Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SCHWENKER, WILLIAM

UEI: N2KFQ2KGFE63

SCHWENKER, WILLIAM is a federal contractor, registered under UEI N2KFQ2KGFE63. It has been awarded $624,684 in federal contracts. Primary work spans Sewage Treatment Facilities, Poured Concrete Foundation and Structure Contractors, and Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

N2KFQ2KGFE63

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

28

All time

Active

0

Currently performing

Completed

28

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Compete with SCHWENKER, WILLIAM

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SCHWENKER, WILLIAM

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SCHWENKER, WILLIAM's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates, Inc., operated for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Engineering Storage/Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with FNC guidelines, OSHA and EPA regulations, and Indiana state and local codes. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. A mandatory site visit was scheduled for November 10, 2026, with a proposal deadline of November 20, 2026. Bidders must submit a single lump sum contract bid on company letterhead, including a detailed cost breakdown, a timeline for completion, and proof of a valid Indiana Contractor's License. Award will be based on Best Value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors are required to maintain comprehensive insurance, including General Liability of at least 1 million dollars per occurrence and Automobile Liability. Compliance with Davis-Bacon Act wage rates is mandatory. The contract includes Net 30 payment terms, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and a release of liens. All workmanship is guaranteed for one year following the acknowledgment of substantial completion.
Atterbury Job Corps. – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details