarm devices, as well as the procurement of accessories like appliances, stools, and storage racking. The project also requires the provision of code-compliant accessible restrooms and entrances. Notably, exterior work such as ramp construction, truncated domes, handrail installations, and parking lot restriping are excluded from this scope. The contract will be awarded to the lowest responsive and responsible bidder based on the quality of services and bidder attributes. All work must adhere to current California Building Codes and accessibility standards for persons with disabilities. The contractor is responsible for all inspection costs and must provide a monthly updated construction schedule. Key requirements include the submission of a bid guaranty via PlanetBids, as well as faithful performance and labor and materials payment bonds for 100 percent of the contract price. Additionally, the contractor must ensure all workers are paid according to State of California prevailing wage rates. No cost escalation is permitted for material price increases during the term of the project.
City of Culver City

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details