Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PCA NV

UEI: JJBEKHNBBFK7

PCA NV is a federal contractor, registered under UEI JJBEKHNBBFK7. It has been awarded $186,235 across 3 federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction and All Other Specialty Trade Contractors. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

JJBEKHNBBFK7

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$186.2K100%
Awards by NAICS
237110 - Water and Sewer Line and Related Structures Construction$170.5K91.6%
238990 - All Other Specialty Trade Contractors$15.7K8.5%
Awards by Agency Over Time
Awards by Place of Performance

Compete with PCA NV

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for PCA NV

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in PCA NV's top NAICS codes and agencies

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements project in Kerman, California. This comprehensive redesign project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. The scope of work further extends to the installation of a sludge dewatering and wasting pipeline with a trailer-mounted pump system and the construction of two soil cement lined sludge dewatering ponds. Additional requirements include a reinforced concrete pad for an emergency generator, a new CMU operations and electrical building equipped with HVAC and plumbing, and a facility-wide PLC/SCADA monitoring system. Miscellaneous civil improvements such as asphalt resurfacing, grading, and piping are also required. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation, posted on September 22, 2026, has a response deadline of September 29, 2026. It is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The prime contractor, James W. Fowler Co., is actively seeking subcontractor pricing and encourages the participation of M/W/DBE firms, offering assistance with equipment, supplies, bonding, and insurance to maximize their involvement. The project also encourages the use of apprentices and requires quality control testing. All work must be performed according to the plans and specifications provided on the contractor's website.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing mains on Walnut Street, Ebony Street, and 247th Place. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, hot taps, trucking, soil and material testing, and a range of paving services such as ready-mix concrete, PCC and AC paving, AC grind and cap, and striping. The project also requires traffic control services. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The prime contractor is specifically seeking quotes from DBE, MBE, SBE, and WBE firms and may require payment and performance bonds totaling 100 percent of the subcontractor's bid, with bond premiums reimbursed up to 1.5 percent. All quotations and written verifications of intent to bid must be submitted to Matt Metoyer by the deadline of October 19, 2026, at 1:00 PM. Selected subcontractors will be required to execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project in San Jacinto, California, for the Eastern Municipal Water District. The project aims to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. The scope of work includes civil and site work, construction of a process building, installation of advanced membrane treatment equipment such as UF and RO systems, underground utilities, and process piping. Additionally, the project involves the construction of brine ponds, including site preparation, lined evaporation ponds, and all necessary mechanical, electrical, instrumentation, and control systems to deliver a fully operational water treatment facility. This solicitation specifically targets Disadvantaged Business Enterprises, including those with MBE, WBE, and SBE certifications, and requires a current DBE certification to be submitted with the bid. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid. Subcontractors who plan to further subcontract any portion of their scope must document the first five steps of the Six Good Faith Efforts. Quotes and bid submissions are due by October 20, 2026, at 10:00 AM PT.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 27 days
View Details