Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Lighting Supply Guy

UEI: SLED_0ACA12E344FB0A11

Lighting Supply Guy is a federal contractor, registered under UEI SLED_0ACA12E344FB0A11. It has been awarded $8,246 across 3 federal contracts. Primary work spans Unknown NAICS. Top awarding agencies include Dallas Area Rapid Transit.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_0ACA12E344FB0A11

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Dallas Area Rapid Transit$8.2K100%
Awards by NAICS
- Unknown NAICS$8.2K100%
Awards by Agency Over Time
Awards by Place of Performance

Compete with Lighting Supply Guy

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for Lighting Supply Guy

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in Lighting Supply Guy's top NAICS codes and agencies

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Dallas Area Rapid Transit

POSTED

16 days ago

DEADLINE

in 5 days
View Details
SLED
Patch Cables (Network)
Solicitation # B-2099492
Dallas Area Rapid Transit (DART) is soliciting sealed offers under an Invitation for Bid (IFB) for the procurement of network patch cables and related equipment to support the Agency CCTV Upgrade and broader communications system modernization. This indefinite delivery/indefinite quantity contract requires the provision of new slim copper ethernet cables, single and multimode fiber patch cables, and 2-post secure wall mount server cabinets. The Authority mandates brand-name-only products from CXtec/CABLExpress, and offers for other brands will not be considered. All items must be delivered F.O.B. destination to DART Headquarters in Dallas, Texas, within 30 days of the contract award. The contract term is 30 days from the receipt of a written Notice to Proceed. Award is based on a review of pricing and responsibility, with a preference for the lowest bid, though DART reserves the right to accept any bid in its best interest. Bidders must submit a complete price schedule, representations and certifications, and a business questionnaire. Requirements include maintaining commercial automobile liability insurance of at least 1 million dollars per accident and providing a three-year warranty on all supplies. Compliance with Small Business Concern provisions and a drug-free workplace is mandatory. Offers must be submitted via the Bonfire hub portal and remain firm for 180 calendar days.
Dallas Area Rapid Transit

POSTED

16 days ago

DEADLINE

in 6 days
View Details
NAICS: 238190
SLED
VAF Overhead Door Replacement | Ref. 2098195
Solicitation # B-2098195
The Dallas Area Rapid Transit (DART) Authority is soliciting bids for the replacement of an existing overhead roll-up door at the VAF Annex Building located at 3021 Oak Lane in Dallas, Texas. The scope of work involves the removal of the existing door and operator and the installation of a new insulated rolling steel door, specifically the Overhead Door Corporation Model 625 or an approved equal, featuring 24-gauge steel slats, foam insulation, and a powder-coated finish in Sherwin-Williams SW917 blue. The project also includes the installation of two 2-horsepower gear-drive electric operators, such as LiftMaster Model GH, and the necessary wiring for push buttons and safety edges. The contractor is required to complete the project within 60 calendar days after the Notice to Proceed, ensuring operational continuity and compliance with the Texas Manual of Uniform Traffic Control Devices. A mandatory pre-bid site visit was scheduled for August 27, 2026, and the response deadline for bids is September 11, 2026. Bidders must submit a comprehensive package including a price schedule, a business questionnaire, and representations and certifications. A significant emphasis is placed on Small Business Concern (SBC) participation, requiring bidders to document good faith efforts to meet subcontracting goals and submit an Intent to Perform as a Subcontractor form. Evaluation is qualitative, focusing on the authenticity of SBC engagement and the technical ability to meet specifications. The contract is structured as a firm-fixed-price agreement, requiring a payment bond and adherence to strict reporting standards, including the submission of Vendor Payment Reports with every invoice to verify payments made to SBC subcontractors.
Dallas Area Rapid Transit

POSTED

19 days ago

DEADLINE

in 2 days
View Details
NAICS: 541512
SLED
RMIS (Risk Management Information System) Solution
Solicitation # P-2092544
Dallas Area Rapid Transit (DART) is soliciting proposals for a new Risk Management Information System (RMIS) to replace its existing RMIS and Environment, Health and Safety (EHS) systems. The objective is to implement a modern solution for the Risk Management and Agency Safety and Compliance Departments to efficiently track claims, lawsuits, and incidents, while facilitating data storage and incident report extraction. The scope of work includes the implementation and configuration of a system supporting incident, accident, risk, and safety management workflows, with required integrations into enterprise platforms such as Trapeze, Workday, and Maximo, and support for Single Sign-On authentication. The contract structure consists of a three-year base period with two optional one-year extensions. Key deliverables include recreated safety and compliance workflows, configured OSHA and Texas regulatory compliance reports, and comprehensive training materials. Award will be based on a trade-off process using a total composite score, where technical acceptability is weighted at 85 percent and price at 15 percent. Proposals are limited to 20 pages and must be submitted electronically via the DART Bonfire portal. The procurement includes specific requirements for Small Business Enterprise (SBE) participation and adherence to Texas state regulatory standards.
Dallas Area Rapid Transit

POSTED

about 2 months ago

DEADLINE

in 1 day
View Details