Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Large Diameter Force Main Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity with Garney Companies, Inc. focuses on the installation of large diameter pressure pipes and force mains for Charles County Government projects. The scope of work involves laying Ductile Iron Pipe and Prestressed Concrete Cylinder Pipe with diameters of 36 inches or larger. To ensure continuous system operation, the contractor is responsible for executing pipe tapping, line stops, and bypass pumping using heavy lifting equipment, ultimately delivering a fully installed and tested force main system. The project is designated as a set-aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises under NAICS code 237110. Interested parties must submit their responses by November 9, 2026.

General Info

Documents

This scope was carved out of RFP 27-002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Companies, Inc.
ContactsNo contacts available
OfficeN/A
Organization / AgencyGarney Companies, Inc.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs large diameter pressure pipes and force mains for prime contractors on Charles County Government projects. Lays Ductile Iron Pipe (DIP) and Prestressed Concrete Cylinder Pipe (PCCP) 36-inches in diameter or larger. Executes pipe tapping, line stops, and bypass pumping to maintain system operation. Uses heavy lifting equipment and bypass pumping systems. Delivers an installed and tested force main system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Garney Companies, Inc.

Same awarding agency

NAICS: 237110
New
MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Solicitation # RFP 27-002
Solicitation RFP 27-002 is a design-build project for the MWWTP Effluent FM Surge and Transient system in Maryland, managed by Garney Companies, Inc. for the Charles County Government. The scope of work involves providing a steady-state hydraulic profile for the existing force main, designing and constructing a new standpipe, and installing three concrete valve vaults. Key technical requirements include the installation of influent and effluent pipes with a minimum 42-inch diameter, routing a piped overflow from the standpipe to the effluent pump station wet well, and implementing electrical feeder and control circuits from existing panels. The project also requires the replacement of an intermediate highpoint combination valve with a specific 6-inch A.R.I. Model D-60-C-NS valve. The total period of performance is 905 consecutive calendar days, split into a 365-day design phase and a 540-day construction phase. Rigorous qualification standards are mandated for the design-build team, requiring both the lead design and construction firms to have completed at least three projects involving large diameter pipes (36-inches or larger) and surge tanks with contract values exceeding 2 million dollars for utilities with a capacity of 5 mgd or greater. Key personnel, including the Design Manager and Construction Superintendent, must meet specific licensure and experience requirements, including Maryland Professional Engineer licenses where applicable. Acceptance is contingent upon successful hydrostatic testing of the standpipe for seven consecutive days and specific performance testing for transient conditions. A lump sum allowance of 50,000 dollars is provided for permit fees.
Water and Sewer Line and Related Structures Construction

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS