Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Forestry and Parks - Request for Proposal - Rainbow Lookout Tower FireSmart

Open
27TDRHFD806International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Alberta Forestry and Parks is seeking a contractor for the Rainbow Lookout Tower FireSmart project to reduce surface fuel loading and improve site resilience against wildfires. The scope of work involves treating approximately 7.15 hectares of land using a combination of hand crew operations and mechanical mulching to achieve specific fuel modification goals, including a minimum three-metre crown spacing, pruning live trees to two metres above ground level, and the removal of ladder fuels and dead or hazardous trees. Additionally, the contractor must construct a 10 km access route utilizing existing linear disturbances, which includes two watercourse crossings that must be completed during winter under frozen conditions. The contractor is responsible for obtaining all necessary permits, including Temporary Diversion Licences, and ensuring compliance with the Public Lands Act and other provincial legislation. The project is scheduled to run from December 15, 2026, to March 31, 2027, with a fixed-price payment structure based on a price per hectare. Proposals are evaluated based on mandatory requirements, resource experience, and reference checks, with the highest scoring compliant proposal selected for award. The contractor must maintain comprehensive insurance, including $2,000,000 in general liability and $2,000,000 in automobile liability, and provide bi-weekly status reports. Payment is issued within 30 days of invoice receipt, contingent upon the Province's representative verifying completed areas via GPS shape files. All operations must be conducted with reasonable skill and diligence, ensuring that ground conditions are sufficiently frozen or dry to prevent unacceptable soil disturbance.

General Info

Contractor will reduce wildfire fuel and build access for Rainbow Lookout Tower.

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, Low prioritycontract-document
Low
PDF, Low priorityother
Low

Read all 4 documents

Due in 20 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 4 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A

Full Description

Show more
Project Background- Throughout recent fire seasons, there has been an increase in the number of lookout towers impacted by wildfires. In 2024, the High Level Area initiated a project to FireSmart a 100 m radius around its lookout towers to reduce wildfire risk and improve site resilience. This year, we are proposing to complete FireSmart treatments around the Rainbow Lookout Tower. The proposed treatment area is approximately 7.15 hectares. Project Objectives- The primary objective of this project is to reduce overall surface fuel loading surrounding the Rainbow Lookout Tower in order to decrease potential wildfire intensity, reduce the rate of fire spread, and limit the likelihood of crown fire development. The treatment is designed to modify potential fire behaviour and enhance suppression opportunities within and around the lookout tower site, thereby improving the protection and long-term operability of this critical wildfire detection infrastructure. The proposed treatment area is approximately 7.15 hectares and will focus on reducing fuel loads surrounding the tower through a combination of hand crew operations and mechanical mulching treatments. The predominant fuel types within the project area have been identified as D2 (Green Aspen) and M2 (Boreal Mixedwood, 50% or less conifer). The successful contractor will also be responsible for constructing access to the lookout tower site. The proposed access route is approximately 10 km in length and will primarily utilize existing linear disturbances. There are two watercourse crossings located along the access route, approximately 500 m and 3 km from the staging area, respectively. The first crossing involves a large permanent stream where an existing bridge is present but currently closed due to stability concerns. The second crossing is a small permanent stream located approximately 3 km from the staging area. Both crossings will require winter construction and must be frozen in accordance with all applicable legislation, regulations, and approval requirements under the Public Lands Act and other relevant provincial legislation. The contractor will be responsible for obtaining all required authorizations and permits, including a Temporary Diversion Licence (TDL) where applicable, and ensuring all crossing construction activities comply with environmental and regulatory requirements. Related Project Documents – A PDF document will be with the posting of the RFP. It will be a georeferenced map of Rainbow Lookout Tower with the boundary and total area.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
International
Forestry and Parks - Request for Proposal - Zama City FireSmart
Solicitation # 27TDRHFD805
Issued by Alberta Forestry and Parks, solicitation 27TDRHFD805 is a Request for Proposal to implement FireSmart treatment activities in Zama City, Alberta. The project aims to reduce wildfire risk and hazardous fuel loads to decrease crown fire intensity and ember transport. The scope involves the retreatment of four specific areas—Unit 12, Unit 13, Unit 20, and Unit 23—covering a total of 34 hectares. The contractor is required to utilize a combination of hand crews with chainsaws and mechanized mulching equipment to perform mulching, thinning, and pruning. Key technical requirements include achieving a minimum three-metre crown spacing, removing all standing dead or structurally compromised trees, pruning retained live trees to two metres above ground level, and ensuring that disposed woody debris does not exceed five centimetres in height. The contractor must provide bi-weekly status reports and adhere to strict safety and environmental standards, including operating under frozen or dry ground conditions to minimize soil disturbance. Personnel requirements include at least two certified mulcher operators and two hand crew members with valid chainsaw certification, as well as Standard First Aid and CPR certifications. Proposals will be evaluated based on mandatory requirements and scoring, with the final award given to the highest scoring compliant proposal. Payment terms are set at 30 days from receipt of invoice, with a percentage holdback retained until a statutory declaration is provided confirming all labor and equipment obligations have been met. The deadline for submission via the Alberta Purchasing Connection is December 7, 2026.
Forestry and Parks

