Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Forestry and Parks - Request for Quotes - Queen Elizabeth Provincial Park 2 - Water Line Replacement

Open
AB-2026-07396International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, solicitation number AB-2026-07396, involves the replacement of aging distribution water lines at Queen Elizabeth Provincial Park in Alberta. The primary objective is to install new 50mm HDPE water lines with 12-gauge tracer wire from the pump house to both the shop and the staff house using directional drilling. The project is managed by Forestry and Parks, with a response deadline of November 30, 2026. The contractor is responsible for providing all necessary equipment, labor, and supplies. Key tasks include performing line locates, utilizing hydro-vac excavation for CC valve exposure, and replacing all fittings and connections. The scope also requires rigorous pressure testing of the valves, the reinstatement of removed steel barrier posts and concrete steps, and the restoration of the concrete apron to 97 percent compaction. While Alberta Parks will provide a site map and certain materials, the contractor must ensure all excavations are brought up to grade for settlement.

General Info

Replace water lines at Queen Elizabeth Provincial Park via directional drilling by November 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / AgencyForestry and Parks
Office AddressN/A
Contacts
Robert McGheeProject Manager

Full Description

Show more
PROJECT BACKGROUND: The distribution water line connecting pump house to the staff house and shop has suffered continuous failures due to its age. PROJECT OBJECTIVE: Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the existing CC valve at the shop by means of directional drilling. Replace existing distribution water line to new 50mm HDPE from existing main CC valve at pump house to the replaced CC valve at the staff house. SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work: 1. Any required line locates are the responsibility of the Contractor. 2. Remove steel barrier posts in front of pump house and set aside for reinstalment. 3. Remove front concrete step at pump house and set aside for reinstalment. 4. Partially excavate down to main CC valve, using a step downside method of embankment then expose CC valve along with both existing water line connections by means of hydro-vac. This procedure to be used on all three CC valves. 5. Directional drill new 50mm HDPE water line with 12-gauge wire tracer wire from pump house to existing CC valve in front of the shop. a. All existing fittings and connections will be replaced on existing CC valves. 6. Directional drill new 50mm HDPE water line with 12-gauge tracer wire from pump house to replaced CC valve on east side of the staff house. 7. All existing fittings and connections will be replaced on existing water line from staff house to the replaced CC valve. 8. Pressure test to be completed to the closed existing and replaced CC valves (x3) for a min of 15 minutes, repeated again to the opened CC valves (x2 shop and house) for min of 15 minutes. 9. Once pressure test is confirmed all excavations to be brought up over grade for settlement. 10. Reinstall Barrier posts level, with a minimum of 4’ above ground, similar height prior to removal. 11. Reinstall concrete apron with 97% compaction to the grade material – material to be provided by Alberta Forestry and Parks. 12. Existing water lines except for staff house CC valve will not be removed and all line locates to be completed by Alberta Parks with site map included with RFQ. Refer to the RFQ document for additional information.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Forestry and Parks

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS