Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

SWEAT US LLC 6901-A N 9TH AVE STE 248 Pensacola FL 32504-6638 USA

UEI: SLED_9DD581C0D87E4D77

SWEAT US LLC 6901-A N 9TH AVE STE 248 Pensacola FL 32504-6638 USA is a federal contractor, registered under UEI SLED_9DD581C0D87E4D77. It has been awarded $629,154 across 1 federal contract. Primary work spans Support Activities for Forestry. Top awarding agencies include Idaho State Office.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_9DD581C0D87E4D77

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with SWEAT US LLC 6901-A N 9TH AVE STE 248 Pensacola FL 32504-6638 USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SWEAT US LLC 6901-A N 9TH AVE STE 248 Pensacola FL 32504-6638 USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SWEAT US LLC 6901-A N 9TH AVE STE 248 Pensacola FL 32504-6638 USA's top NAICS codes and agencies

NAICS: 115310
New
International
Splatsin Jackpine Wildfire Risk Reduction Fuel Treatment
Solicitation # 234597
The Splatsin Jackpine Wildfire Risk Reduction Fuel Treatment project, solicitation number 234597, is a fuel management initiative issued by the Splatsin First Nations in British Columbia. The project aims to reduce wildfire risks to the Shihiya School, Water Treatment Facility, and Jackpine road residences within the Enderby IR#2 area. Utilizing a thin from below approach to create a shaded fuel break, the contractor will perform tree hand felling, hand thinning, hand pruning, debris hand piling, burning, and off-site debris removal across 12.8 hectares. Key technical requirements include maintaining surface fuel loading below 0.5 kg/m2, removing 100 percent of conifers in specific layers within 5 meters of Layer 1 crown driplines, and adhering to strict stump height and angle specifications. The contract term runs from November 9, 2026, to April 30, 2027. To be eligible, bidders must be in good standing with WorkSafe BC, be a certified SAFE Company or endorsed by the BC Forest Safety Council, and have completed a comparable project within the last 24 months. A mandatory site visit is required prior to bidding. While the basis of award is generally the lowest bid meeting all eligibility requirements, the company reserves the right to award the contract at its sole discretion. Tenders must be submitted by 12:00 pm on October 30, 2026, via the BC Bid portal or hand delivery to the Splatsin Band Office. Failure to meet the Fuel Management Prescription for Unit A1 may result in payment holdbacks or penalties.
Splatsin First Nations

POSTED

2 days ago

DEADLINE

in 27 days
View Details
NAICS: 115310
New
International
PL28TGC004 - Summer Tree Planting - Prince George
Solicitation # PL28TGC004
The PL28TGC004 contract is a solicitation by BC Timber Sales for summer tree planting services in the Prince George Business Area. The primary scope of work involves planting approximately 1,365,000 trees and 1,197,000 fertilizer teabags, with a final completion deadline of August 7, 2027. The contractor is responsible for the entire operational chain, including the pickup and transportation of seedlings from nurseries, the management of silviculture camps on Crown land via Special Use Permits, and the implementation of an Environmental Management System. Performance is measured against a minimum acceptable planting quality standard of 85 percent, with inspections conducted using the Ministry of Forests Planting Quality Inspection System. Award is based on the lowest priced compliant tender, though the BCTS Planting Contractor Rating System may provide participating contractors a price advantage of up to 7 percent during evaluation. Mandatory requirements for the contractor include a valid Tax Verification Letter from the BC Ministry of Finance, Commercial General Liability and Automobile Liability insurance of at least 2 million dollars each, and BC Forest Safety Council SAFE Company certification for all subcontractors. The contractor must also provide a qualified team of full-time, non-planting key personnel, including a Project Supervisor, Foreperson, Quality Checker, and Pay Plot Checker, as well as a Registered Professional Forester or Registered Forest Technologist to supervise quality and certify final reports. Submissions from U.S. suppliers are not eligible for evaluation.
BC Timber Sales Branch

