Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

HACH COMPANY

Subsidiary ofDANAHER CORPORATIONUEI: WSPVZEN4KLP9CAGE: 91224

HACH COMPANY is a federal contractor, registered under UEI WSPVZEN4KLP9 and CAGE code 91224. It has been awarded $55,732,220 in federal contracts. Primary work spans Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables, Analytical Laboratory Instrument Manufacturing, and Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing. Top awarding agencies include Department Of The Interior, Department Of Defense, and Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

WSPVZEN4KLP9

CAGE Code

91224

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationManufacturer of Goods

NAICS Codes

325180Other Basic Inorganic Chemical Manufacturing
334513Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables(Primary)
334516Analytical Laboratory Instrument Manufacturing
334519Other Measuring and Controlling Device Manufacturing
811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Hach Company specializes in the manufacturing, installation, and maintenance of precision instruments for measuring, displaying, and controlling industrial process variables, with deep expertise in water quality monitoring systems, analytical sensors, and laboratory-grade detection equipment. Their ...

Hach Company specializes in the manufacturing, installation, and maintenance of precision instruments for measuring, displaying, and controlling industrial process variables, with deep expertise in water quality monitoring systems, analytical sensors, and laboratory-grade detection equipment. Their technical capabilities span chlorine and pH measurement systems, spectrophotometric analysis, and field-deployable water quality analyzers, supporting critical infrastructure operations. They provide end-to-end support including calibration, repair, and integration of industrial process control devices, with demonstrated proficiency in deploying ruggedized instrumentation for harsh environmental conditions. Their specialization in chemical reagent supply and sensor maintenance ensures continuous operational reliability for mission-critical monitoring applications. The contractor maintains a strong, sustained relationship with the Department of the Interior, delivering water quality instrumentation for national parks, reservoirs, and watershed management programs. They also support the Department of Defense and Department of Veterans Affairs with field-deployable water testing systems, laboratory calibration services, and maintenance of environmental monitoring equipment. Their work for these agencies consistently involves compliance with federal water safety standards and real-time data collection for regulatory reporting. Hach Company’s primary industry focus is in the manufacturing of industrial process measurement and control instruments, particularly for water and wastewater applications. They serve the environmental monitoring, public utilities, and defense infrastructure sectors with high-precision analytical devices, positioning themselves as a trusted supplier of certified measurement solutions for federal water quality programs. Their niche lies in translating laboratory-grade accuracy into field-ready, durable instrumentation. As a manufacturing entity based in Loveland, Colorado, Hach Company operates under a 2L corporate structure and holds no federal certifications. Their geographic presence is centered in the U.S. West, with a national footprint driven by federal procurement channels. They are recognized within government markets for technical reliability and long-term support of complex monitoring systems, particularly in agencies requiring continuous environmental data integrity.

Key Performance Metrics

Awards Count

2,589

All time

Active

22

Currently performing

Completed

2,567

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency Over Time
Awards by Place of Performance

Compete with HACH COMPANY

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for HACH COMPANY

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in HACH COMPANY's top NAICS codes and agencies

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

27 minutes ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

27 minutes ago

DEADLINE

in 13 days
View Details
NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include replacing friction discs, bearings, oil seals, and O-rings, as well as resurfacing the flywheel and replacing hydraulic pipes and filters as necessary. Final acceptance is contingent upon the Facility Maintenance Department verifying proper clutch engagement and PTO operation under load. This is a fee-for-service contract awarded on a best-value basis, with a response deadline of November 3, 2026. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Applicants must submit a bid sheet, proof of insurance, a completed supplier packet including Form W-9, and a self-certification form. The contract is subject to various Federal Acquisition Regulations, including Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31 for Kentucky, and strict requirements regarding the security of non-public information and the prevention of trafficking in persons.
Earle C. Clements Job Corps Center

POSTED

27 minutes ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

27 minutes ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

27 minutes ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A; K-27-2470-DBB-3-C
Solicitation # BP26019
The City of San Diego's Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A, contract K-27-2470-DBB-3-C, is a federally assisted infrastructure project with an estimated construction cost of 35,100,000.00 dollars. The scope of work is divided into two primary components: the installation of approximately 5,216 linear feet of new sewer pipe, including groundwater dewatering, bypass pumping, and trenchless work, and the replacement of approximately 5,886 linear feet of existing 6, 8, 12, and 16 inch AC water mains and associated appurtenances. Additional requirements include the construction of temporary access roads, traffic control, signal loop replacement, curb ramp installation, and site restoration through repaving and revegetation. The project has a total completion time of 550 working days, which includes a 120-day Plant Establishment Period and a 25-month Long Term Maintenance and Monitoring Agreement for vegetated areas. This is a prevailing wage project governed by a Citywide Project Labor Agreement and requires Good Faith Efforts to include Disadvantaged Business Enterprise firms. Bidders must adhere to specific technical plans and provide a Community Health and Safety Plan. Prime contractors are required to submit a Confidentiality Certification to access sensitive information, and all work must be performed in accordance with the City of San Diego's specifications and designated location maps.
BURTECH PIPELIINE INCORPORATED

POSTED

27 minutes ago

DEADLINE

in 42 minutes
View Details