Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD.

UEI: GL1BBLAKEW87CAGE: 1C02F

HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD. is a federal contractor, registered under UEI GL1BBLAKEW87 and CAGE code 1C02F. It has been awarded $250,354,240 in federal contracts. Primary work spans Commercial and Institutional Building Construction, Other Building Equipment Contractors, and Building Inspection Services. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

GL1BBLAKEW87

CAGE Code

1C02F

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit Organization

NAICS Codes

212321Construction Sand and Gravel Mining
236210Industrial Building Construction
236220Commercial and Institutional Building Construction(Primary)
237110Water and Sewer Line and Related Structures Construction
237120Oil and Gas Pipeline and Related Structures Construction
+4 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Hyundai Engineering & Construction Co., Ltd. specializes in large-scale infrastructure construction and civil engineering projects, with core capabilities rooted in heavy construction, structural engineering, and project lifecycle management for public works. The firm delivers complex facility const...

Hyundai Engineering & Construction Co., Ltd. specializes in large-scale infrastructure construction and civil engineering projects, with core capabilities rooted in heavy construction, structural engineering, and project lifecycle management for public works. The firm delivers complex facility construction services, including site preparation, earthwork, concrete framing, and utility integration, applying advanced construction methodologies and quality control systems aligned with international engineering standards. Their technical expertise encompasses project planning under strict regulatory frameworks, geotechnical analysis, and sustainable construction practices, though specific project types cannot be inferred due to lack of award history. Differentiators include rigorous adherence to safety protocols, precision in material handling, and experience managing multi-phase civil works under demanding timelines. No agency relationships can be identified due to insufficient contract data. The absence of award records prevents characterization of federal or state-level engagement patterns, and no discernible relationship with specific government departments can be established. The primary NAICS code 236220 indicates focus on commercial and institutional building construction, suggesting alignment with non-residential infrastructure such as government facilities, public buildings, and institutional campuses. In practice, this translates to expertise in constructing durable, code-compliant structures designed for long-term public use, though vertical specializations cannot be confirmed without project examples. Hyundai Engineering & Construction Co., Ltd. operates as a large-scale corporate entity based in Seoul, South Korea, with a 2L corporate structure indicating a parent-subsidiary hierarchy. The company holds no U.S. government certifications, and its geographic presence in the U.S. government market cannot be verified from available data. While the firm possesses global construction experience, its direct involvement in U.S. federal contracting remains undocumented.

Key Performance Metrics

Awards Count

4

All time

Active

0

Currently performing

Completed

4

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in HYUNDAI ENGINEERING & CONSTRUCTION CO.,LTD.'s top NAICS codes and agencies

NAICS: 236220
New
SLED
26-10026-000 BLDG 536, ROOMS 42 & 43 CONVERSION, PROJECT# A24-00043
Solicitation # A24-00043
The California Department of State Hospitals is soliciting lump sum bids for Project A24-00043, which involves the conversion of Rooms 41 and 43 in Building 536 at the Atascadero facility. The scope of work includes architectural demolition and renovation to support Physical Therapy and ECT services, mechanical airflow re-balancing and duct installation, and plumbing updates including the installation of five sinks. The project requires adherence to Title 24 electrical standards, Office of the State Fire Marshal approval, and General Prevailing Wage Rates. Physical construction must commence within 10 calendar days of the Notice to Proceed, with specific timeframes allocated for startup, testing, commissioning, and the completion of punch list items. The contract will be awarded based on the lowest adjusted bid price, with significant preferences given to certified Small Businesses and Disabled Veteran Business Enterprises. Bidders must provide a bid security of at least 10 percent of the bid and furnish performance and payment bonds totaling 100 percent of the contract price upon selection. All bids must be submitted under sealed cover using the official Bid Form and must be submitted under the bidder's licensed name. The contractor is responsible for strict waste management to divert debris from landfills and must comply with California Code of Regulations regarding maximum allowable VOC levels for cleaning products. Personnel are required to obtain security clearance to work on-site.
California Department of State Hospitals

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems and lighting controls. The project also requires the installation of new signage and the correction of plumbing deficiencies. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, with price, past performance, and corporate relevant experience weighted with equal importance. Offerors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict material handling and labeling standards, particularly for wood products and electrical wiring. Compliance with the Americans with Disabilities Act, Buy American requirements, and prevailing wage rates for Glynn, Brantley, and McIntosh counties is mandatory. Proposals must be submitted electronically in separate price and technical volumes to the Contracting Officer by the specified deadline.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, with evaluation factors including compliance with the Buy American Act. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires adherence to ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems. Quality assurance is managed through a multi-stage inspection process involving punch-out, pre-final, and final acceptance inspections. Monthly invoicing must be submitted via Wide Area Work Flow with required NAVFAC certifications and supporting documentation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must comply with six specific GFEs, with several mandatory requirements for a bid to be deemed responsive. Specifically, proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be included in the bid package. Documentation for outreach efforts may be submitted up to three business days after the bid closing date. Failure to meet these specific GFE requirements will result in the bid being deemed non-responsive.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and abatement to specialized mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the full bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, with Massachusetts state regulations prevailing if they are more stringent than federal requirements. The contract is a small business set-aside and requires a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a Massachusetts contractor's license, a W9, a completed vendor questionnaire, a wage rate certification, and a minimum 90-day bid guarantee. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award and maintain general liability insurance of at least one million dollars per occurrence. Pricing submitted in proposals must remain firm for 60 calendar days.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details