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 115310
New
International
Forestry and Parks - Request for Proposal - Rainbow Lake FireSmart Project
Solicitation # 27TDRHFD804
Alberta Forestry and Parks has issued a Request for Proposal for the Rainbow Lake FireSmart Project to mitigate wildfire risks for the Town of Rainbow Lake. The project focuses on reducing surface fuel loading to decrease fire intensity and the rate of spread, specifically targeting the West side of the community. The scope of work involves the treatment of three units—F2 (10.5ha), Unit 26 (8.1ha), and Unit 23 (3.32ha)—totaling 21.92 hectares. The selected contractor will utilize hand crews and mechanical mulching to achieve a minimum three-metre crown spacing and prune retained live trees to a height of two metres above ground level. The anticipated period of performance is from December 15, 2026, to March 31, 2027. Contractors must maintain general liability insurance of at least 2 million dollars, with additional coverage for sudden pollution and forest fire fighting expenses. Payment is based on a fixed price per hectare of completed area, requiring GPS shape files for invoicing and a percentage holdback until a statutory declaration of paid liabilities is provided. Proponents must provide a valid Certificate of Recognition (COR) or Small Employer Certificate of Recognition (SECOR) and submit proposals electronically to Bentley Fawcett by December 7, 2026. Award selection is based on the highest scoring compliant proposal, following a screening of mandatory requirements and potential shortlist presentations and reference checks.
Forestry and Parks

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 115310
New
Federal
Airport BAER Weed Treatment
Solicitation # 127EAT27Q0004
Solicitation 127EAT27Q0004 is a combined synopsis and request for quotation for the Airport BAER Weed Survey and Treatment project. This firm-fixed-price acquisition is a total small business set-aside under NAICS code 115310, with a size standard of $11.5M. The project requires the procurement of services to survey and treat up to 200 acres of non-native plants in areas affected by the 2024 Airport Fire within the Trabuco Ranger District of the Cleveland National Forest. Work will cover diverse terrains including trails, meadows, riparian areas, and campgrounds, prioritizing infestations resulting from fire and suppression activities. The period of performance begins within seven days of award and extends through September 30, 2027. The contractor must provide a survey crew of at least two qualified botanists and a treatment crew consisting of one lead specialist and three to five technicians. Requirements include a valid California Pesticide Use Applicator License and registration to work in Orange and Riverside Counties. Award will be based on best value, specifically the highest technical rating provided the price is fair and reasonable and past performance is acceptable or neutral. Offerors must submit a technical approach, pricing, and three relevant past performances from the last three years to [email hidden] by November 30, 2026.
Csa Southwest 3 Usda-Fs

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 115310
New
Federal
F--Invasive plant Control, Okeechobee NWR, FL
Solicitation # 140FF027Q0084
The U.S. Fish and Wildlife Service is soliciting quotes for invasive plant control at the Everglades Headwaters National Wildlife Refuge Okeechobee Unit in Florida. This firm fixed price contract, designated as a total small business set-aside under NAICS code 115310, requires the contractor to provide all labor, equipment, and materials to treat approximately 70 acres of land. The primary objective is the treatment of Brazilian pepper and Japanese/Old World fern with a required 95% control rate for both species. The project must be completed within 30 days of commencement, with an overall performance period extending from the date of award through September 30, 2027. Award decisions will be based on a best-value assessment where technical capability and past performance are weighted more heavily than price. Technical evaluations focus on the management approach and the requirement for key personnel to possess at least five years of relevant experience, while past performance is verified through questionnaires covering the previous three years. To be eligible, contractors must maintain an active registration in the System for Award Management and utilize the Invoice Processing Platform for electronic payments. Submissions must include a price proposal and a technical volume, including a GIS tracks map upon project completion to verify site coverage.
Fws Contracting Activity

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 115310
New
Federal
Airport BAER Seed Collection
Solicitation # 127EAT27Q0003
Solicitation 127EAT27Q0003 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Airport BAER Seed Collection project. This total small business set-aside, under NAICS code 115310, seeks a contractor to locate, identify, map, collect, clean, and deliver between 100 and 300 pounds of native plant seeds, including grasses, forbs, herbs, shrubs, and tree seeds/acorns. The work will be performed within the Trabuco Ranger District of the Cleveland National Forest to support post-fire restoration of the 2024 Airport Fire burn area. The period of performance extends from the date of award through September 30, 2027, with work required to commence within seven calendar days of the award. The contract will be awarded on a best-value basis to the highest technically rated offeror, provided the price is fair and reasonable and past performance is acceptable or neutral. Offerors must submit a technical approach detailing their timeframe, personnel, and deliverables, along with three relevant past performance references from the last three years. Strict requirements are in place for seed packaging, labeling, and storage to prevent contamination and degradation, and all deliveries must comply with the Federal Seed Act. Quotations must be submitted via email to [email hidden] by November 20, 2026, at 12:00 PM MT. All prospective contractors must be registered in the System for Award Management to be eligible for the award.
Csa Southwest 3 Usda-Fs

POSTED

1 day ago

DEADLINE

in 3 days
View Details

More opportunities from Forestry and Parks

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS