Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MIDWEST WELDING & MACHINE INC

UEI: F3M7E2PN5X44CAGE: 3Y292

MIDWEST WELDING & MACHINE INC is a federal contractor, registered under UEI F3M7E2PN5X44 and CAGE code 3Y292. It has been awarded $499,755 in federal contracts. Primary work spans Ornamental and Architectural Metal Work Manufacturing, Water and Sewer Line and Related Structures Construction, and Switchgear and Switchboard Apparatus Manufacturing. Top awarding agencies include Department Of The Interior, Department Of Defense, and Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

F3M7E2PN5X44

CAGE Code

3Y292

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationManufacturer of GoodsSubchapter S Corporation

NAICS Codes

332312Fabricated Structural Metal Manufacturing
332313Plate Work Manufacturing
332322Sheet Metal Work Manufacturing
332323Ornamental and Architectural Metal Work Manufacturing(Primary)
332439Other Metal Container Manufacturing
+4 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

MIDWEST WELDING & MACHINE INC specializes in precision metal fabrication, welding, and machine shop services for government and industrial applications. Leveraging advanced CNC machining, arc and TIG welding, and structural metal assembly techniques, the company delivers custom fabricated components...

MIDWEST WELDING & MACHINE INC specializes in precision metal fabrication, welding, and machine shop services for government and industrial applications. Leveraging advanced CNC machining, arc and TIG welding, and structural metal assembly techniques, the company delivers custom fabricated components and assemblies requiring tight tolerances and high structural integrity. Their technical expertise includes sheet metal forming, machined part production, and repair of critical mechanical systems, often supporting applications in rugged or high-stress environments. The firm’s capability centers on turning engineering specifications into durable, mission-ready hardware using industry-standard materials such as carbon steel, stainless steel, and aluminum alloys. Award history is not available to identify specific agency relationships or project types. Consequently, no definitive patterns can be established regarding federal client engagement or mission-specific work scopes. The company operates under NAICS 332323, which classifies it as a Metal Fabrication facility engaged in the production of fabricated metal products not elsewhere classified. In practice, this means the business supports defense, energy, transportation, and infrastructure sectors through custom fabrication of brackets, housings, frames, and mechanical subsystems. Their market positioning is that of a niche, precision-focused fabricator serving clients requiring reliable, small-to-medium batch production with rigorous quality control. MIDWEST WELDING & MACHINE INC is a small, locally owned business structured as a 2L entity, headquartered in Bozeman, Montana. The company does not hold any federal certifications such as 8(a), HUBZone, or WOSB. Its geographic presence is localized, with operations focused on serving regional government and industrial contractors. The firm’s government market positioning is that of a reliable, on-demand fabricator capable of supporting specialized procurement needs without reliance on formal certification programs.

Key Performance Metrics

Awards Count

10

All time

Active

0

Currently performing

Completed

10

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by Agency Over Time
Awards by Place of Performance

Compete with MIDWEST WELDING & MACHINE INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for MIDWEST WELDING & MACHINE INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in MIDWEST WELDING & MACHINE INC's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators and the installation of new slide gates. Electrical and instrumentation work includes the replacement of motor control center components and general system improvements. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, lead abatement, metals fabrication, painting, coatings, trucking, hauling, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, at 2:00 PM PT, ahead of the final bid date on November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Electrical upgrades will include new Southern California Edison services and standby power systems. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified firms, with a strong encouragement for DBE participation. Bids are due by October 29, 2025, at 2:00 PM. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
City of San Diego’s Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A; K-27-2470-DBB-3-C
Solicitation # BP26019
The City of San Diego's Alvarado Trunk Sewer Phase IV and Water Main Relocation Bid Package A (K-27-2470-DBB-3-C) is a civil infrastructure project with an estimated construction cost of 35.1 million dollars. The scope of work is divided into two primary components: the installation of approximately 5,216 linear feet of new sewer pipe, including groundwater dewatering, bypass pumping, and trenchless work, and the replacement of approximately 5,886 linear feet of existing 6, 8, 12, and 16 inch AC water mains and associated appurtenances. Additional requirements include the construction of temporary access roads, traffic control, repaving, signal loop replacement, curb ramp installation, and comprehensive site restoration. The project has a total completion timeframe of 550 working days, which includes a 120-day Plant Establishment Period and a 25-month Long Term Maintenance and Monitoring Agreement for vegetated areas. This is a prevailing wage project subject to a Project Labor Agreement. Bidders must adhere to specific bonds, insurance, and confidentiality requirements, and are encouraged to provide certifications for disadvantaged or small business statuses, such as DBE, WOSB, or VOSB. Subcontractor proposals are requested by Burtech Pipeline Incorporated by October 26, 2026, with the final bid due to the City by October 28, 2026.
BURTECH PIPELIINE INCORPORATED

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details