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 115310
New
SLED
(RFFCP2022) Tribal Capacity Building Program – Berry Creek Rancheria (#1742-RFFCP)
Solicitation # 1742-RFFCP
The Sierra Nevada Conservancy is providing funding to the Berry Creek Rancheria of the Maidu Indians of California through the Tribal Capacity Building Program to implement indigenous land stewardship and fire resilience initiatives in Butte County. The project focuses on three specific locations: the Bald Rock Trail Head in Plumas National Forest, 338 Raccoon Road, and the Berry Creek Rancheria Cemetery. Key activities include hazardous fuel reduction, vegetation management, invasive species removal, ecological restoration, and the establishment of native plants. The scope of work encompasses hazard tree removal, manual and mechanical thinning, the construction of control lines, and various biomass management techniques such as chipping, mastication, and piling. Additionally, the project will utilize broadcast cultural and prescribed burning and include the installation of a prefabricated native seed storage shed. The primary objective of this initiative is to enhance ecosystem health and reduce the risk of catastrophic wildfires by fostering a fire-adapted landscape within the Berry Creek Tribal Cultural Landscape. By increasing the capacity of the Grantee to lead prescribed fire efforts and post-fire recovery, the project supports long-term cultural resource stewardship. This effort is supported by a Notice of Exemption under the California Environmental Quality Act, justifying the project's goals of ecological restoration and fuel reduction. Coordination for the project involves the Sierra Nevada Conservancy and the Berry Creek Restoration Workforce to ensure the successful integration of traditional indigenous practices with modern land management.
Sierra Nevada Conservancy

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 115310
New
SLED
Florida Forest Service Statewide Wildfire Mitigation Services (Re-Bid)
Solicitation # ITB FFS 26 27 58
The Florida Department of Agriculture and Consumer Services, Florida Forest Service is soliciting competitive bids under ITB FFS 26 27 58 to establish fixed rate Term Agreements for statewide wildfire mitigation services. The scope of work includes forestry mowing, mulching, chopping, vegetation grinding, tree removal, land preparation, and fireline establishment. The agency intends to award up to ten agreements per service level within each Florida Forest Service Region. Bids are evaluated primarily on the fixed Maximum Rate Unit Price provided on the Price Sheet, with preferences given to businesses implementing drug-free workplace programs and certain foreign manufacturers with significant Florida operations. Contractors must provide all necessary labor, equipment, and supervision, including a mandatory on-site foreman to avoid financial penalties. Technical requirements include specific roller drum dimensions for chopping and strict standards for fireline buffers and on-site burning using Air Curtain Incinerators. Awarded vendors must be registered with E-Verify, maintain comprehensive worker's compensation insurance, and certify compliance with various state and federal regulations, including those regarding the boycott of Israel and the use of coerced labor. Sealed bids must be physically delivered to the Purchasing Office in Tallahassee by October 20, 2026, at 5:00 PM ET, as electronic submissions are not accepted. Performance begins within 30 calendar days of a purchase order, with payments issued via state government warrant following a five-day inspection period. All state obligations are contingent upon annual legislative appropriations.
Department of Agriculture and Consumer Services

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 115310
New
Federal
Sierra National Forest (SNF5) Coyote Fuels Reduction and Site Preparation.
Solicitation # 127EAS26Q0048
The Sierra National Forest (SNF5) Coyote Fuels Reduction and Site Preparation project, solicitation 127EAS26Q0048, is a total small business set-aside under NAICS 115310. The contract requires a contractor to perform fuels management and site preparation in the Tamarack Ridge and Coyote Sno-Park areas of the High Sierra Ranger District. Primary objectives include felling standing dead trees, thinning surviving conifer saplings, and treating created and existing slash, brush, and remnant Creek Fire right-of-way material to prepare the land for future tree planting. The period of performance is scheduled from October 16, 2026, to October 16, 2027. The scope of work consists of base requirements covering approximately 386.5 acres across Units 7, 32, 36, and 102, with optional requirements for an additional 1,010 acres across several other units. A specialized optional requirement includes providing a biological monitor for approximately 65 days to ensure Yosemite Toad compliance in Unit 3. Award will be determined using a tradeoff process evaluating technical approach, responsibility, past performance, and price. Contractors must adhere to strict fire prevention plans, resource protection standards, and Department of Labor wage determinations for the Fresno, California area. Invoicing is managed electronically through the Department of Treasury's Invoice Processing Platform.
Csa Southwest 2 Usda-Fs

POSTED

3 days ago

DEADLINE

in 6 days
View Details