Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

ONEIDA-STANTEC JV LLC

UEI: Q75KA2PDMP88CAGE: 9VWT6

ONEIDA-STANTEC JV LLC is a federal contractor, registered under UEI Q75KA2PDMP88 and CAGE code 9VWT6. It has been awarded $10,181,495 across 9 federal contracts. Primary work spans Remediation Services, Engineering Services, and Environmental Consulting Services. Top awarding agencies include Department Of Defense, Department Of Homeland Security, and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

Q75KA2PDMP88

CAGE Code

9VWT6

Entity Structure

Partnership or Limited Liability Partnership

Established

N/A

Business Classifications

1B1E1S23272XJSLJNBOW

NAICS Codes

237990Other Heavy and Civil Engineering Construction
541330Engineering Services
541611Administrative Management and General Management Consulting Services
541620Environmental Consulting Services(Primary)
541690Other Scientific and Technical Consulting Services
+1 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

ONEIDA-STANTEC JV LLC specializes in environmental remediation services for defense infrastructure, delivering technical solutions for contaminated site cleanup, soil and groundwater restoration, and hazardous material management within complex military facilities. Their work centers on long-term en...

ONEIDA-STANTEC JV LLC specializes in environmental remediation services for defense infrastructure, delivering technical solutions for contaminated site cleanup, soil and groundwater restoration, and hazardous material management within complex military facilities. Their work centers on long-term environmental compliance and sustainable remediation strategies, particularly in support of power plant modernization and infrastructure refurbishment programs. The contractor brings expertise in engineered containment systems, remedial action planning, regulatory permitting under RCRA and CERCLA, and field implementation of in-situ and ex-situ treatment technologies. Their approach integrates site characterization, risk assessment, and performance monitoring to ensure regulatory alignment and mission continuity for critical defense assets. The company maintains a focused relationship with the Department of Defense, providing environmental remediation services for energy infrastructure projects, including powerhouse refurbishments across the Southwestern Division. Their work supports DoD’s broader sustainability and resilience goals by addressing legacy contamination while enabling operational continuity during facility upgrades. The contractor’s contracts reflect a pattern of long-term, performance-based engagements, indicating deep familiarity with DoD environmental standards, procurement protocols, and mission-critical scheduling constraints. Their primary industry focus is remediation services under NAICS 562910, positioning them as a niche provider of environmental cleanup solutions for defense and industrial energy systems. They specialize in complex, multi-phase projects requiring coordination between engineering, regulatory agencies, and military operations, distinguishing themselves through technical rigor in hazardous waste handling and compliance-driven project execution. As a joint venture structured under 2K entity classification, ONEIDA-STANTEC JV LLC operates from Milwaukee, Wisconsin, with no public certifications on record. The firm leverages its partnership model to combine technical depth with scalable execution capacity, serving federal clients through responsive, mission-aligned environmental services without reliance on small business set-asides or minority certifications.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$6.0M59.3%
Department Of Homeland Security$2.6M25.6%
Department Of The Interior$1.5M15.1%
Awards by NAICS
562910 - Remediation Services$5.8M56.9%
541330 - Engineering Services$2.6M25.6%
541620 - Environmental Consulting Services$1.8M17.6%
Awards by Agency Over Time
Awards by Place of Performance

Compete with ONEIDA-STANTEC JV LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ONEIDA-STANTEC JV LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in ONEIDA-STANTEC JV LLC's top NAICS codes and agencies

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 13 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details