Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SAPPER WEST, INC. 1927 49TH STREET SACRAMENTO CA 95819-4803 US

UEI: SLED_4EFAE45D6A3AA4C1

SAPPER WEST, INC. 1927 49TH STREET SACRAMENTO CA 95819-4803 US is a federal contractor, registered under UEI SLED_4EFAE45D6A3AA4C1. It has been awarded $1,328,292 in federal contracts. Primary work spans Remediation Services and Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_4EFAE45D6A3AA4C1

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Sapper West, Inc. specializes in environmental remediation, site restoration, and specialized civil construction. Their core capabilities include the removal and cleanup of impacted soils, lead-based paint mitigation, and the decommissioning of firing ranges. The company demonstrates technical exper...

Sapper West, Inc. specializes in environmental remediation, site restoration, and specialized civil construction. Their core capabilities include the removal and cleanup of impacted soils, lead-based paint mitigation, and the decommissioning of firing ranges. The company demonstrates technical expertise in restoring contaminated sites to natural conditions and performing critical utility infrastructure work, such as water service installations. The company works exclusively with the Department of the Interior, providing a range of environmental and facility maintenance services across various national parks and recreation areas, including Sequoia National Park, Lake Mead National Recreation Area, and Devils Postpile National Monument. Their industry focus centers on pollution remediation services and heavy civil engineering construction. In practice, this involves managing hazardous material removal and executing site-specific infrastructure improvements within protected federal lands. Sapper West, Inc. is based in Sacramento, California, positioning them to support government operations throughout the Western United States.

Key Performance Metrics

Awards Count

4

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with SAPPER WEST, INC. 1927 49TH STREET SACRAMENTO CA 95819-4803 US

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SAPPER WEST, INC. 1927 49TH STREET SACRAMENTO CA 95819-4803 US

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SAPPER WEST, INC. 1927 49TH STREET SACRAMENTO CA 95819-4803 US's top NAICS codes and agencies

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses electrical and instrumentation improvements, the installation of access platforms, sump pump discharge line rerouting, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran, Service-Disabled Veteran, Women-Owned, and HUBZone small businesses. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, electrical and instrumentation, trucking, concrete restoration, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details