Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

OZARK AEROWORKS LLC Springfield MO 65807 USA

UEI: SLED_0C3F48CED65D3BEA

OZARK AEROWORKS LLC Springfield MO 65807 USA is a federal contractor, registered under UEI SLED_0C3F48CED65D3BEA. It has been awarded $2,600,000 across 1 federal contract. Primary work spans Engineering Services. Top awarding agencies include FA8626 Aflcmc Wn/lp.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_0C3F48CED65D3BEA

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
FA8626 Aflcmc Wn/lp$2.6M100%
Awards by NAICS
541330 - Engineering Services$2.6M100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in OZARK AEROWORKS LLC Springfield MO 65807 USA's top NAICS codes and agencies

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District, is a professional services engagement focused on the design and construction of a new municipal groundwater production well and the abandonment of the existing Corydon Well in California. The project is divided into two primary phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management for the drilling and abandonment process; Phase 2 involves architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for the equipping, testing, and commissioning of the new well. The total estimated project cost is 2,260,788 dollars, with a significant portion allocated to contractual and construction costs. The project is partially funded by the Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, requiring strict adherence to federal grant requirements, including 2 CFR Part 200 procurement standards, the Build America, Buy America Act, and specific reporting cycles. Qualified firms, particularly certified DBE and small businesses, are encouraged to apply. Requirements for the selected consultant include providing performance and payment bonds for 100 percent of the contract price, maintaining comprehensive general and automobile liability insurance, and complying with California prevailing wage laws and Cal/OSHA standards. Proposals must be submitted via the PlanetBids Vendor Portal, and the award will be based on the most advantageous proposal, considering qualifications and price.
GEI Consultants, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details